REMOVING CONC (CURB AND GUTTER)
|
LF
|
570.000
|
$10.000
|
$10.000
|
$5.500
|
|
|
REMOVING CONCRETE(MOW STRIP)
|
LF
|
2,375.000
|
$6.500
|
$5.000
|
$11.000
|
|
|
BACKFILL (TY A)
|
STA
|
1,339.730
|
$150.000
|
$96.000
|
$100.000
|
|
|
ASPH (AC-15P)
|
GAL
|
102,715.000
|
$3.000
|
$3.400
|
$2.750
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
2,792.000
|
$80.000
|
$92.000
|
$75.000
|
|
|
D-GR HMA (SQ) TY-D PG 70-22(LEVEL-UP)
|
TON
|
2,953.000
|
$100.000
|
$86.000
|
$98.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
36,063.000
|
$32.000
|
$32.000
|
$35.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
25,003.000
|
$2.000
|
$1.600
|
$2.850
|
|
|
PLANE ASPH CONC PAV(0" TO 3")
|
SY
|
8,700.000
|
$2.200
|
$2.400
|
$3.600
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
61,326.000
|
$1.400
|
$1.600
|
$2.350
|
|
|
CL C CONC (RAC-R)
|
CY
|
45.400
|
$1,200.000
|
$960.000
|
$1,000.000
|
|
|
RIPRAP (CONC)(5 IN)
|
CY
|
39.500
|
$425.000
|
$397.000
|
$425.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(12 IN)
|
CY
|
42.000
|
$1,300.000
|
$125.000
|
$135.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
1,903.700
|
$425.000
|
$470.000
|
$525.000
|
|
|
CLEANING AND SEALING EXISTING JOINTS
|
LF
|
422.000
|
$25.000
|
$38.000
|
$38.000
|
|
|
RETROFIT RAIL (TY T631)
|
LF
|
306.000
|
$75.000
|
$70.000
|
$130.000
|
|
|
RETROFIT RAIL (TY SSTR)
|
LF
|
564.000
|
$160.000
|
$190.000
|
$240.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)(EXTEND)
|
LF
|
32.000
|
$490.000
|
$520.000
|
$575.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
27.000
|
$400.000
|
$585.000
|
$640.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
13.000
|
$500.000
|
$600.000
|
$650.000
|
|
|
WINGWALL (PW - 1) (HW=3 FT)
|
EA
|
3.000
|
$10,000.000
|
$9,300.000
|
$9,500.000
|
|
|
WINGWALL (PW - 1) (HW=4 FT)
|
EA
|
6.000
|
$10,000.000
|
$9,700.000
|
$9,800.000
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
6.000
|
$10,000.000
|
$10,800.000
|
$11,000.000
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
1.000
|
$11,000.000
|
$19,200.000
|
$20,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
6.000
|
$9,500.000
|
$11,600.000
|
$12,000.000
|
|
|
SET (TY I)(S= 8 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
8.000
|
$10,500.000
|
$18,000.000
|
$19,000.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
20.000
|
$1,100.000
|
$1,100.000
|
$1,100.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,120,306.930
|
$577,000.000
|
$1,400,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
18.000
|
$5,000.000
|
$2,500.000
|
$3,000.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
2,480.000
|
$2.200
|
$3.500
|
$3.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
2,480.000
|
$0.900
|
$0.750
|
$0.250
|
|
|
ONE-WAY TRAF CONT (FLAGGER CONT)
|
HR
|
750.000
|
$70.000
|
$150.000
|
$84.000
|
|
|
PTB (FRN&INSTL)(SGL SLP)(TY 1) OR (STL)
|
LF
|
450.000
|
$35.000
|
$28.000
|
$40.000
|
|
|
PTB (MOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
4,950.000
|
$6.500
|
$15.000
|
$5.000
|
|
|
PTB (REMOVE)(SGL SLP)(TY 1) OR (STL)
|
LF
|
450.000
|
$9.500
|
$17.000
|
$8.000
|
|
|
CONC CURB & GUTTER (TY I)
|
LF
|
570.000
|
$25.000
|
$8.000
|
$8.500
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
247,105.000
|
$0.200
|
$0.160
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
123,553.000
|
$0.200
|
$0.160
|
$0.300
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
9,118.000
|
$25.000
|
$21.000
|
$24.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
18.000
|
$2,000.000
|
$2,100.000
|
$2,400.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
5.000
|
$1,150.000
|
$1,000.000
|
$1,200.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
200.000
|
$2,500.000
|
$25.000
|
$18.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
120.000
|
$80.000
|
$55.000
|
$53.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
6,306.000
|
$2.800
|
$2.000
|
$2.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
27.000
|
$200.000
|
$200.000
|
$200.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
2.000
|
$250.000
|
$200.000
|
$200.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
51.000
|
$2,500.000
|
$2,100.000
|
$2,600.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
13.000
|
$250.000
|
$200.000
|
$200.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
2.000
|
$10,000.000
|
$8,000.000
|
$8,000.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
24.000
|
$1,500.000
|
$500.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
2.000
|
$1,000.000
|
$200.000
|
$200.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
1.000
|
$500.000
|
$498.000
|
$1,000.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND(BI)
|
EA
|
16.000
|
$100.000
|
$40.000
|
$50.000
|
|
|
REMOVE DELIN & OBJECT MARKER ASSMS
|
EA
|
154.000
|
$10.000
|
$20.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
|
EA
|
25.000
|
$25.000
|
$10.000
|
$50.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
110.000
|
$35.000
|
$10.000
|
$50.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY W
|
EA
|
3,867.000
|
$0.500
|
$1.500
|
$0.600
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
13,498.000
|
$0.500
|
$1.500
|
$0.600
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
78.000
|
$0.420
|
$1.800
|
$0.550
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
8,176.000
|
$1.200
|
$0.900
|
$1.250
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
3,045.000
|
$10.500
|
$6.800
|
$4.250
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
49.000
|
$115.000
|
$90.000
|
$75.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
47.000
|
$135.000
|
$90.000
|
$95.000
|
|
REFL PAV MRK TY II (Y) 4" (BRK)
|
LF
|
29,166.000
|
$0.110
|
$0.120
|
$0.200
|
|
REFL PAV MRK TY II (Y) 4" (SLD)
|
LF
|
43,706.000
|
$0.110
|
$0.120
|
$0.200
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
5,670.000
|
$0.460
|
$0.360
|
$0.380
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
261,918.000
|
$0.420
|
$0.300
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
29,166.000
|
$0.450
|
$0.340
|
$0.380
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
78,457.000
|
$0.420
|
$0.310
|
$0.380
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
2,074.000
|
$2.800
|
$2.600
|
$3.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
680.000
|
$3.750
|
$2.900
|
$3.500
|
|
|
BONDING COURSE
|
GAL
|
85,298.000
|
$2.500
|
$1.500
|
$3.000
|
|
|
SUPERPAVE MIX BMD SP-C SAC-A PG76-22
|
TON
|
71,845.000
|
$78.000
|
$92.000
|
$110.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
4.000
|
$10,000.000
|
$11,000.000
|
$10,000.000
|
|
|
TMA (STATIONARY)
|
EA
|
3.000
|
$35,000.000
|
$32,000.000
|
$17,500.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
18.000
|
$225.000
|
$250.000
|
$200.000
|
|
Totals: |
$12,388,126.210
|
$12,256,476.310
|