PREPARING ROW
|
STA
|
47.000
|
$2,500.000
|
$25,000.000
|
$81,260.000
|
$164,000.000
|
$171,220.830
|
$181,000.000
|
$75,000.000
|
|
|
REMOV CONC (PAV)
|
SY
|
828.000
|
$35.000
|
$34.020
|
$14.600
|
$20.000
|
$15.000
|
$19.290
|
$50.000
|
|
|
REMOV CONC (MOWSTRIP)
|
LF
|
526.000
|
$25.000
|
$21.810
|
$4.980
|
$10.000
|
$65.000
|
$7.410
|
$20.000
|
|
|
REMOV CONC (RIPRAP)
|
SY
|
260.000
|
$30.000
|
$28.810
|
$9.490
|
$20.000
|
$25.000
|
$8.680
|
$20.000
|
|
|
REMOV CONC (SIDEWALK, RAMP OR SUP)
|
SY
|
615.000
|
$28.000
|
$24.820
|
$8.380
|
$20.000
|
$25.000
|
$12.920
|
$20.000
|
|
|
REMOV CONC (CURB)
|
LF
|
1,482.000
|
$20.000
|
$9.460
|
$3.120
|
$4.000
|
$10.000
|
$3.720
|
$10.000
|
|
|
REMOV CONC (COPING)
|
LF
|
45.000
|
$390.000
|
$28.320
|
$51.270
|
$100.000
|
$75.000
|
$69.610
|
$50.000
|
|
|
REMOV CONC (TRAFFIC BARRIER)
|
LF
|
650.000
|
$30.000
|
$32.460
|
$12.740
|
$30.000
|
$25.000
|
$16.360
|
$20.000
|
|
|
REMOV CONC (RAIL)
|
LF
|
244.000
|
$50.000
|
$31.950
|
$22.200
|
$25.000
|
$18.000
|
$17.300
|
$25.000
|
|
|
RMV (10"-12") TRT/UNTRT BASE & ASPH PAV
|
SY
|
891.000
|
$25.000
|
$10.840
|
$5.820
|
$20.000
|
$14.860
|
$18.270
|
$20.000
|
|
|
EXCAV (ROADWAY)
|
CY
|
610.000
|
$40.000
|
$7.000
|
$5.650
|
$40.000
|
$30.000
|
$54.580
|
$7.000
|
|
|
EMBANK (FNL)(DC)(TY C)
|
CY
|
15,208.000
|
$20.000
|
$12.000
|
$70.620
|
$20.000
|
$95.060
|
$90.280
|
$15.000
|
|
|
DRILL SEED (PERM_RURAL_CLAY)
|
AC
|
1.000
|
$550.000
|
$13,600.000
|
$4,950.000
|
$15,000.000
|
$3,860.000
|
$4,036.160
|
$3,860.000
|
|
|
VEGETATIVE WATERING
|
TGL
|
676.000
|
$27.000
|
$130.340
|
$40.000
|
$36.000
|
$80.000
|
$41.830
|
$50.000
|
|
|
SPRINKLING (DUST CONTROL)
|
TGL
|
47.000
|
$70.000
|
$100.000
|
$68.040
|
$36.000
|
$40.000
|
$21.490
|
$50.000
|
|
|
LIME (COM OR QK)(SLURRY) OR QK(DRY)
|
TON
|
2.000
|
$400.000
|
$397.760
|
$1,061.650
|
$450.000
|
$350.000
|
$418.260
|
$5,000.000
|
|
|
LIME TRT (EXIST MATL)(8")
|
SY
|
139.000
|
$20.000
|
$57.160
|
$34.470
|
$6.000
|
$5.000
|
$150.000
|
$85.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
1,972.000
|
$6.000
|
$5.000
|
$4.500
|
$5.000
|
$9.000
|
$4.710
|
$10.000
|
|
|
D-GR HMA TY-B PG64-22 (EXEMPT)
|
TON
|
1,577.000
|
$144.000
|
$157.000
|
$133.000
|
$185.000
|
$158.000
|
$135.170
|
$150.000
|
|
|
CONC PVMT (CRCP) (12")
|
SY
|
6,541.000
|
$152.000
|
$120.000
|
$132.820
|
$100.000
|
$125.430
|
$154.830
|
$150.000
|
|
|
CUT & RESTORING PAV
|
SY
|
62.000
|
$270.000
|
$278.520
|
$239.370
|
$295.000
|
$75.000
|
$380.740
|
$1,000.000
|
|
|
CEM STABIL BKFL
|
CY
|
477.000
|
$230.000
|
$319.480
|
$85.150
|
$115.000
|
$287.180
|
$175.030
|
$125.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
2,610.000
|
$11.000
|
$2.000
|
$1.690
|
$14.000
|
$6.410
|
$19.330
|
$1.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
30,856.000
|
$40.000
|
$20.130
|
$18.470
|
$1.000
|
$16.200
|
$15.270
|
$31.500
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
148.000
|
$402.520
|
$300.000
|
$226.580
|
$300.000
|
$417.480
|
$269.620
|
$500.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
368.000
|
$550.000
|
$460.000
|
$451.350
|
$400.000
|
$486.950
|
$526.870
|
$550.000
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
2,288.000
|
$631.670
|
$515.000
|
$487.680
|
$625.000
|
$665.340
|
$548.150
|
$600.000
|
|
|
DRILL SHAFT (60 IN)
|
LF
|
992.000
|
$774.960
|
$550.000
|
$544.090
|
$750.000
|
$854.740
|
$593.470
|
$675.000
|
|
|
DRILL SHAFT (78 IN)
|
LF
|
152.000
|
$986.960
|
$1,100.000
|
$1,007.410
|
$1,200.000
|
$1,444.220
|
$1,079.260
|
$1,500.000
|
|
|
DRILL SHAFT (84 IN)
|
LF
|
192.000
|
$1,000.000
|
$1,225.000
|
$1,086.720
|
$1,400.000
|
$1,418.540
|
$1,314.440
|
$1,600.000
|
|
|
DRILL SHAFT (90 IN)
|
LF
|
199.000
|
$1,500.000
|
$1,350.000
|
$1,406.060
|
$1,500.000
|
$1,629.010
|
$1,585.890
|
$1,875.000
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
30.000
|
$261.580
|
$330.000
|
$330.000
|
$200.000
|
$135.000
|
$345.060
|
$141.280
|
|
|
DRILL SHAFT (SIGN MTS) (48 IN)
|
LF
|
26.000
|
$832.200
|
$590.000
|
$590.000
|
$500.000
|
$800.000
|
$616.930
|
$639.230
|
|
|
DRILL SHAFT (114 IN)
|
LF
|
120.000
|
$2,200.000
|
$1,750.000
|
$1,652.660
|
$2,500.000
|
$2,956.400
|
$1,871.400
|
$2,500.000
|
|
|
CL C CONC (ABUT)
|
CY
|
18.200
|
$1,360.000
|
$2,500.000
|
$1,355.130
|
$2,400.000
|
$1,643.250
|
$1,440.090
|
$2,500.000
|
|
|
CL C CONC (CAP)
|
CY
|
149.100
|
$1,550.000
|
$1,300.000
|
$1,334.860
|
$1,300.000
|
$1,404.460
|
$1,380.410
|
$3,800.000
|
|
|
CL C CONC (CAP)(MASS)
|
CY
|
379.200
|
$1,409.000
|
$1,400.000
|
$1,083.190
|
$1,500.000
|
$1,552.330
|
$2,405.590
|
$3,550.000
|
|
|
CL C CONC (CAP)(EXTEND)
|
CY
|
1.000
|
$15,000.000
|
$12,000.000
|
$6,951.760
|
$15,000.000
|
$6,219.570
|
$12,000.000
|
$18,000.000
|
|
|
CL C CONC (CAP)(INVT)
|
CY
|
232.400
|
$1,116.000
|
$1,300.000
|
$1,167.410
|
$2,400.000
|
$1,368.010
|
$2,449.280
|
$3,200.000
|
|
|
CL C CONC (CAP)(INVT)(MASS)
|
CY
|
407.800
|
$1,115.600
|
$1,400.000
|
$1,040.580
|
$1,600.000
|
$1,131.500
|
$2,463.890
|
$3,000.000
|
|
|
CL C CONC (COLUMN)
|
CY
|
416.500
|
$1,480.000
|
$1,200.000
|
$1,404.600
|
$1,800.000
|
$1,068.680
|
$1,182.080
|
$3,500.000
|
|
|
CL C CONC (COLUMN)(MASS)
|
CY
|
3,321.200
|
$1,124.200
|
$1,000.000
|
$1,077.280
|
$800.000
|
$956.110
|
$1,231.600
|
$2,300.000
|
|
|
CL C CONC (FOOTING)(MASS)
|
CY
|
643.400
|
$925.000
|
$900.000
|
$670.630
|
$850.000
|
$618.920
|
$868.130
|
$2,000.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
691.000
|
$900.000
|
$600.000
|
$538.650
|
$500.000
|
$763.570
|
$667.360
|
$1,000.000
|
|
|
CL F CONC (FOOTING)(MASS)
|
CY
|
1,299.000
|
$1,000.000
|
$1,000.000
|
$843.310
|
$1,000.000
|
$802.100
|
$924.530
|
$2,500.000
|
|
|
CL H CONC (CAP)(MASS)
|
CY
|
292.700
|
$1,150.000
|
$1,500.000
|
$1,498.340
|
$1,200.000
|
$3,494.240
|
$2,323.850
|
$4,200.000
|
|
|
CL H CONC (PT CAP)(MASS)
|
CY
|
160.400
|
$1,660.000
|
$1,400.000
|
$1,006.750
|
$1,300.000
|
$1,749.270
|
$1,932.980
|
$3,800.000
|
|
|
REINF CONC SLAB
|
SF
|
188,005.000
|
$23.000
|
$35.000
|
$37.010
|
$20.000
|
$31.850
|
$39.340
|
$30.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
34,468.000
|
$76.000
|
$75.000
|
$42.400
|
$70.000
|
$57.040
|
$51.800
|
$110.000
|
|
|
RETAINING WALL (CAST-IN-PLACE)
|
SF
|
477.000
|
$107.200
|
$169.930
|
$84.170
|
$115.000
|
$125.520
|
$83.450
|
$200.000
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
7,088.890
|
$244.000
|
$213.820
|
$212.860
|
$145.000
|
$245.000
|
$226.350
|
$1,400.000
|
|
|
PT FOR CAP
|
EA
|
1.000
|
$96,000.000
|
$150,000.000
|
$112,000.000
|
$100,000.000
|
$153,144.890
|
$144,267.240
|
$155,000.000
|
|
|
CONCRETE PAINT FINISH
|
SF
|
78,282.000
|
$0.700
|
$0.430
|
$0.350
|
$0.430
|
$0.350
|
$0.450
|
$0.430
|
|
|
CONC STR REPAIR(DECK REP(PART DEPTH))
|
SF
|
160.000
|
$108.000
|
$55.000
|
$55.000
|
$60.000
|
$167.500
|
$57.500
|
$125.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
112.200
|
$625.000
|
$620.230
|
$433.780
|
$865.000
|
$591.840
|
$896.740
|
$1,000.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
66.700
|
$740.000
|
$980.910
|
$694.750
|
$865.000
|
$597.460
|
$804.220
|
$1,000.000
|
|
|
ELASTOMERIC BEARING (EE5)
|
EA
|
16.000
|
$3,468.350
|
$6,300.800
|
$2,703.990
|
$2,000.000
|
$4,765.010
|
$3,631.160
|
$1,700.000
|
|
|
ELASTOMERIC BEARING (EE6)
|
EA
|
20.000
|
$3,060.000
|
$6,299.800
|
$2,812.190
|
$2,000.000
|
$4,825.930
|
$3,630.120
|
$1,700.000
|
|
|
ELASTOMERIC BEARING (E6)
|
EA
|
8.000
|
$3,500.000
|
$7,648.240
|
$4,143.430
|
$2,000.000
|
$6,044.370
|
$5,036.500
|
$3,000.000
|
|
|
ELASTOMERIC BEARING (E7)
|
EA
|
8.000
|
$4,062.500
|
$8,414.200
|
$5,360.070
|
$2,000.000
|
$6,068.870
|
$5,835.360
|
$3,800.000
|
|
|
ELASTOMERIC BEARING (E9)
|
EA
|
4.000
|
$5,250.000
|
$8,741.030
|
$5,670.390
|
$2,000.000
|
$7,136.390
|
$6,176.250
|
$4,100.000
|
|
|
ELASTOMERIC BEARING (F6)
|
EA
|
8.000
|
$3,500.000
|
$7,648.240
|
$4,143.430
|
$2,000.000
|
$8,392.690
|
$5,036.500
|
$3,000.000
|
|
|
ELASTOMERIC BEARING (F7)
|
EA
|
8.000
|
$3,500.000
|
$8,414.200
|
$5,240.110
|
$2,000.000
|
$6,725.460
|
$5,835.360
|
$3,800.000
|
|
|
ELASTOMERIC BEARING (F8)
|
EA
|
4.000
|
$4,920.000
|
$8,881.390
|
$5,262.720
|
$2,000.000
|
$6,294.880
|
$6,322.640
|
$4,250.000
|
|
|
ELASTOMERIC BEARING (F9)
|
EA
|
8.000
|
$4,920.000
|
$8,741.030
|
$5,549.050
|
$2,000.000
|
$7,106.590
|
$6,176.240
|
$4,100.000
|
|
|
ELASTOMERIC BEARING (F10)
|
EA
|
4.000
|
$5,589.560
|
$9,419.770
|
$5,940.050
|
$2,000.000
|
$7,517.600
|
$6,884.150
|
$4,800.000
|
|
|
SLIDING ELASTOMERIC BEARING (ES 5)
|
EA
|
16.000
|
$3,500.000
|
$7,255.240
|
$3,844.200
|
$2,000.000
|
$8,844.240
|
$4,689.350
|
$2,600.000
|
|
|
SLIDING ELASTOMERIC BEARING (ES 9)
|
EA
|
12.000
|
$5,000.000
|
$7,826.700
|
$4,459.900
|
$2,000.000
|
$6,734.220
|
$5,222.630
|
$3,200.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
56.000
|
$77.000
|
$20.000
|
$100.000
|
$180.000
|
$4,000.000
|
$52.270
|
$260.000
|
|
|
CLEAN AND SEAL EXIST JTS (STRIP SEAL)
|
LF
|
80.000
|
$90.000
|
$100.000
|
$100.000
|
$180.000
|
$100.000
|
$104.570
|
$115.000
|
|
|
CONCRETE OVERLAY (2 IN)
|
SY
|
867.000
|
$120.000
|
$206.000
|
$207.980
|
$200.000
|
$206.000
|
$228.810
|
$206.500
|
|
|
CONCRETE OVERLAY (3 IN)
|
SY
|
415.000
|
$125.000
|
$230.000
|
$231.980
|
$200.000
|
$230.000
|
$253.900
|
$230.500
|
|
|
STR STEEL (PLATE GIRDER)
|
LB
|
11,152,200.000
|
$2.300
|
$2.500
|
$2.660
|
$2.700
|
$2.690
|
$2.800
|
$3.100
|
|
|
RAIL (TY SSTR)
|
LF
|
565.000
|
$84.000
|
$61.720
|
$63.910
|
$60.000
|
$97.340
|
$65.440
|
$95.000
|
|
|
RAIL (TY T80SS)
|
LF
|
17,344.200
|
$115.000
|
$87.090
|
$76.400
|
$120.000
|
$87.240
|
$69.970
|
$95.000
|
|
|
RAIL (HANDRAIL)(TY B)
|
LF
|
83.000
|
$121.070
|
$138.300
|
$140.800
|
$150.000
|
$138.300
|
$259.810
|
$144.540
|
|
|
RAIL (CLF-RO)(MOD)
|
LF
|
1,485.700
|
$81.300
|
$112.000
|
$215.000
|
$112.000
|
$112.000
|
$117.110
|
$117.050
|
|
|
RAIL(TY T80SS)(MOD)
|
LF
|
66.000
|
$305.000
|
$252.130
|
$156.220
|
$300.000
|
$210.780
|
$115.590
|
$250.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
73.100
|
$219.150
|
$227.860
|
$181.500
|
$400.000
|
$430.050
|
$183.650
|
$250.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
56.000
|
$218.740
|
$261.360
|
$180.700
|
$200.000
|
$226.140
|
$222.320
|
$400.000
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - M)
|
LF
|
484.000
|
$275.130
|
$261.350
|
$184.060
|
$200.000
|
$237.310
|
$222.320
|
$275.000
|
|
|
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
|
LF
|
4.000
|
$1,580.000
|
$2,834.260
|
$1,713.520
|
$4,275.000
|
$2,000.000
|
$2,019.930
|
$8,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
68.000
|
$113.790
|
$315.890
|
$96.820
|
$135.000
|
$99.720
|
$178.130
|
$450.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,142.000
|
$119.000
|
$189.070
|
$85.190
|
$152.000
|
$99.920
|
$175.850
|
$200.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
623.000
|
$208.330
|
$163.740
|
$94.230
|
$180.000
|
$131.470
|
$146.390
|
$200.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
684.000
|
$250.920
|
$210.810
|
$107.610
|
$225.000
|
$203.470
|
$180.550
|
$225.000
|
|
|
RC PIPE (CL III)(48 IN)
|
LF
|
234.000
|
$280.000
|
$298.490
|
$178.840
|
$315.000
|
$308.460
|
$276.680
|
$400.000
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
10.000
|
$8,900.000
|
$7,693.430
|
$6,515.270
|
$7,275.000
|
$7,400.000
|
$8,207.200
|
$7,500.000
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
1.000
|
$13,000.000
|
$9,140.520
|
$10,180.380
|
$10,500.000
|
$16,500.000
|
$15,037.910
|
$15,000.000
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
4.000
|
$7,000.000
|
$7,500.000
|
$5,277.950
|
$5,260.000
|
$4,200.000
|
$13,079.700
|
$6,500.000
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
1.000
|
$7,000.000
|
$7,399.410
|
$6,495.930
|
$5,795.000
|
$16,500.000
|
$7,421.840
|
$12,000.000
|
|
|
INLET (COMPL)(POD)(FG)(4FTX4FT)
|
EA
|
7.000
|
$9,800.000
|
$7,873.730
|
$5,466.370
|
$6,830.000
|
$6,200.000
|
$10,143.770
|
$9,000.000
|
|
|
INLET(COMPL)(PAZD)(FG)(4FTX4FT-3FTX3FT)
|
EA
|
4.000
|
$7,600.000
|
$7,603.760
|
$5,884.120
|
$6,925.000
|
$8,300.000
|
$3,938.640
|
$8,500.000
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
1.000
|
$37,800.000
|
$75,000.000
|
$46,292.850
|
$41,500.000
|
$41,549.710
|
$82,958.950
|
$75,000.000
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
8.000
|
$3,000.000
|
$6,084.260
|
$5,002.330
|
$6,000.000
|
$3,500.000
|
$4,099.590
|
$6,500.000
|
|
|
JACK BOR OR TUN PIPE(36 IN)(RC)(CL III)
|
LF
|
67.000
|
$1,862.500
|
$2,122.000
|
$2,056.140
|
$2,485.000
|
$2,102.280
|
$2,852.450
|
$1,725.000
|
|
|
ADJUSTING INLETS (CAP)
|
EA
|
6.000
|
$3,019.480
|
$3,121.130
|
$2,924.080
|
$3,250.000
|
$4,200.000
|
$4,517.620
|
$5,000.000
|
|
|
PIPE (PVC) (SCH 40) (6 IN)
|
LF
|
560.000
|
$128.040
|
$148.830
|
$93.520
|
$55.000
|
$136.160
|
$72.580
|
$130.000
|
|
|
HYDRO-DEMOLITION (1 IN)
|
SY
|
1,282.000
|
$70.000
|
$242.000
|
$242.000
|
$250.000
|
$242.000
|
$253.050
|
$242.000
|
|
|
REMOV STR (INLET)
|
EA
|
3.000
|
$1,238.320
|
$3,206.750
|
$1,064.930
|
$550.000
|
$1,500.000
|
$2,438.370
|
$2,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
1.000
|
$2,935.370
|
$4,847.500
|
$1,691.910
|
$1,585.000
|
$2,000.000
|
$2,248.850
|
$7,500.000
|
|
|
REMOV STR (PIPE)
|
LF
|
813.000
|
$30.000
|
$42.470
|
$26.110
|
$31.000
|
$20.000
|
$50.030
|
$45.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
23.000
|
$220.000
|
$445.820
|
$68.460
|
$155.000
|
$200.000
|
$109.600
|
$400.000
|
|
|
REMOVE STR (RAIL)
|
LF
|
452.000
|
$31.000
|
$13.320
|
$16.820
|
$15.000
|
$50.000
|
$18.160
|
$30.000
|
|
|
REMOV STR (RET WALL)
|
LF
|
764.000
|
$60.000
|
$40.740
|
$15.300
|
$200.000
|
$75.000
|
$13.900
|
$40.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$5,435,351.080
|
$6,838,541.000
|
$7,000,000.000
|
$8,428,825.000
|
$7,728,966.090
|
$8,500,000.000
|
$10,400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
23.000
|
$3,500.000
|
$22,000.000
|
$48,000.000
|
$25,000.000
|
$11,003.520
|
$40,000.000
|
$5,000.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
10.000
|
$6,000.000
|
$15,000.000
|
$13,206.200
|
$1,000.000
|
$5,940.250
|
$25,000.000
|
$20,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
487.000
|
$300.000
|
$300.000
|
$191.430
|
$353.000
|
$163.270
|
$325.000
|
$1.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,558.100
|
$40.000
|
$33.700
|
$36.000
|
$30.000
|
$33.700
|
$35.240
|
$30.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,558.100
|
$21.000
|
$7.780
|
$22.000
|
$10.000
|
$7.780
|
$8.130
|
$10.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
1,020.000
|
$5.100
|
$12.350
|
$3.950
|
$4.000
|
$12.350
|
$12.910
|
$6.500
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
1,020.000
|
$1.900
|
$1.650
|
$2.250
|
$1.500
|
$1.650
|
$1.720
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
540.000
|
$7.000
|
$10.000
|
$5.900
|
$7.000
|
$10.000
|
$10.460
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
540.000
|
$4.000
|
$1.000
|
$2.250
|
$1.500
|
$1.000
|
$1.040
|
$1.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
769.000
|
$121.900
|
$129.170
|
$132.960
|
$215.000
|
$142.460
|
$130.430
|
$150.000
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
12,750.000
|
$35.000
|
$50.290
|
$6.930
|
$60.000
|
$18.570
|
$30.000
|
$60.000
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
1,290.000
|
$7.600
|
$15.340
|
$7.110
|
$7.000
|
$16.230
|
$35.980
|
$10.000
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
14,010.000
|
$14.000
|
$12.540
|
$6.850
|
$7.000
|
$19.320
|
$5.000
|
$10.000
|
|
|
PTB (REMOVE)(SSCB OR CSB)(TY1)OR(STL)
|
LF
|
450.000
|
$20.000
|
$14.540
|
$6.850
|
$25.000
|
$27.220
|
$8.490
|
$30.000
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
182.000
|
$92.000
|
$108.320
|
$124.140
|
$100.000
|
$143.970
|
$130.080
|
$250.000
|
|
|
COLORED TEXTURED CONC (4")
|
SY
|
23,840.000
|
$150.000
|
$70.000
|
$88.200
|
$110.000
|
$77.640
|
$99.700
|
$95.000
|
|
|
LANDSCAPE PAVERS
|
SY
|
372.000
|
$126.500
|
$172.840
|
$201.370
|
$175.000
|
$107.960
|
$114.850
|
$95.000
|
|
|
REMOVE AND RELAY PAVERS
|
SY
|
254.000
|
$170.000
|
$75.000
|
$150.000
|
$175.000
|
$45.830
|
$68.610
|
$150.000
|
|
|
CONC CURB (TY I)
|
LF
|
161.000
|
$35.000
|
$62.870
|
$8.730
|
$10.000
|
$18.500
|
$15.300
|
$50.000
|
|
|
CONC CURB (TY II)
|
LF
|
837.000
|
$45.000
|
$43.050
|
$13.730
|
$12.000
|
$22.440
|
$14.790
|
$45.000
|
|
|
CONC SIDEWALKS (4")
|
SY
|
618.000
|
$110.000
|
$108.050
|
$94.990
|
$120.000
|
$77.220
|
$76.090
|
$95.000
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
75.000
|
$30.000
|
$38.250
|
$43.000
|
$45.800
|
$45.800
|
$44.950
|
$29.490
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$2,025.000
|
$2,455.000
|
$1,912.000
|
$1,605.000
|
$1,605.000
|
$1,999.250
|
$1,287.490
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
425.000
|
$7.350
|
$10.000
|
$4.000
|
$3.000
|
$3.000
|
$4.190
|
$2.490
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$350.000
|
$850.000
|
$250.000
|
$330.000
|
$330.000
|
$261.420
|
$195.490
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$400.000
|
$500.000
|
$250.000
|
$260.000
|
$260.000
|
$261.410
|
$249.490
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
1.000
|
$3,800.000
|
$4,150.000
|
$4,262.000
|
$4,275.000
|
$4,275.000
|
$4,456.490
|
$3,284.490
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
2.000
|
$375.000
|
$500.000
|
$275.000
|
$330.000
|
$330.000
|
$287.560
|
$437.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
1.000
|
$2,500.000
|
$2,885.000
|
$1,500.000
|
$1,515.000
|
$1,515.000
|
$1,568.460
|
$1,597.490
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
19.000
|
$850.000
|
$555.000
|
$1,300.000
|
$810.000
|
$810.000
|
$1,359.320
|
$521.490
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
|
EA
|
7.000
|
$30,000.000
|
$25,950.000
|
$26,350.000
|
$27,450.000
|
$27,450.000
|
$27,552.500
|
$27,950.490
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
|
EA
|
1.000
|
$40,000.000
|
$41,325.000
|
$42,275.000
|
$45,500.000
|
$45,500.000
|
$44,204.260
|
$43,321.490
|
|
|
CCA (INSTL)(N)(TL3)(WORK ZONE)
|
EA
|
20.000
|
$7,200.000
|
$7,125.000
|
$7,850.000
|
$8,585.000
|
$8,585.000
|
$8,208.230
|
$9,542.490
|
|
|
CCA (INSTL)(W)(TL3)(WORK ZONE)
|
EA
|
2.000
|
$8,000.000
|
$11,250.000
|
$6,900.000
|
$12,110.000
|
$12,110.000
|
$7,214.880
|
$12,487.490
|
|
|
CHAIN LINK FENCE (INSTALL) (6')
|
LF
|
80.000
|
$70.000
|
$47.000
|
$49.490
|
$42.500
|
$42.500
|
$44.430
|
$49.490
|
|
|
CHAIN LINK FENCE (REMOVE)
|
LF
|
80.000
|
$10.000
|
$17.000
|
$5.490
|
$11.000
|
$11.000
|
$11.500
|
$5.490
|
|
|
PIPE UNDERDRAINS (TY 6) (6")
|
LF
|
3,070.000
|
$28.000
|
$45.520
|
$40.980
|
$30.000
|
$15.000
|
$37.380
|
$45.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
115.000
|
$50.000
|
$35.000
|
$58.000
|
$25.000
|
$24.200
|
$25.300
|
$25.330
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
332.250
|
$47.000
|
$35.000
|
$35.000
|
$28.000
|
$31.600
|
$33.040
|
$25.330
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
3,866.500
|
$45.000
|
$30.000
|
$47.000
|
$27.000
|
$45.000
|
$49.140
|
$50.920
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$900.000
|
$775.000
|
$1,000.000
|
$1,330.000
|
$1,330.000
|
$1,390.690
|
$1,391.870
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
3.000
|
$900.000
|
$825.000
|
$1,000.000
|
$1,390.000
|
$1,390.000
|
$1,453.430
|
$1,454.660
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$3,800.000
|
$2,500.000
|
$2,500.000
|
$2,210.000
|
$2,210.000
|
$2,310.850
|
$2,312.800
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
8.000
|
$2,200.000
|
$2,500.000
|
$2,500.000
|
$2,265.000
|
$2,265.000
|
$2,368.360
|
$2,370.360
|
|
|
IN SRSS & AM (RAIL)(130 MPH)(P MOUNT)
|
EA
|
3.000
|
$5,300.000
|
$6,898.000
|
$3,500.000
|
$4,070.000
|
$4,070.000
|
$4,255.740
|
$4,259.310
|
|
|
IN SRSS & AM (RAIL)(130 MPH)(T MOUNT)
|
EA
|
2.000
|
$6,700.000
|
$7,455.000
|
$3,500.000
|
$4,350.000
|
$4,350.000
|
$4,548.520
|
$4,552.340
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
1,608.000
|
$8.280
|
$5.300
|
$5.300
|
$8.000
|
$6.550
|
$6.850
|
$5.740
|
|
|
REMOVE LRSA
|
EA
|
3.000
|
$1,000.000
|
$680.000
|
$680.000
|
$1,250.000
|
$735.000
|
$768.530
|
$736.740
|
|
|
INS OH SN SUP(35 FT CANT)
|
EA
|
1.000
|
$72,631.390
|
$49,600.000
|
$49,600.000
|
$50,600.000
|
$50,000.000
|
$51,863.550
|
$53,448.000
|
|
|
REMOVE OVERHD SIGN SUP (SIGN ONLY)
|
EA
|
14.000
|
$1,711.120
|
$510.000
|
$510.000
|
$800.000
|
$2,000.000
|
$533.280
|
$552.560
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
2,734.000
|
$1.670
|
$1.500
|
$1.500
|
$1.100
|
$1.500
|
$1.570
|
$1.500
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,728.000
|
$4.120
|
$1.800
|
$1.800
|
$3.500
|
$1.800
|
$1.880
|
$1.800
|
|
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
|
LF
|
1,140.000
|
$3.540
|
$2.000
|
$2.000
|
$5.000
|
$2.000
|
$2.090
|
$2.000
|
|
TY I HIGH PERF PM (W)6"(BRK)(100MIL)
|
LF
|
1,634.200
|
$1.380
|
$1.200
|
$1.200
|
$0.750
|
$1.200
|
$1.250
|
$1.200
|
|
TY I HIGH PERF PM (W)6"(SLD)(100MIL)
|
LF
|
15,426.000
|
$0.980
|
$0.780
|
$0.780
|
$0.750
|
$0.780
|
$0.810
|
$0.780
|
|
TY I HIGH PERF PM (Y)6"(SLD)(100MIL)
|
LF
|
12,356.000
|
$1.280
|
$0.780
|
$0.780
|
$0.750
|
$0.780
|
$0.810
|
$0.780
|
|
|
PAVEMENT SLER 6"
|
LF
|
30,556.000
|
$0.300
|
$0.420
|
$0.420
|
$0.300
|
$0.420
|
$0.440
|
$0.420
|
|
|
PAVEMENT SLER 8"
|
LF
|
2,724.000
|
$0.530
|
$0.600
|
$0.600
|
$0.400
|
$0.600
|
$0.630
|
$0.600
|
|
|
PAVEMENT SLER 12"
|
LF
|
1,906.000
|
$1.390
|
$0.800
|
$0.800
|
$1.750
|
$0.800
|
$0.840
|
$0.800
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
151.000
|
$5.970
|
$15.000
|
$15.000
|
$5.500
|
$15.000
|
$15.690
|
$15.000
|
|
|
ELIM EXT PM & MRKS (6")
|
LF
|
10,299.200
|
$82.000
|
$0.450
|
$0.450
|
$0.550
|
$0.450
|
$0.470
|
$0.450
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
27,475.000
|
$0.270
|
$0.050
|
$0.050
|
$0.300
|
$0.050
|
$0.050
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
2,724.000
|
$0.340
|
$0.100
|
$0.100
|
$0.400
|
$0.100
|
$0.100
|
$0.100
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
1,576.000
|
$0.510
|
$0.150
|
$0.150
|
$1.000
|
$0.150
|
$0.160
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (RPM)
|
EA
|
181.000
|
$0.410
|
$0.250
|
$0.250
|
$2.500
|
$0.250
|
$0.260
|
$0.250
|
|
|
ANTI-GRAFFITI COATING (PERMNENT-TY II)
|
SF
|
20,107.000
|
$2.260
|
$0.970
|
$0.850
|
$1.000
|
$0.850
|
$1.010
|
$0.970
|
|
|
WIDE FLANGE PAVEMENT TERMINALS
|
LF
|
38.000
|
$700.000
|
$1,716.580
|
$730.890
|
$967.680
|
$50.000
|
$1,048.750
|
$554.190
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
10.000
|
$5,500.000
|
$5,060.000
|
$5,000.000
|
$10,000.000
|
$18,375.290
|
$5,228.180
|
$5,000.000
|
|
Totals: |
$66,832,713.241
|
$69,849,999.485
|
$73,054,631.800
|
$77,234,904.660
|
$80,299,234.023
|
$85,984,574.030
|
$104,119,421.068
|