WEBB IH 35 (0018-06-185)

Items: 174

County: WEBB
Length: 0.3970 MILES
Highway: IH 35
District: LAREDO
Control Number: 0018-06-185
DBE Goal: 0.0%
Project: C 18-6-185
Guaranty: $100,000.00
Time: 448 WORKING DAYS
Engineer's Estimate: $66,832,713.24
Date: 06/02/2026 (8 days ago)
Contract Number: 6263002
Type: CONSTRUCT DIRECT CONNECTORS
Project ID: A00119468
Project Description: NEW DIRECT CONNECTORS (#3, #4 AND #6) NORTHBOUND AND SOUTHBOUND IH35 TO US59 EB
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JOSE VARGAS
ANGEL MARTINEZ
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$66,832,713.24
Over/Under Est: 4.51% $3,017,286.26
Over/Under Est: 9.31% $6,221,918.58
Amt Left: 4.59% $3,204,632.32
Over/Under Est: 15.56% $10,402,191.42
Amt Left: 10.57% $7,384,905.16
Delta: -5.72% -$4,180,272.84
$80,299,234.04
Over/Under Est: 20.15% $13,466,520.80
Amt Left: 14.96% $10,449,234.54
Delta: -3.97% -$3,064,329.38
Over/Under Est: 28.66% $19,151,860.78
Amt Left: 23.1% $16,134,574.52
Delta: -7.08% -$5,685,339.98
$104,119,421.07
Over/Under Est: 55.79% $37,286,707.83
Amt Left: 49.06% $34,269,421.57
Delta: -21.09% -$18,134,847.05

Bid Items & Bid Tabulations

174 Total 0 of 174
WEBB  |  IH 35  |  LAREDO  |  0018-06-185  |  06/02/2026  |  $66,832,713.24  |  C 18-6-185  |  CONSTRUCT DIRECT CONNECTORS  |  448 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
URBAN INFRACONSTRUCTION LLC
JAMES CONSTRUCTION GROUP, LLC
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
WEBBER, LLC
ZACHRY CONSTRUCTION CORPORATION
IOC COMPANY, LLC
PREPARING ROW
STA 47.000 $2,500.000 $25,000.000 $81,260.000 $164,000.000 $171,220.830 $181,000.000 $75,000.000
REMOV CONC (PAV)
SY 828.000 $35.000 $34.020 $14.600 $20.000 $15.000 $19.290 $50.000
REMOV CONC (MOWSTRIP)
LF 526.000 $25.000 $21.810 $4.980 $10.000 $65.000 $7.410 $20.000
REMOV CONC (RIPRAP)
SY 260.000 $30.000 $28.810 $9.490 $20.000 $25.000 $8.680 $20.000
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 615.000 $28.000 $24.820 $8.380 $20.000 $25.000 $12.920 $20.000
REMOV CONC (CURB)
LF 1,482.000 $20.000 $9.460 $3.120 $4.000 $10.000 $3.720 $10.000
REMOV CONC (COPING)
LF 45.000 $390.000 $28.320 $51.270 $100.000 $75.000 $69.610 $50.000
REMOV CONC (TRAFFIC BARRIER)
LF 650.000 $30.000 $32.460 $12.740 $30.000 $25.000 $16.360 $20.000
REMOV CONC (RAIL)
LF 244.000 $50.000 $31.950 $22.200 $25.000 $18.000 $17.300 $25.000
RMV (10"-12") TRT/UNTRT BASE & ASPH PAV
SY 891.000 $25.000 $10.840 $5.820 $20.000 $14.860 $18.270 $20.000
EXCAV (ROADWAY)
CY 610.000 $40.000 $7.000 $5.650 $40.000 $30.000 $54.580 $7.000
EMBANK (FNL)(DC)(TY C)
CY 15,208.000 $20.000 $12.000 $70.620 $20.000 $95.060 $90.280 $15.000
DRILL SEED (PERM_RURAL_CLAY)
AC 1.000 $550.000 $13,600.000 $4,950.000 $15,000.000 $3,860.000 $4,036.160 $3,860.000
VEGETATIVE WATERING
TGL 676.000 $27.000 $130.340 $40.000 $36.000 $80.000 $41.830 $50.000
SPRINKLING (DUST CONTROL)
TGL 47.000 $70.000 $100.000 $68.040 $36.000 $40.000 $21.490 $50.000
LIME (COM OR QK)(SLURRY) OR QK(DRY)
TON 2.000 $400.000 $397.760 $1,061.650 $450.000 $350.000 $418.260 $5,000.000
LIME TRT (EXIST MATL)(8")
SY 139.000 $20.000 $57.160 $34.470 $6.000 $5.000 $150.000 $85.000
PRIME COAT (MC-30)
GAL 1,972.000 $6.000 $5.000 $4.500 $5.000 $9.000 $4.710 $10.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 1,577.000 $144.000 $157.000 $133.000 $185.000 $158.000 $135.170 $150.000
CONC PVMT (CRCP) (12")
SY 6,541.000 $152.000 $120.000 $132.820 $100.000 $125.430 $154.830 $150.000
CUT & RESTORING PAV
SY 62.000 $270.000 $278.520 $239.370 $295.000 $75.000 $380.740 $1,000.000
CEM STABIL BKFL
CY 477.000 $230.000 $319.480 $85.150 $115.000 $287.180 $175.030 $125.000
TRENCH EXCAVATION PROTECTION
LF 2,610.000 $11.000 $2.000 $1.690 $14.000 $6.410 $19.330 $1.000
TEMPORARY SPL SHORING
SF 30,856.000 $40.000 $20.130 $18.470 $1.000 $16.200 $15.270 $31.500
DRILL SHAFT (36 IN)
LF 148.000 $402.520 $300.000 $226.580 $300.000 $417.480 $269.620 $500.000
DRILL SHAFT (42 IN)
LF 368.000 $550.000 $460.000 $451.350 $400.000 $486.950 $526.870 $550.000
DRILL SHAFT (54 IN)
LF 2,288.000 $631.670 $515.000 $487.680 $625.000 $665.340 $548.150 $600.000
DRILL SHAFT (60 IN)
LF 992.000 $774.960 $550.000 $544.090 $750.000 $854.740 $593.470 $675.000
DRILL SHAFT (78 IN)
LF 152.000 $986.960 $1,100.000 $1,007.410 $1,200.000 $1,444.220 $1,079.260 $1,500.000
DRILL SHAFT (84 IN)
LF 192.000 $1,000.000 $1,225.000 $1,086.720 $1,400.000 $1,418.540 $1,314.440 $1,600.000
DRILL SHAFT (90 IN)
LF 199.000 $1,500.000 $1,350.000 $1,406.060 $1,500.000 $1,629.010 $1,585.890 $1,875.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 30.000 $261.580 $330.000 $330.000 $200.000 $135.000 $345.060 $141.280
DRILL SHAFT (SIGN MTS) (48 IN)
LF 26.000 $832.200 $590.000 $590.000 $500.000 $800.000 $616.930 $639.230
DRILL SHAFT (114 IN)
LF 120.000 $2,200.000 $1,750.000 $1,652.660 $2,500.000 $2,956.400 $1,871.400 $2,500.000
CL C CONC (ABUT)
CY 18.200 $1,360.000 $2,500.000 $1,355.130 $2,400.000 $1,643.250 $1,440.090 $2,500.000
CL C CONC (CAP)
CY 149.100 $1,550.000 $1,300.000 $1,334.860 $1,300.000 $1,404.460 $1,380.410 $3,800.000
CL C CONC (CAP)(MASS)
CY 379.200 $1,409.000 $1,400.000 $1,083.190 $1,500.000 $1,552.330 $2,405.590 $3,550.000
CL C CONC (CAP)(EXTEND)
CY 1.000 $15,000.000 $12,000.000 $6,951.760 $15,000.000 $6,219.570 $12,000.000 $18,000.000
CL C CONC (CAP)(INVT)
CY 232.400 $1,116.000 $1,300.000 $1,167.410 $2,400.000 $1,368.010 $2,449.280 $3,200.000
CL C CONC (CAP)(INVT)(MASS)
CY 407.800 $1,115.600 $1,400.000 $1,040.580 $1,600.000 $1,131.500 $2,463.890 $3,000.000
CL C CONC (COLUMN)
CY 416.500 $1,480.000 $1,200.000 $1,404.600 $1,800.000 $1,068.680 $1,182.080 $3,500.000
CL C CONC (COLUMN)(MASS)
CY 3,321.200 $1,124.200 $1,000.000 $1,077.280 $800.000 $956.110 $1,231.600 $2,300.000
CL C CONC (FOOTING)(MASS)
CY 643.400 $925.000 $900.000 $670.630 $850.000 $618.920 $868.130 $2,000.000
CL C CONC (RAIL FOUNDATION)
CY 691.000 $900.000 $600.000 $538.650 $500.000 $763.570 $667.360 $1,000.000
CL F CONC (FOOTING)(MASS)
CY 1,299.000 $1,000.000 $1,000.000 $843.310 $1,000.000 $802.100 $924.530 $2,500.000
CL H CONC (CAP)(MASS)
CY 292.700 $1,150.000 $1,500.000 $1,498.340 $1,200.000 $3,494.240 $2,323.850 $4,200.000
CL H CONC (PT CAP)(MASS)
CY 160.400 $1,660.000 $1,400.000 $1,006.750 $1,300.000 $1,749.270 $1,932.980 $3,800.000
REINF CONC SLAB
SF 188,005.000 $23.000 $35.000 $37.010 $20.000 $31.850 $39.340 $30.000
RETAINING WALL (MSE)
SF 34,468.000 $76.000 $75.000 $42.400 $70.000 $57.040 $51.800 $110.000
RETAINING WALL (CAST-IN-PLACE)
SF 477.000 $107.200 $169.930 $84.170 $115.000 $125.520 $83.450 $200.000
PRESTR CONC GIRDER (TX54)
LF 7,088.890 $244.000 $213.820 $212.860 $145.000 $245.000 $226.350 $1,400.000
PT FOR CAP
EA 1.000 $96,000.000 $150,000.000 $112,000.000 $100,000.000 $153,144.890 $144,267.240 $155,000.000
CONCRETE PAINT FINISH
SF 78,282.000 $0.700 $0.430 $0.350 $0.430 $0.350 $0.450 $0.430
CONC STR REPAIR(DECK REP(PART DEPTH))
SF 160.000 $108.000 $55.000 $55.000 $60.000 $167.500 $57.500 $125.000
RIPRAP (CONC)(4 IN)
CY 112.200 $625.000 $620.230 $433.780 $865.000 $591.840 $896.740 $1,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 66.700 $740.000 $980.910 $694.750 $865.000 $597.460 $804.220 $1,000.000
ELASTOMERIC BEARING (EE5)
EA 16.000 $3,468.350 $6,300.800 $2,703.990 $2,000.000 $4,765.010 $3,631.160 $1,700.000
ELASTOMERIC BEARING (EE6)
EA 20.000 $3,060.000 $6,299.800 $2,812.190 $2,000.000 $4,825.930 $3,630.120 $1,700.000
ELASTOMERIC BEARING (E6)
EA 8.000 $3,500.000 $7,648.240 $4,143.430 $2,000.000 $6,044.370 $5,036.500 $3,000.000
ELASTOMERIC BEARING (E7)
EA 8.000 $4,062.500 $8,414.200 $5,360.070 $2,000.000 $6,068.870 $5,835.360 $3,800.000
ELASTOMERIC BEARING (E9)
EA 4.000 $5,250.000 $8,741.030 $5,670.390 $2,000.000 $7,136.390 $6,176.250 $4,100.000
ELASTOMERIC BEARING (F6)
EA 8.000 $3,500.000 $7,648.240 $4,143.430 $2,000.000 $8,392.690 $5,036.500 $3,000.000
ELASTOMERIC BEARING (F7)
EA 8.000 $3,500.000 $8,414.200 $5,240.110 $2,000.000 $6,725.460 $5,835.360 $3,800.000
ELASTOMERIC BEARING (F8)
EA 4.000 $4,920.000 $8,881.390 $5,262.720 $2,000.000 $6,294.880 $6,322.640 $4,250.000
ELASTOMERIC BEARING (F9)
EA 8.000 $4,920.000 $8,741.030 $5,549.050 $2,000.000 $7,106.590 $6,176.240 $4,100.000
ELASTOMERIC BEARING (F10)
EA 4.000 $5,589.560 $9,419.770 $5,940.050 $2,000.000 $7,517.600 $6,884.150 $4,800.000
SLIDING ELASTOMERIC BEARING (ES 5)
EA 16.000 $3,500.000 $7,255.240 $3,844.200 $2,000.000 $8,844.240 $4,689.350 $2,600.000
SLIDING ELASTOMERIC BEARING (ES 9)
EA 12.000 $5,000.000 $7,826.700 $4,459.900 $2,000.000 $6,734.220 $5,222.630 $3,200.000
CLEANING AND SEALING EXISTING JOINTS
LF 56.000 $77.000 $20.000 $100.000 $180.000 $4,000.000 $52.270 $260.000
CLEAN AND SEAL EXIST JTS (STRIP SEAL)
LF 80.000 $90.000 $100.000 $100.000 $180.000 $100.000 $104.570 $115.000
CONCRETE OVERLAY (2 IN)
SY 867.000 $120.000 $206.000 $207.980 $200.000 $206.000 $228.810 $206.500
CONCRETE OVERLAY (3 IN)
SY 415.000 $125.000 $230.000 $231.980 $200.000 $230.000 $253.900 $230.500
STR STEEL (PLATE GIRDER)
LB 11,152,200.000 $2.300 $2.500 $2.660 $2.700 $2.690 $2.800 $3.100
RAIL (TY SSTR)
LF 565.000 $84.000 $61.720 $63.910 $60.000 $97.340 $65.440 $95.000
RAIL (TY T80SS)
LF 17,344.200 $115.000 $87.090 $76.400 $120.000 $87.240 $69.970 $95.000
RAIL (HANDRAIL)(TY B)
LF 83.000 $121.070 $138.300 $140.800 $150.000 $138.300 $259.810 $144.540
RAIL (CLF-RO)(MOD)
LF 1,485.700 $81.300 $112.000 $215.000 $112.000 $112.000 $117.110 $117.050
RAIL(TY T80SS)(MOD)
LF 66.000 $305.000 $252.130 $156.220 $300.000 $210.780 $115.590 $250.000
RETROFIT RAIL (TY SSTR)
LF 73.100 $219.150 $227.860 $181.500 $400.000 $430.050 $183.650 $250.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 56.000 $218.740 $261.360 $180.700 $200.000 $226.140 $222.320 $400.000
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
LF 484.000 $275.130 $261.350 $184.060 $200.000 $237.310 $222.320 $275.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 4.000 $1,580.000 $2,834.260 $1,713.520 $4,275.000 $2,000.000 $2,019.930 $8,000.000
RC PIPE (CL III)(18 IN)
LF 68.000 $113.790 $315.890 $96.820 $135.000 $99.720 $178.130 $450.000
RC PIPE (CL III)(24 IN)
LF 1,142.000 $119.000 $189.070 $85.190 $152.000 $99.920 $175.850 $200.000
RC PIPE (CL III)(30 IN)
LF 623.000 $208.330 $163.740 $94.230 $180.000 $131.470 $146.390 $200.000
RC PIPE (CL III)(36 IN)
LF 684.000 $250.920 $210.810 $107.610 $225.000 $203.470 $180.550 $225.000
RC PIPE (CL III)(48 IN)
LF 234.000 $280.000 $298.490 $178.840 $315.000 $308.460 $276.680 $400.000
MANH (COMPL)(PRM)(48IN)
EA 10.000 $8,900.000 $7,693.430 $6,515.270 $7,275.000 $7,400.000 $8,207.200 $7,500.000
MANH (COMPL)(PRM)(72IN)
EA 1.000 $13,000.000 $9,140.520 $10,180.380 $10,500.000 $16,500.000 $15,037.910 $15,000.000
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 4.000 $7,000.000 $7,500.000 $5,277.950 $5,260.000 $4,200.000 $13,079.700 $6,500.000
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 1.000 $7,000.000 $7,399.410 $6,495.930 $5,795.000 $16,500.000 $7,421.840 $12,000.000
INLET (COMPL)(POD)(FG)(4FTX4FT)
EA 7.000 $9,800.000 $7,873.730 $5,466.370 $6,830.000 $6,200.000 $10,143.770 $9,000.000
INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT)
EA 4.000 $7,600.000 $7,603.760 $5,884.120 $6,925.000 $8,300.000 $3,938.640 $8,500.000
WINGWALL (PW - 1) (HW=9 FT)
EA 1.000 $37,800.000 $75,000.000 $46,292.850 $41,500.000 $41,549.710 $82,958.950 $75,000.000
GRATE AND FRAME (BRIDGE DRAIN)
EA 8.000 $3,000.000 $6,084.260 $5,002.330 $6,000.000 $3,500.000 $4,099.590 $6,500.000
JACK BOR OR TUN PIPE(36 IN)(RC)(CL III)
LF 67.000 $1,862.500 $2,122.000 $2,056.140 $2,485.000 $2,102.280 $2,852.450 $1,725.000
ADJUSTING INLETS (CAP)
EA 6.000 $3,019.480 $3,121.130 $2,924.080 $3,250.000 $4,200.000 $4,517.620 $5,000.000
PIPE (PVC) (SCH 40) (6 IN)
LF 560.000 $128.040 $148.830 $93.520 $55.000 $136.160 $72.580 $130.000
HYDRO-DEMOLITION (1 IN)
SY 1,282.000 $70.000 $242.000 $242.000 $250.000 $242.000 $253.050 $242.000
REMOV STR (INLET)
EA 3.000 $1,238.320 $3,206.750 $1,064.930 $550.000 $1,500.000 $2,438.370 $2,000.000
REMOV STR (WINGWALL)
EA 1.000 $2,935.370 $4,847.500 $1,691.910 $1,585.000 $2,000.000 $2,248.850 $7,500.000
REMOV STR (PIPE)
LF 813.000 $30.000 $42.470 $26.110 $31.000 $20.000 $50.030 $45.000
REMOV STR (BOX CULVERT)
LF 23.000 $220.000 $445.820 $68.460 $155.000 $200.000 $109.600 $400.000
REMOVE STR (RAIL)
LF 452.000 $31.000 $13.320 $16.820 $15.000 $50.000 $18.160 $30.000
REMOV STR (RET WALL)
LF 764.000 $60.000 $40.740 $15.300 $200.000 $75.000 $13.900 $40.000
MOBILIZATION
LS 1.000 $5,435,351.080 $6,838,541.000 $7,000,000.000 $8,428,825.000 $7,728,966.090 $8,500,000.000 $10,400,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 23.000 $3,500.000 $22,000.000 $48,000.000 $25,000.000 $11,003.520 $40,000.000 $5,000.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 10.000 $6,000.000 $15,000.000 $13,206.200 $1,000.000 $5,940.250 $25,000.000 $20,000.000
TMA (STATIONARY)
DAY 487.000 $300.000 $300.000 $191.430 $353.000 $163.270 $325.000 $1.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,558.100 $40.000 $33.700 $36.000 $30.000 $33.700 $35.240 $30.000
CONSTRUCTION EXITS (REMOVE)
SY 1,558.100 $21.000 $7.780 $22.000 $10.000 $7.780 $8.130 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,020.000 $5.100 $12.350 $3.950 $4.000 $12.350 $12.910 $6.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,020.000 $1.900 $1.650 $2.250 $1.500 $1.650 $1.720 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 540.000 $7.000 $10.000 $5.900 $7.000 $10.000 $10.460 $5.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 540.000 $4.000 $1.000 $2.250 $1.500 $1.000 $1.040 $1.000
CONSTRUCTING DETOURS
SY 769.000 $121.900 $129.170 $132.960 $215.000 $142.460 $130.430 $150.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 12,750.000 $35.000 $50.290 $6.930 $60.000 $18.570 $30.000 $60.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 1,290.000 $7.600 $15.340 $7.110 $7.000 $16.230 $35.980 $10.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 14,010.000 $14.000 $12.540 $6.850 $7.000 $19.320 $5.000 $10.000
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
LF 450.000 $20.000 $14.540 $6.850 $25.000 $27.220 $8.490 $30.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 182.000 $92.000 $108.320 $124.140 $100.000 $143.970 $130.080 $250.000
COLORED TEXTURED CONC (4")
SY 23,840.000 $150.000 $70.000 $88.200 $110.000 $77.640 $99.700 $95.000
LANDSCAPE PAVERS
SY 372.000 $126.500 $172.840 $201.370 $175.000 $107.960 $114.850 $95.000
REMOVE AND RELAY PAVERS
SY 254.000 $170.000 $75.000 $150.000 $175.000 $45.830 $68.610 $150.000
CONC CURB (TY I)
LF 161.000 $35.000 $62.870 $8.730 $10.000 $18.500 $15.300 $50.000
CONC CURB (TY II)
LF 837.000 $45.000 $43.050 $13.730 $12.000 $22.440 $14.790 $45.000
CONC SIDEWALKS (4")
SY 618.000 $110.000 $108.050 $94.990 $120.000 $77.220 $76.090 $95.000
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $30.000 $38.250 $43.000 $45.800 $45.800 $44.950 $29.490
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $2,025.000 $2,455.000 $1,912.000 $1,605.000 $1,605.000 $1,999.250 $1,287.490
REMOVE METAL BEAM GUARD FENCE
LF 425.000 $7.350 $10.000 $4.000 $3.000 $3.000 $4.190 $2.490
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $350.000 $850.000 $250.000 $330.000 $330.000 $261.420 $195.490
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 2.000 $400.000 $500.000 $250.000 $260.000 $260.000 $261.410 $249.490
GUARDRAIL END TREATMENT (INSTALL)
EA 1.000 $3,800.000 $4,150.000 $4,262.000 $4,275.000 $4,275.000 $4,456.490 $3,284.490
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $375.000 $500.000 $275.000 $330.000 $330.000 $287.560 $437.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $2,500.000 $2,885.000 $1,500.000 $1,515.000 $1,515.000 $1,568.460 $1,597.490
CRASH CUSH ATTEN (REMOVE)
EA 19.000 $850.000 $555.000 $1,300.000 $810.000 $810.000 $1,359.320 $521.490
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 7.000 $30,000.000 $25,950.000 $26,350.000 $27,450.000 $27,450.000 $27,552.500 $27,950.490
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 1.000 $40,000.000 $41,325.000 $42,275.000 $45,500.000 $45,500.000 $44,204.260 $43,321.490
CCA (INSTL)(N)(TL3)(WORK ZONE)
EA 20.000 $7,200.000 $7,125.000 $7,850.000 $8,585.000 $8,585.000 $8,208.230 $9,542.490
CCA (INSTL)(W)(TL3)(WORK ZONE)
EA 2.000 $8,000.000 $11,250.000 $6,900.000 $12,110.000 $12,110.000 $7,214.880 $12,487.490
CHAIN LINK FENCE (INSTALL) (6')
LF 80.000 $70.000 $47.000 $49.490 $42.500 $42.500 $44.430 $49.490
CHAIN LINK FENCE (REMOVE)
LF 80.000 $10.000 $17.000 $5.490 $11.000 $11.000 $11.500 $5.490
PIPE UNDERDRAINS (TY 6) (6")
LF 3,070.000 $28.000 $45.520 $40.980 $30.000 $15.000 $37.380 $45.000
ALUMINUM SIGNS (TY A)
SF 115.000 $50.000 $35.000 $58.000 $25.000 $24.200 $25.300 $25.330
ALUMINUM SIGNS (TY G)
SF 332.250 $47.000 $35.000 $35.000 $28.000 $31.600 $33.040 $25.330
ALUMINUM SIGNS (TY O)
SF 3,866.500 $45.000 $30.000 $47.000 $27.000 $45.000 $49.140 $50.920
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 2.000 $900.000 $775.000 $1,000.000 $1,330.000 $1,330.000 $1,390.690 $1,391.870
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 3.000 $900.000 $825.000 $1,000.000 $1,390.000 $1,390.000 $1,453.430 $1,454.660
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $3,800.000 $2,500.000 $2,500.000 $2,210.000 $2,210.000 $2,310.850 $2,312.800
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 8.000 $2,200.000 $2,500.000 $2,500.000 $2,265.000 $2,265.000 $2,368.360 $2,370.360
IN SRSS & AM (RAIL)(130 MPH)(P MOUNT)
EA 3.000 $5,300.000 $6,898.000 $3,500.000 $4,070.000 $4,070.000 $4,255.740 $4,259.310
IN SRSS & AM (RAIL)(130 MPH)(T MOUNT)
EA 2.000 $6,700.000 $7,455.000 $3,500.000 $4,350.000 $4,350.000 $4,548.520 $4,552.340
INSTALL LRSS (STRUCT STEEL)
LB 1,608.000 $8.280 $5.300 $5.300 $8.000 $6.550 $6.850 $5.740
REMOVE LRSA
EA 3.000 $1,000.000 $680.000 $680.000 $1,250.000 $735.000 $768.530 $736.740
INS OH SN SUP(35 FT CANT)
EA 1.000 $72,631.390 $49,600.000 $49,600.000 $50,600.000 $50,000.000 $51,863.550 $53,448.000
REMOVE OVERHD SIGN SUP (SIGN ONLY)
EA 14.000 $1,711.120 $510.000 $510.000 $800.000 $2,000.000 $533.280 $552.560
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 2,734.000 $1.670 $1.500 $1.500 $1.100 $1.500 $1.570 $1.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,728.000 $4.120 $1.800 $1.800 $3.500 $1.800 $1.880 $1.800
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 1,140.000 $3.540 $2.000 $2.000 $5.000 $2.000 $2.090 $2.000
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
LF 1,634.200 $1.380 $1.200 $1.200 $0.750 $1.200 $1.250 $1.200
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
LF 15,426.000 $0.980 $0.780 $0.780 $0.750 $0.780 $0.810 $0.780
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
LF 12,356.000 $1.280 $0.780 $0.780 $0.750 $0.780 $0.810 $0.780
PAVEMENT SLER 6"
LF 30,556.000 $0.300 $0.420 $0.420 $0.300 $0.420 $0.440 $0.420
PAVEMENT SLER 8"
LF 2,724.000 $0.530 $0.600 $0.600 $0.400 $0.600 $0.630 $0.600
PAVEMENT SLER 12"
LF 1,906.000 $1.390 $0.800 $0.800 $1.750 $0.800 $0.840 $0.800
REFL PAV MRKR TY II-C-R
EA 151.000 $5.970 $15.000 $15.000 $5.500 $15.000 $15.690 $15.000
ELIM EXT PM & MRKS (6")
LF 10,299.200 $82.000 $0.450 $0.450 $0.550 $0.450 $0.470 $0.450
PAV SURF PREP FOR MRK (6")
LF 27,475.000 $0.270 $0.050 $0.050 $0.300 $0.050 $0.050 $0.050
PAV SURF PREP FOR MRK (8")
LF 2,724.000 $0.340 $0.100 $0.100 $0.400 $0.100 $0.100 $0.100
PAV SURF PREP FOR MRK (12")
LF 1,576.000 $0.510 $0.150 $0.150 $1.000 $0.150 $0.160 $0.150
PAV SURF PREP FOR MRK (RPM)
EA 181.000 $0.410 $0.250 $0.250 $2.500 $0.250 $0.260 $0.250
ANTI-GRAFFITI COATING (PERMNENT-TY II)
SF 20,107.000 $2.260 $0.970 $0.850 $1.000 $0.850 $1.010 $0.970
WIDE FLANGE PAVEMENT TERMINALS
LF 38.000 $700.000 $1,716.580 $730.890 $967.680 $50.000 $1,048.750 $554.190
TIP TESTING(DRILL SHAFT)
EA 10.000 $5,500.000 $5,060.000 $5,000.000 $10,000.000 $18,375.290 $5,228.180 $5,000.000
Totals: $66,832,713.241 $69,849,999.485 $73,054,631.800 $77,234,904.660 $80,299,234.023 $85,984,574.030 $104,119,421.068
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
STATE FORCE ACCOUNT WORK (NON-PART) $230,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $20,000.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $65,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (NON-PART) $50,000.00
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) $100,000.00
CONTRACTOR FORCE ACCOUNT OR AGREED UNIT PRICE (PART) $275,000.00
Total: $740,000.00