WEBB SL 20 (0086-14-065)

Items: 166

County: WEBB
Length: N/A
Highway: SL 20
District: LAREDO
Control Number: 0086-14-065
DBE Goal: N/A
Project: CBI 1602(504)
Guaranty: N/A
Time: 724 WORKING DAYS
Engineer's Estimate: $26,744,984.65
Date: 07/11/2017 (8 years ago)
Contract Number: N/A
Type: FLEX BASE,SURF,BRIDGE AND PAV MRK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$26,744,984.65
$25,596,044.49
Over/Under Est: -4.3% -$1,148,940.16
Over/Under Est: -1.77% -$473,621.14
Amt Left: 2.64% $675,319.02
Over/Under Est: 4.18% $1,119,175.56
Amt Left: 8.86% $2,268,115.72
Delta: -6.06% -$1,592,796.70
Over/Under Est: 6.22% $1,664,359.32
Amt Left: 10.99% $2,813,299.48
Delta: -1.96% -$545,183.76
$29,265,907.65
Over/Under Est: 9.43% $2,520,923.00
Amt Left: 14.34% $3,669,863.16
Delta: -3.02% -$856,563.68

Bid Items & Bid Tabulations

166 Total 0 of 166
WEBB  |  SL 20  |  LAREDO  |  0086-14-065  |  07/11/2017  |  $26,744,984.65  |  CBI 1602(504)  |  FLEX BASE,SURF,BRIDGE AND PAV MRK  |  724 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
SER CONSTRUCTION PARTNERS, LLC
ANDERSON COLUMBIA CO., INC.
AUSTIN BRIDGE & ROAD SERVICES, LP
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
WEBBER, LLC
PREPARING ROW
STA 69.000 $1,200.000 $2,600.000 $1,000.000 $10,000.000 $13,798.000 $29,500.000
REMOVING CONC (RIPRAP)
SY 40.000 $15.000 $8.800 $15.000 $25.000 $35.000 $20.000
REMOVING CONC (CURB)
LF 391.000 $15.000 $1.100 $5.500 $25.000 $10.000 $10.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 579.000 $18.000 $10.900 $13.000 $25.000 $25.000 $20.000
EXCAVATION (ROADWAY)
CY 52,430.000 $7.000 $6.700 $10.000 $10.000 $14.000 $10.000
EMBANKMENT (FINAL)(DENS CONT)(TY A)
CY 26,744.000 $14.000 $2.900 $5.000 $5.000 $12.000 $4.000
FURNISHING AND PLACING TOPSOIL (4")
SY 90,725.000 $0.350 $0.500 $0.600 $1.800 $1.000 $2.000
DRILL SEEDING (PERM) (URBAN) (CLAY)
SY 90,725.000 $0.180 $0.200 $0.130 $0.160 $0.130 $0.200
VEGETATIVE WATERING
MG 1,418.000 $20.000 $33.600 $30.000 $38.000 $31.000 $15.000
PROOF ROLLING
HR 20.000 $144.000 $336.000 $53.000 $75.000 $108.120 $85.000
CEMENT
TON 195.000 $175.000 $157.500 $170.000 $155.000 $160.000 $160.000
CEMENT TREAT (EXIST MATL) (6")
SY 26,322.000 $3.500 $5.100 $3.200 $2.250 $2.500 $2.000
D-GR HMA TY B SAC-B PG (64-22)
TON 6,317.000 $100.000 $92.400 $81.000 $88.000 $65.000 $89.000
TBWC (ASPHALT)(PG 76-22)
TON 104.300 $138.000 $113.400 $140.000 $108.000 $115.000 $109.000
TBWC (MEMBRANE)
GAL 6,895.000 $3.000 $2.600 $3.000 $2.500 $2.750 $2.550
TBWC (AGGREGATE)(TY C)
TON 1,792.000 $138.000 $113.400 $140.000 $108.000 $115.000 $109.000
PLANE ASPH CONC PAV (3/4")
SY 34,477.000 $0.750 $2.400 $1.300 $2.250 $2.500 $2.250
CONC PVMT (CONT REINF - CRCP) (13")
SY 40,572.000 $65.000 $77.000 $78.000 $70.000 $67.000 $68.000
FULL - DEPTH REPAIR CRCP (12")
SY 250.000 $400.000 $114.800 $185.000 $225.000 $400.000 $500.000
STRUCT EXCAV (BOX)
CY 6.000 $140.000 $44.100 $130.000 $50.000 $120.000 $200.000
CEM STABIL BKFL
CY 410.600 $135.000 $52.600 $100.000 $175.000 $60.000 $146.000
FLOWABLE BACKFILL
CY 3,098.000 $130.000 $121.800 $140.000 $150.000 $120.000 $155.000
DRILL SHAFT (24 IN)
LF 14.000 $150.000 $105.000 $185.000 $180.000 $240.000 $180.000
DRILL SHAFT (36 IN)
LF 821.000 $180.000 $147.900 $125.000 $150.000 $265.000 $200.000
DRILL SHAFT (42 IN)
LF 176.000 $200.000 $181.200 $490.000 $475.000 $289.000 $475.000
DRILL SHAFT (48 IN)
LF 1,434.000 $400.000 $246.100 $265.000 $350.000 $385.000 $300.000
DRILL SHAFT (60 IN)
LF 1,958.000 $400.000 $384.300 $310.000 $450.000 $615.000 $400.000
DRILL SHAFT (72 IN)
LF 40.000 $500.000 $589.100 $450.000 $600.000 $1,100.000 $1,100.000
DRILL SHAFT (84 IN)
LF 27.000 $850.000 $773.500 $660.000 $800.000 $1,500.000 $1,500.000
CL C CONC (ABUT)
CY 125.100 $1,500.000 $736.800 $980.000 $1,000.000 $800.000 $875.000
CL C CONC (BENT)
CY 4,400.500 $1,000.000 $775.500 $700.000 $1,000.000 $850.000 $821.000
CL C CONC (MISC)
CY 128.000 $1,500.000 $1,290.100 $510.000 $600.000 $600.000 $500.000
REINF CONC SLAB
SF 247,622.700 $15.000 $16.300 $17.000 $14.000 $16.000 $16.000
APPROACH SLAB
CY 169.500 $500.000 $423.300 $450.000 $575.000 $439.000 $484.000
RETAINING WALL (MSE)
SF 21,956.000 $48.000 $49.000 $50.000 $50.000 $58.000 $50.000
PRESTR CONC GIRDER (TX54)
LF 30,751.090 $140.000 $130.700 $150.000 $115.000 $135.000 $130.000
RIPRAP (CONC)(4 IN)
CY 79.000 $400.000 $503.700 $410.000 $500.000 $500.000 $400.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 124.000 $500.000 $440.600 $440.000 $550.000 $420.000 $400.000
RIPRAP (MOW STRIP)(4 IN)
CY 56.000 $499.000 $414.600 $440.000 $550.000 $500.000 $500.000
RAIL (TY SSTR)
LF 14,378.400 $60.000 $48.100 $50.000 $55.000 $62.000 $60.500
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 862.200 $94.000 $54.600 $60.000 $90.000 $80.000 $72.500
CONC BOX CULV (8 FT X 4 FT)
LF 548.000 $425.000 $313.200 $480.000 $500.000 $400.000 $315.000
RC PIPE (CL III)(18 IN)
LF 85.000 $82.000 $48.300 $55.000 $65.000 $80.000 $70.000
RC PIPE (CL III)(24 IN)
LF 2,631.000 $85.000 $59.400 $68.000 $75.000 $60.000 $65.000
RC PIPE (CL III)(30 IN)
LF 914.000 $100.000 $76.700 $80.000 $90.000 $100.000 $85.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 2.000 $4,000.000 $1,694.800 $3,850.000 $4,500.000 $5,500.000 $3,100.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-4FTX4FT)
EA 8.000 $4,500.000 $4,181.500 $7,400.000 $7,500.000 $8,500.000 $7,700.000
INLET (COMPL)(RWI)(TY I)
EA 2.000 $9,000.000 $2,007.500 $4,540.000 $4,800.000 $5,500.000 $5,500.000
MANH (COMPL)(TY M)
EA 14.000 $3,800.000 $4,330.800 $5,800.000 $6,000.000 $8,500.000 $5,250.000
GRATE AND FRAME (BRIDGE DRAIN)
EA 26.000 $4,000.000 $4,695.200 $5,500.000 $1,000.000 $2,100.000 $5,460.000
REMOV STR (WINGWALL)
EA 3.000 $2,000.000 $1,446.400 $1,690.000 $1,800.000 $1,000.000 $3,000.000
REMOV STR (HEADWALL)
EA 3.000 $2,000.000 $1,682.600 $1,530.000 $1,600.000 $1,000.000 $4,500.000
MOBILIZATION
LS 1.000 $2,000,000.000 $2,490,000.000 $2,050,000.000 $2,800,000.000 $2,700,000.000 $2,900,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000 $7,500.000 $4,515.000 $7,500.000 $25,000.000 $9,539.570 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 4)
LF 120.000 $42.000 $54.600 $41.000 $42.250 $65.000 $43.500
ROCK FILTER DAMS (REMOVE)
LF 120.000 $15.000 $16.800 $12.200 $12.000 $20.000 $8.500
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 444.000 $38.000 $21.200 $21.000 $22.000 $35.000 $21.400
CONSTRUCTION EXITS (REMOVE)
SY 444.000 $15.000 $4.400 $12.000 $12.000 $15.000 $5.550
TEMP SEDMT CONT FENCE (INSTALL)
LF 12,726.000 $4.500 $2.300 $2.150 $2.150 $3.000 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 12,726.000 $1.200 $0.800 $0.660 $0.750 $1.000 $0.750
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 1,925.000 $7.000 $3.600 $3.400 $3.450 $7.000 $11.900
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,925.000 $2.000 $0.900 $1.000 $1.000 $1.000 $2.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 2,369.000 $4.000 $8.300 $7.000 $8.000 $7.000 $9.350
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 11,811.000 $6.000 $8.300 $7.000 $8.000 $7.000 $9.350
REMOVE AND RELAY PAVERS
SY 298.000 $80.000 $70.000 $100.000 $75.000 $52.000 $140.000
MTL W-BEAM GD FEN (TIM POST)
LF 1,627.000 $40.000 $23.800 $24.000 $22.680 $25.000 $19.200
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 10.000 $2,500.000 $1,471.100 $1,450.000 $1,401.000 $2,000.000 $1,450.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $950.000 $1,050.000 $1,050.000 $1,000.000 $1,500.000 $952.000
REMOVE METAL BEAM GUARD FENCE
LF 81.000 $4.500 $4.400 $5.100 $4.000 $7.000 $4.000
REMOVE TERMINAL ANCHOR SECTION
EA 1.000 $250.000 $525.000 $510.000 $300.000 $350.000 $350.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $250.000 $630.000 $510.000 $750.000 $350.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 6.000 $3,500.000 $2,536.800 $2,500.000 $2,416.000 $2,400.000 $2,120.000
CRASH CUSH ATTEN (INSTL)
EA 5.000 $16,000.000 $17,508.800 $20,000.000 $16,675.000 $16,675.000 $16,080.000
IN RD IL (U/P) (TY 2) (150W EQ) LED
EA 4.000 $1,500.000 $1,469.900 $2,200.000 $2,150.000 $1,500.000 $2,150.000
CONDT (PVC) (SCH 40) (2")
LF 8,404.000 $8.000 $11.800 $8.000 $8.000 $14.000 $8.000
CONDT (PVC) (SCH 40) (4")
LF 516.000 $18.000 $19.300 $29.000 $29.000 $21.000 $29.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 1,270.000 $20.000 $25.200 $28.000 $28.000 $27.000 $28.000
CONDT (RM) (1 1/4")
LF 946.000 $15.000 $21.000 $32.000 $32.000 $22.000 $32.000
ELEC CONDR (NO.10) BARE
LF 1,014.000 $1.500 $1.900 $1.900 $1.900 $2.000 $1.900
ELEC CONDR (NO.10) INSULATED
LF 2,028.000 $1.000 $1.900 $2.000 $2.000 $2.000 $2.000
ELEC CONDR (NO.8) BARE
LF 1,722.000 $1.250 $1.200 $1.900 $1.900 $1.250 $1.900
ELEC CONDR (NO.8) INSULATED
LF 21,070.000 $1.500 $1.500 $1.700 $1.700 $1.500 $1.700
ELEC CONDR (NO.6) BARE
LF 8,677.000 $1.500 $1.500 $1.600 $1.600 $1.500 $1.600
ELEC CONDR (NO.6) INSULATED
LF 10,042.000 $2.000 $1.700 $1.800 $1.800 $1.650 $1.800
GROUND BOX TY A (122311)
EA 1.000 $1,200.000 $981.800 $920.000 $920.000 $785.000 $920.000
GROUND BOX TY A (122311)W/APRON
EA 8.000 $1,000.000 $1,126.700 $1,100.000 $1,100.000 $1,000.000 $1,100.000
GROUND BOX TY C (162911)W/APRON
EA 34.000 $1,100.000 $1,086.800 $1,250.000 $1,250.000 $1,200.000 $1,250.000
REMOVE ELECTRICAL SERVICES
EA 2.000 $570.000 $606.800 $450.000 $450.000 $450.000 $450.000
ELC SRV TY A 240/480 060(NS)SS(E)SP(U)
EA 1.000 $5,000.000 $6,405.000 $6,100.000 $6,100.000 $7,000.000 $6,100.000
ELC SRV TY D 120/240 060(NS)GS(N)SP(O)
EA 14.000 $2,950.000 $3,566.900 $5,200.000 $5,200.000 $4,000.000 $5,200.000
ALUMINUM SIGNS (TY A)
SF 388.000 $25.000 $27.700 $25.000 $25.000 $22.000 $25.000
ALUMINUM SIGNS (TY G)
SF 63.000 $24.000 $28.400 $27.000 $27.000 $30.000 $27.000
ALUMINUM SIGNS (TY O)
SF 761.000 $22.000 $22.900 $32.000 $32.000 $27.000 $32.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $600.000 $487.600 $500.000 $480.000 $560.000 $378.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $600.000 $684.700 $750.000 $570.000 $575.000 $412.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 7.000 $650.000 $757.800 $750.000 $650.000 $765.000 $480.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $2,100.000 $1,961.400 $2,000.000 $1,900.000 $2,000.000 $2,200.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $2,100.000 $2,152.500 $2,200.000 $1,500.000 $2,000.000 $2,500.000
RELOCATE SM RD SN SUP&AM TY S80
EA 9.000 $360.000 $459.000 $300.000 $300.000 $300.000 $398.000
REMOVE SM RD SN SUP&AM
EA 2.000 $100.000 $89.000 $100.000 $97.000 $80.000 $75.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 9.000 $75.000 $210.000 $50.000 $66.000 $70.000 $121.000
INSTALL LRSS (STRUCT STEEL)
LB 408.000 $4.000 $6.000 $5.000 $5.000 $7.000 $5.000
INS OH SN SUP(30 FT BAL TEE)
EA 3.000 $30,500.000 $31,868.200 $35,000.000 $35,000.000 $22,000.000 $35,000.000
INS OH SN SUP(45 FT BRDG)(SPAN ONLY)
EA 1.000 $20,000.000 $24,079.700 $125,000.000 $120,000.000 $25,000.000 $120,000.000
INS OH SN SUP(60 FT BRDG)(SPAN ONLY)
EA 1.000 $23,000.000 $38,850.000 $140,000.000 $135,000.000 $38,000.000 $135,000.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 6,403.000 $1.250 $0.700 $0.700 $0.700 $1.000 $0.700
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,800.000 $3.500 $1.600 $1.500 $1.500 $1.000 $1.500
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 4.000 $125.000 $236.300 $225.000 $225.000 $200.000 $225.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 4.000 $155.000 $315.000 $300.000 $300.000 $200.000 $300.000
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
LF 1,766.000 $2.500 $1.600 $1.500 $1.500 $0.500 $1.500
PAVEMENT SEALER 4"
LF 43,701.000 $0.200 $0.100 $0.140 $0.140 $0.180 $0.150
PAVEMENT SEALER 8"
LF 3,401.000 $0.750 $0.200 $0.220 $0.220 $0.290 $0.200
PAVEMENT SEALER 12"
LF 750.000 $1.500 $0.800 $0.800 $0.800 $1.040 $0.800
PAVEMENT SEALER (ARROW)
EA 1.000 $50.000 $26.300 $25.000 $25.000 $20.000 $25.000
PAVEMENT SEALER (WORD)
EA 1.000 $50.000 $26.300 $25.000 $25.000 $32.000 $25.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 6,800.000 $0.800 $0.400 $0.350 $0.350 $1.000 $0.350
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 26,962.000 $0.450 $0.400 $0.350 $0.350 $1.000 $0.350
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 30,442.000 $0.450 $0.400 $0.350 $0.350 $1.000 $0.350
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 816.000 $4.000 $2.000 $1.900 $1.900 $3.000 $1.900
REFL PAV MRKR TY II-C-R
EA 865.000 $5.000 $3.200 $3.000 $3.000 $4.000 $3.000
ELIM EXT PAV MRK & MRKS (4")
LF 7,172.000 $1.250 $0.400 $0.350 $0.350 $1.000 $0.350
PAV SURF PREP FOR MRK (4")
LF 31,537.000 $0.450 $0.100 $0.100 $0.100 $0.100 $0.100
PAV SURF PREP FOR MRK (8")
LF 4,691.000 $2.000 $0.200 $0.200 $0.200 $0.200 $0.200
PAV SURF PREP FOR MRK (12")
LF 2,618.000 $3.000 $1.100 $1.000 $1.000 $0.500 $1.000
PAV SURF PREP FOR MRK (ARROW)
EA 4.000 $25.000 $21.000 $20.000 $20.000 $15.000 $20.000
PAV SURF PREP FOR MRK (WORD)
EA 4.000 $25.000 $31.500 $30.000 $30.000 $20.000 $30.000
INSTALL HWY TRF SIG (ISOLATED)
EA 1.000 $25,000.000 $41,499.200 $25,000.000 $25,000.000 $30,000.000 $25,000.000
VEH SIG SEC (12")LED(GRN)
EA 16.000 $65.000 $280.900 $100.000 $100.000 $260.000 $100.000
VEH SIG SEC (12")LED(YEL)
EA 16.000 $70.000 $276.300 $100.000 $100.000 $260.000 $100.000
VEH SIG SEC (12")LED(RED)
EA 16.000 $65.000 $270.800 $100.000 $100.000 $260.000 $100.000
VEH SIG SEC (12")LED(HOUSING ONLY)
EA 48.000 $130.000 $154.400 $245.000 $245.000 $180.000 $245.000
BACK PLATE (12")(3 SEC)
EA 16.000 $65.000 $95.400 $100.000 $100.000 $100.000 $100.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 3,642.000 $1.450 $1.400 $2.000 $2.000 $2.000 $2.000
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 3,642.000 $1.800 $1.600 $2.500 $2.500 $2.000 $2.500
TRF SIG CBL (TY A)(12 AWG)(5 CONDR)
LF 680.000 $1.500 $3.900 $2.700 $2.700 $2.500 $2.700
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 3,348.000 $3.500 $3.000 $3.000 $3.000 $2.500 $3.000
REMOVAL OF GROUND BOXES
EA 6.000 $235.000 $391.800 $750.000 $750.000 $450.000 $750.000
REMOVAL OF CABLES
LF 17,240.000 $0.800 $0.900 $2.000 $2.000 $0.550 $2.000
REMOVAL OF SIGNAL HEAD ASSM
EA 28.000 $210.000 $146.000 $275.000 $275.000 $160.000 $275.000
REROUTE CABLES
LF 6,374.000 $3.000 $1.300 $2.500 $2.500 $1.250 $2.500
ANTI - GRAFFITI COATNG(PERMNENT-TY III)
SF 21,956.000 $1.200 $0.700 $0.640 $0.890 $1.000 $0.900
GEOGRID BASE REINFORCEMENT (TY I)
SY 17,744.000 $2.000 $1.400 $1.200 $2.250 $3.000 $1.900
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $16,000.000 $11,827.700 $30,000.000 $10,000.000 $11,000.000 $17,580.000
ITS COM CBL (ETHERNET)
LF 710.000 $3.800 $4.900 $5.000 $5.000 $5.000 $5.000
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 10,548.000 $3.100 $2.000 $6.000 $6.000 $2.000 $6.000
FIBER OPTIC SPLICE ENCLOSURE
EA 6.000 $4,300.000 $2,882.300 $2,100.000 $2,100.000 $2,700.000 $2,100.000
FIBER OPTIC PATCH PANEL (6 POSITION)
EA 16.000 $2,300.000 $640.500 $1,800.000 $1,800.000 $700.000 $1,800.000
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 1.000 $2,900.000 $1,902.600 $2,150.000 $2,150.000 $1,850.000 $2,150.000
FIBER OPTIC PATCH PANEL (72 POSITION)
EA 1.000 $3,500.000 $6,118.000 $3,000.000 $3,000.000 $6,000.000 $3,000.000
ITS GRND MNT CAB (TY 4) (CONF 1)
EA 3.000 $13,200.000 $1,890.000 $31,500.000 $31,500.000 $1,200.000 $31,500.000
CCTV FIELD EQUIPMENT (ANALOG)
EA 5.000 $9,300.000 $11,481.800 $13,500.000 $13,500.000 $11,000.000 $13,500.000
REMOVE CCTV FIELD EQUIPMENT
EA 1.000 $1,500.000 $1,272.600 $1,500.000 $1,500.000 $650.000 $1,500.000
CONDUIT (PREPARE)
LF 17,497.000 $2.000 $2.200 $2.500 $2.500 $2.000 $2.500
INSTALL DMS (FOUNDATION MTD CABINET)
EA 3.000 $17,500.000 $21,047.300 $3,400.000 $3,400.000 $20,000.000 $3,400.000
RADAR VEHICLE SENSING DEVICE
EA 10.000 $9,850.000 $11,370.500 $7,100.000 $7,100.000 $10,000.000 $7,100.000
ITS RADIO (INSTALL ONLY)
EA 2.000 $1,400.000 $3,678.200 $2,200.000 $2,200.000 $2,500.000 $2,200.000
ITS POLE (40 FT)(REM)
EA 1.000 $1,500.000 $5,574.200 $1,900.000 $1,900.000 $5,400.000 $1,900.000
ITS POLE (50 FT)(90 MPH)
EA 12.000 $13,150.000 $9,569.700 $6,600.000 $6,600.000 $7,500.000 $6,600.000
ITS POLE (50 FT)(110 MPH)
EA 3.000 $15,000.000 $11,865.000 $7,250.000 $7,250.000 $11,500.000 $7,250.000
ITS POLE MNT CAB (TY 1)(CONF 2)
EA 12.000 $6,500.000 $6,257.000 $7,600.000 $7,600.000 $5,600.000 $7,600.000
REMOVE DYNAMIC MESSAGE SIGN SYSTEM
EA 2.000 $11,200.000 $8,114.400 $5,500.000 $5,500.000 $7,800.000 $5,500.000
ITS GND BOX(PCAST) TY 1 (243648)W/APRN
EA 15.000 $2,300.000 $10,080.000 $7,750.000 $7,750.000 $7,000.000 $7,750.000
INSTALATION OF ETHERNET SURGE PROTECTOR
EA 4.000 $350.000 $1,575.000 $1,250.000 $1,250.000 $1,200.000 $1,250.000
INSTALLATION OF DIGITAL VIDEO ENCODER
EA 5.000 $900.000 $275.100 $1,250.000 $1,250.000 $270.000 $1,250.000
INSTALLATION OF TRANSCEIVER
EA 28.000 $650.000 $275.100 $2,150.000 $2,150.000 $270.000 $2,150.000
INSTALATION OF HARDENED ETHERNET SWITCH
EA 1.000 $650.000 $2,415.000 $1,250.000 $1,250.000 $2,000.000 $1,250.000
Totals: $26,744,984.650 $25,596,044.493 $26,271,363.510 $27,864,160.210 $28,409,343.970 $29,265,907.650