Show Job Controls
Bid Cobra

WEBB SH 359 (0086-02-030)

Items: 84

County: WEBB
Length: N/A
Highway: SH 359
District: LAREDO
Control Number: 0086-02-030
DBE Goal: N/A
Project: F 2021(630)
Guaranty: N/A
Time: 280 WORKING DAYS
Engineer's Estimate: $6,107,897.22
Date: 06/03/2021 (5 years ago)
Contract Number: N/A
Type: WIDEN ROAD - ADD LANES AND SHOULDERS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (4)
E
Engineer's Estimate
$6,107,897.22
$5,168,084.93
Over/Under Est: -15.39% -$939,812.29
Over/Under Est: -5.71% -$348,887.57
Amt Left: 11.43% $590,924.72
$5,819,927.13
Over/Under Est: -4.71% -$287,970.09
Amt Left: 12.61% $651,842.20
Delta: -1.06% -$60,917.48
$6,045,610.25
Over/Under Est: -1.02% -$62,286.97
Amt Left: 16.98% $877,525.32
Delta: -3.88% -$225,683.12

Bid Items & Bid Tabulations

84 Total 0 of 84
WEBB  |  SH 359  |  LAREDO  |  0086-02-030  |  06/03/2021  |  $6,107,897.22  |  F 2021(630)  |  WIDEN ROAD - ADD LANES AND SHOULDERS  |  280 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ANDERSON COLUMBIA CO., INC.
ANGEL BROTHERS HOLDINGS CORP.
FARIS INDUSTRIES, INC.
CK NEWBERRY, LLC
PREPARING ROW
STA 295.680 $4,000.000 $300.000 $700.000 $376.210 $300.000
EXCAVATION (ROADWAY)
CY 26,736.000 $8.000 $10.000 $14.000 $15.330 $8.000
EMBANKMENT (FINAL)(ORD COMP)(TY A)
CY 9,088.000 $20.000 $8.000 $12.250 $13.600 $11.000
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 3,812.000 $10.000 $8.000 $12.100 $10.070 $9.500
DRILL SEEDING (PERM) (RURAL) (CLAY)
AC 12.500 $600.000 $1,100.000 $1,145.000 $1,064.800 $1,200.000
DRILL SEEDING (TEMP) (WARM)
AC 12.500 $750.000 $500.000 $520.500 $484.000 $800.000
PROOF ROLLING
HR 22.000 $110.000 $90.000 $148.000 $87.600 $40.000
FL BS (RDWY DEL)(TY E GR 4)(FNAL POS)
CY 12,079.000 $20.000 $42.000 $50.000 $41.350 $90.000
LIME (HYDRATED LIME (SLURRY))
TON 794.000 $180.000 $200.000 $257.000 $250.000 $230.000
LIME TRT (SUBGRADE)(6")
SY 54,523.000 $3.000 $3.400 $2.500 $4.240 $1.650
CEMENT
TON 764.000 $160.000 $190.000 $189.000 $170.000 $200.000
CEMENT TREAT (NEW BASE)(10")(DC)
SY 50,202.000 $2.000 $4.000 $2.000 $2.740 $1.750
PRIME COAT (MC-30)
GAL 10,287.000 $4.500 $3.800 $4.000 $4.550 $4.000
PLANE ASPH CONC PAV (2")
SY 26,757.000 $2.000 $2.000 $3.000 $1.990 $2.000
FLOWABLE BACKFILL
CY 55.600 $200.000 $165.000 $177.500 $158.600 $170.000
RIPRAP (CONC)(5 IN)
CY 20.200 $430.000 $478.000 $484.000 $430.380 $500.000
RIPRAP (MOW STRIP)(4 IN)
CY 86.000 $600.000 $438.000 $516.000 $379.040 $520.000
RAIL (TY T631)
LF 195.000 $85.000 $74.000 $68.000 $51.680 $80.000
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
LF 19.600 $725.000 $440.000 $473.000 $445.910 $500.000
CONC BOX CULV (3 FT X 3 FT)(EXTEND)
LF 21.000 $540.000 $467.000 $502.000 $457.060 $600.000
CONC BOX CULV (4 FT X 4 FT)(EXTEND)
LF 6.300 $640.000 $465.000 $500.000 $544.660 $600.000
CONC BOX CULV (5 FT X 5 FT)(EXTEND)
LF 35.000 $850.000 $835.000 $898.000 $866.570 $1,000.000
CONC BOX CULV (10 FT X 8 FT)(EXTEND)
LF 13.200 $950.000 $1,900.000 $1,995.000 $995.830 $2,000.000
CONC BOX CULV (8 FT X 3 FT)(EXTEND)
LF 7.100 $700.000 $1,100.000 $1,116.000 $602.820 $1,200.000
WINGWALL (PW - 1) (HW=5 FT)
EA 3.000 $12,000.000 $8,500.000 $9,139.000 $16,460.120 $10,000.000
WINGWALL (PW - 1) (HW=9 FT)
EA 2.000 $33,000.000 $27,000.000 $29,030.000 $23,747.870 $30,000.000
SET (TY I)(S=3 FT)(HW=3FT)(4:1)(C)
EA 3.000 $7,750.000 $4,500.000 $4,838.000 $9,415.510 $5,000.000
SET (TY I)(S=3 FT)(HW= 4 FT)(4:1)(C)
EA 3.000 $7,340.000 $5,400.000 $5,806.000 $9,142.070 $6,000.000
SET (TY I)(S= 5 FT)(HW= 6 FT)(4:1) (C)
EA 8.000 $10,000.000 $9,100.000 $9,784.000 $8,204.170 $10,000.000
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C)
EA 2.000 $12,000.000 $10,000.000 $10,752.000 $8,717.050 $11,000.000
REMOV STR (SET)
EA 5.000 $500.000 $2,400.000 $1,613.000 $132.670 $1,600.000
REMOV STR (WINGWALL)
EA 10.000 $1,400.000 $3,200.000 $1,613.000 $1,061.310 $1,600.000
MOBILIZATION
LS 1.000 $555,263.380 $358,000.000 $575,500.000 $640,191.990 $500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $2,300.000 $3,000.000 $2,439.000 $11,007.890 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 253.000 $60.000 $70.000 $74.000 $69.000 $45.000
ROCK FILTER DAMS (REMOVE)
LF 253.000 $12.000 $18.000 $19.000 $18.000 $11.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 468.000 $20.000 $18.000 $19.000 $18.000 $25.000
CONSTRUCTION EXITS (REMOVE)
SY 468.000 $8.000 $2.000 $2.000 $2.000 $6.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 66.600 $70.000 $80.000 $63.000 $75.000 $70.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,662.000 $3.000 $3.300 $3.500 $3.250 $3.250
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,662.000 $1.000 $1.200 $1.250 $1.150 $1.250
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 1,080.000 $95.000 $79.000 $53.000 $78.840 $65.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 380.000 $120.000 $94.000 $95.000 $109.500 $85.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 13.000 $6,400.000 $4,000.000 $3,156.000 $5,949.420 $6,000.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 60.000 $70.000 $80.000 $95.000 $70.000 $125.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 240.000 $7.000 $96.000 $36.500 $14.000 $60.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 60.000 $9.000 $60.000 $45.000 $22.000 $125.000
DRIVEWAYS (ACP)
SY 1,557.000 $40.000 $53.000 $77.000 $46.280 $50.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 62,512.000 $0.300 $0.240 $0.150 $0.110 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 1,225.000 $22.000 $24.000 $27.000 $25.490 $26.000
REMOVE METAL BEAM GUARD FENCE
LF 550.000 $2.040 $2.000 $2.000 $1.490 $2.500
GUARDRAIL END TREATMENT (INSTALL)
EA 10.000 $2,818.000 $2,600.000 $3,063.000 $2,849.210 $2,800.000
GUARDRAIL END TREATMENT (REMOVE)
EA 8.000 $217.000 $180.000 $2.000 $1.950 $200.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 8.000 $790.000 $600.000 $1,107.000 $1,549.210 $650.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $811.000 $525.000 $738.000 $749.210 $600.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $20,835.000 $9,400.000 $11,928.000 $10,860.210 $10,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $550.000 $530.000 $698.000 $649.210 $800.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 11.000 $600.000 $660.000 $805.000 $749.210 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 4.000 $800.000 $1,220.000 $1,020.000 $949.210 $1,400.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 14.000 $70.000 $98.000 $97.000 $90.490 $150.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 720.000 $4.000 $3.000 $3.250 $3.000 $4.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 60,336.000 $0.600 $0.550 $0.650 $0.600 $0.750
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 144.000 $8.000 $9.000 $10.750 $10.000 $11.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 28,800.000 $0.540 $0.600 $0.650 $0.600 $0.650
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 1,004.000 $0.910 $2.000 $0.500 $0.440 $0.550
REFL PAV MRK TY I(W)(LNDP ARW)(100MIL)
EA 6.000 $470.000 $326.000 $484.000 $450.000 $500.000
PAVEMENT SEALER 4"
LF 116,334.000 $0.250 $0.200 $0.250 $0.250 $0.300
PAVEMENT SEALER (LNDP ARROW)
EA 6.000 $100.000 $40.000 $70.000 $65.000 $75.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 6,182.000 $0.480 $0.400 $0.500 $0.500 $0.550
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 63,620.000 $0.340 $0.330 $0.500 $0.480 $0.550
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 4,223.000 $0.300 $0.450 $0.500 $0.500 $0.550
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 63,620.000 $0.350 $0.330 $0.500 $0.480 $0.550
PREFAB PAV MRK TY C (W) (ARROW)
EA 4.000 $150.000 $224.000 $484.000 $450.000 $500.000
REFL PAV MRKR TY I-R
EA 126.000 $8.000 $5.000 $4.000 $4.000 $4.250
REFL PAV MRKR TY II-A-A
EA 831.000 $3.740 $3.200 $4.000 $3.750 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 16,623.000 $0.350 $0.500 $0.500 $0.450 $1.000
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 960.000 $8.500 $0.300 $1.750 $1.500 $3.000
SP MIXES SP-B SAC-B PG70-22
TON 11,489.000 $85.000 $82.000 $83.000 $84.010 $93.000
SP MIXES SP-C SAC-A PG76-22
TON 8,925.000 $95.000 $104.000 $112.000 $107.370 $112.000
BONDING COURSE
GAL 7,493.000 $3.550 $3.500 $3.000 $3.600 $3.750
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,358.000 $16,300.000 $8,025.000 $20,000.000 $20,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 960.000 $14.980 $12.000 $11.000 $10.000 $15.000
TMA (STATIONARY)
DAY 270.000 $163.000 $207.000 $129.000 $70.000 $270.000
TMA (MOBILE OPERATION)
HR 200.000 $72.000 $56.000 $33.000 $40.000 $20.000
Totals: $6,107,897.220 $5,168,084.930 $5,759,009.650 $5,819,927.121 $6,045,610.250