|
|
REMOVING CONC (CURB AND GUTTER)
|
LF
|
71.000
|
$8.000
|
$80.000
|
$24.000
|
$11.000
|
$11.800
|
$43.000
|
|
|
REMOVING STAB BASE & ASPH PAV(16")
|
SY
|
360.000
|
$4.000
|
$30.000
|
$28.000
|
$19.000
|
$23.700
|
$23.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
600.000
|
$12.000
|
$30.000
|
$35.000
|
$35.000
|
$23.000
|
$60.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
170.000
|
$15.000
|
$25.000
|
$55.000
|
$31.000
|
$47.000
|
$75.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
1,315.000
|
$0.750
|
$5.000
|
$4.000
|
$4.000
|
$2.000
|
$3.000
|
|
|
BLOCK SODDING
|
SY
|
1,315.000
|
$3.500
|
$4.000
|
$5.000
|
$5.000
|
$4.400
|
$4.000
|
|
|
VEGETATIVE WATERING
|
MG
|
13.200
|
$24.000
|
$100.000
|
$65.000
|
$89.000
|
$65.000
|
$45.000
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
45.000
|
$3.000
|
$10.000
|
$12.000
|
$12.000
|
$11.000
|
$12.000
|
|
|
FL BS (CMP IN PLC)(TY A GR 5)(6")
|
SY
|
60.000
|
$22.000
|
$180.000
|
$68.000
|
$36.000
|
$23.450
|
$88.000
|
|
|
LIME (HYDRATED LIME (SLURRY))
|
TON
|
13.800
|
$170.000
|
$450.000
|
$222.000
|
$240.000
|
$385.000
|
$285.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
89.000
|
$3.000
|
$20.000
|
$85.000
|
$15.000
|
$48.500
|
$71.000
|
|
|
LIME TRT (SUBGRADE)(8")
|
SY
|
960.000
|
$3.000
|
$20.000
|
$38.000
|
$22.000
|
$29.550
|
$26.000
|
|
|
CEM TRT(PLNT MX)(CL L)(TY A)(GR 5)(6")
|
SY
|
89.000
|
$25.000
|
$56.500
|
$52.000
|
$44.000
|
$35.000
|
$60.000
|
|
|
CEM TRT(PLNT MX)(CL M)(TYD)(GR1-2)(12")
|
SY
|
960.000
|
$28.000
|
$50.000
|
$69.000
|
$64.000
|
$48.000
|
$66.000
|
|
|
ASPH (HFRS-2P)
|
GAL
|
25.000
|
$4.000
|
$100.000
|
$27.000
|
$15.000
|
$6.000
|
$162.000
|
|
|
ASPH (RC-250)
|
GAL
|
211.000
|
$4.000
|
$65.000
|
$21.000
|
$8.000
|
$6.000
|
$10.000
|
|
|
AGGR (TY-B GR-5 OR TY-L GR-5)
|
CY
|
7.000
|
$105.000
|
$250.000
|
$345.500
|
$220.000
|
$2,000.000
|
$2,900.000
|
|
|
CONC PVMT (CONT REINF - CRCP) (7")
|
SY
|
89.000
|
$120.000
|
$150.000
|
$272.000
|
$150.000
|
$322.000
|
$416.000
|
|
|
CUT & RESTORING PAV
|
SY
|
27.000
|
$140.000
|
$200.000
|
$174.000
|
$200.000
|
$97.000
|
$275.000
|
|
|
CEMENT STAB BACKFILL (INLET OR MH)
|
CY
|
29.000
|
$65.000
|
$225.000
|
$158.000
|
$68.000
|
$76.000
|
$118.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
80.000
|
$4.000
|
$15.000
|
$33.000
|
$1.000
|
$15.000
|
$22.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (24 IN)
|
LF
|
24.000
|
$225.000
|
$189.000
|
$240.000
|
$230.000
|
$220.000
|
$200.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
26.000
|
$275.000
|
$281.000
|
$840.000
|
$350.000
|
$770.000
|
$700.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (48 IN)
|
LF
|
44.000
|
$400.000
|
$334.000
|
$60.000
|
$410.000
|
$50.000
|
$50.000
|
|
|
CL B CONC (FLUME)
|
CY
|
2.000
|
$750.000
|
$850.000
|
$1,230.000
|
$850.000
|
$1,644.000
|
$4,500.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
48.000
|
$75.000
|
$140.000
|
$149.000
|
$110.000
|
$151.000
|
$150.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
80.000
|
$115.000
|
$175.000
|
$144.000
|
$140.000
|
$142.000
|
$180.000
|
|
|
INLET (COMPL)(PSL)(FG)(4FTX4FT-4FTX4FT)
|
EA
|
1.000
|
$5,250.000
|
$5,500.000
|
$4,832.000
|
$6,000.000
|
$5,850.000
|
$8,000.000
|
|
|
INLET (COMPL)(CURB)(TY 2)(5')
|
EA
|
2.000
|
$5,500.000
|
$6,000.000
|
$4,862.000
|
$6,000.000
|
$6,660.000
|
$8,000.000
|
|
|
ADJUSTING MANHOLES
|
EA
|
1.000
|
$1,250.000
|
$3,500.000
|
$1,431.000
|
$270.000
|
$1,000.000
|
$600.000
|
|
|
ADJUSTING MANHOLES (WATER VALVE BOX)
|
EA
|
1.000
|
$725.000
|
$2,500.000
|
$536.000
|
$270.000
|
$400.000
|
$300.000
|
|
|
REMOV STR (INLET)
|
EA
|
3.000
|
$700.000
|
$750.000
|
$780.000
|
$560.000
|
$1,300.000
|
$1,300.000
|
|
|
REMOV STR (PIPE)
|
LF
|
80.000
|
$15.000
|
$35.000
|
$33.000
|
$34.000
|
$56.000
|
$50.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$35,000.000
|
$40,000.000
|
$60,000.000
|
$104,500.000
|
$100,000.000
|
$100,500.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
4.000
|
$2,500.000
|
$3,000.000
|
$605.000
|
$740.000
|
$4,500.000
|
$10,500.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
264.000
|
$3.750
|
$4.000
|
$5.000
|
$5.000
|
$4.400
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
264.000
|
$1.000
|
$1.000
|
$1.000
|
$1.250
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
193.000
|
$4.250
|
$5.000
|
$6.000
|
$6.250
|
$5.490
|
$5.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
193.000
|
$1.000
|
$1.000
|
$1.000
|
$1.250
|
$1.000
|
$1.000
|
|
|
CONC CURB (TY II)
|
LF
|
27.000
|
$35.000
|
$30.000
|
$65.000
|
$22.000
|
$115.000
|
$68.000
|
|
|
CONC CURB & GUTTER (TY II)
|
LF
|
225.000
|
$20.000
|
$70.000
|
$46.000
|
$43.000
|
$66.600
|
$68.000
|
|
|
CONC SIDEWALKS (5")
|
SY
|
40.000
|
$50.000
|
$125.000
|
$101.000
|
$80.000
|
$338.000
|
$255.000
|
|
|
CURB RAMPS (TY 7)
|
SY
|
55.000
|
$90.000
|
$250.000
|
$460.000
|
$320.000
|
$261.000
|
$467.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
150.000
|
$9.000
|
$7.270
|
$8.000
|
$9.000
|
$7.690
|
$7.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
280.000
|
$22.500
|
$16.260
|
$12.000
|
$20.000
|
$11.000
|
$10.000
|
|
|
CONDT (PVC) (SCH 40) (4")
|
LF
|
90.000
|
$15.000
|
$5.120
|
$15.500
|
$6.250
|
$14.290
|
$13.000
|
|
|
CONDT (PVC) (SCH 40) (4") (BORE)
|
LF
|
265.000
|
$30.000
|
$21.250
|
$19.000
|
$26.000
|
$17.580
|
$16.000
|
|
|
ELEC CONDR (NO.10) INSULATED
|
LF
|
495.000
|
$1.200
|
$1.180
|
$1.000
|
$1.500
|
$1.210
|
$1.100
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
770.000
|
$1.750
|
$1.480
|
$2.000
|
$1.750
|
$1.760
|
$1.600
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
5.000
|
$2.000
|
$1.460
|
$3.000
|
$1.750
|
$2.470
|
$2.250
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$1,000.000
|
$908.000
|
$1,140.000
|
$1,000.000
|
$1,044.000
|
$950.000
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$6,000.000
|
$5,593.000
|
$6,960.000
|
$7,000.000
|
$6,374.000
|
$5,800.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
90.000
|
$30.000
|
$34.000
|
$36.000
|
$42.000
|
$22.250
|
$20.250
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
2.000
|
$650.000
|
$620.000
|
$810.000
|
$760.000
|
$645.000
|
$586.750
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
1.000
|
$850.000
|
$935.000
|
$1,212.000
|
$1,000.000
|
$1,087.000
|
$989.500
|
|
|
RELOCATE SM RD SN SUP&AM TY 10BWG
|
EA
|
2.000
|
$450.000
|
$500.000
|
$516.000
|
$610.000
|
$238.000
|
$216.500
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
1.000
|
$75.000
|
$70.000
|
$232.000
|
$86.000
|
$220.000
|
$200.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
1,395.000
|
$0.700
|
$1.050
|
$1.000
|
$1.250
|
$0.820
|
$0.750
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
36.000
|
$6.000
|
$5.030
|
$6.000
|
$6.250
|
$27.470
|
$25.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
2,650.000
|
$0.700
|
$1.050
|
$1.000
|
$1.250
|
$0.820
|
$0.750
|
|
REFL PAV MRK TY I (W)8"(SLD)(090MIL)
|
LF
|
345.000
|
$1.000
|
$1.800
|
$2.000
|
$2.250
|
$3.050
|
$2.800
|
|
REFL PAV MRK TY I (W)24"(SLD)(090MIL)
|
LF
|
365.000
|
$7.000
|
$7.500
|
$9.000
|
$9.250
|
$5.730
|
$5.200
|
|
REFL PAV MRK TY I (W)(ARROW)(090MIL)
|
EA
|
6.000
|
$125.000
|
$155.000
|
$186.000
|
$190.000
|
$165.000
|
$150.000
|
|
REFL PAV MRK TY I(W)(DBL ARROW)(090MIL)
|
EA
|
3.000
|
$225.000
|
$185.000
|
$222.000
|
$230.000
|
$165.000
|
$150.000
|
|
REFL PAV MRK TY I (W)(WORD)(090MIL)
|
EA
|
5.000
|
$150.000
|
$185.000
|
$222.000
|
$230.000
|
$165.000
|
$150.000
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(090MIL)
|
LF
|
310.000
|
$0.400
|
$0.900
|
$1.000
|
$1.000
|
$1.320
|
$1.200
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(090MIL)
|
LF
|
635.000
|
$0.400
|
$0.900
|
$1.000
|
$1.000
|
$1.320
|
$1.200
|
|
REFL PAV MRKR TY I-C
|
EA
|
24.000
|
$4.000
|
$6.000
|
$7.000
|
$7.500
|
$4.560
|
$4.150
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
38.000
|
$4.000
|
$6.000
|
$7.000
|
$7.500
|
$4.560
|
$4.150
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
480.000
|
$0.400
|
$0.520
|
$0.500
|
$0.750
|
$0.270
|
$0.250
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
70.000
|
$0.800
|
$0.770
|
$1.000
|
$1.000
|
$0.330
|
$0.300
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
90.000
|
$6.000
|
$2.750
|
$3.000
|
$3.500
|
$0.380
|
$0.350
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
3.000
|
$85.000
|
$45.000
|
$54.000
|
$55.000
|
$27.500
|
$25.000
|
|
|
ELIM EXT PAV MRK & MRKS (DBL ARROW)
|
EA
|
2.000
|
$90.000
|
$45.000
|
$54.000
|
$55.000
|
$38.500
|
$35.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
2.000
|
$90.000
|
$45.000
|
$54.000
|
$55.000
|
$27.500
|
$25.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
1.000
|
$35,000.000
|
$27,176.000
|
$25,200.000
|
$34,000.000
|
$23,077.000
|
$21,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$4,000.000
|
$1,714.000
|
$4,200.000
|
$2,000.000
|
$3,846.000
|
$3,500.000
|
|
|
VEH SIG SEC (12")LED(GRN)
|
EA
|
8.000
|
$225.000
|
$158.000
|
$204.000
|
$190.000
|
$187.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(GRN ARW)
|
EA
|
2.000
|
$225.000
|
$158.000
|
$204.000
|
$190.000
|
$187.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$225.000
|
$158.000
|
$204.000
|
$190.000
|
$187.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(YEL ARW)
|
EA
|
4.000
|
$225.000
|
$158.000
|
$204.000
|
$190.000
|
$187.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
8.000
|
$225.000
|
$158.000
|
$204.000
|
$190.000
|
$187.000
|
$170.000
|
|
|
VEH SIG SEC (12")LED(RED ARW)
|
EA
|
2.000
|
$225.000
|
$158.000
|
$204.000
|
$190.000
|
$187.000
|
$170.000
|
|
|
BACKPLATE W/REFL BRDR(3 SEC)ALUM
|
EA
|
8.000
|
$150.000
|
$116.000
|
$120.000
|
$140.000
|
$110.000
|
$100.000
|
|
|
BACKPLATE W/REFL BRDR(4 SEC)ALUM
|
EA
|
2.000
|
$175.000
|
$141.000
|
$120.000
|
$170.000
|
$110.000
|
$100.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
|
LF
|
940.000
|
$1.950
|
$1.810
|
$2.500
|
$2.250
|
$2.200
|
$2.000
|
|
|
TRF SIG CBL (TY A)(14 AWG)(7 CONDR)
|
LF
|
1,095.000
|
$2.200
|
$2.080
|
$3.000
|
$2.500
|
$2.750
|
$2.500
|
|
|
TRF SIG CBL (TY A)(16 AWG)(3 CONDR)
|
LF
|
420.000
|
$1.750
|
$1.170
|
$2.000
|
$1.500
|
$1.540
|
$1.400
|
|
|
INS TRF SIG PL AM(S)1 ARM(32')LUM
|
EA
|
1.000
|
$8,000.000
|
$9,417.000
|
$11,040.000
|
$12,000.000
|
$10,110.000
|
$9,200.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(36')LUM
|
EA
|
1.000
|
$9,000.000
|
$10,144.000
|
$11,880.000
|
$13,000.000
|
$10,880.000
|
$9,900.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(40')LUM
|
EA
|
1.000
|
$10,000.000
|
$10,996.000
|
$12,000.000
|
$14,000.000
|
$10,990.000
|
$10,000.000
|
|
|
INS TRF SIG PL AM(S)1 ARM(48')LUM
|
EA
|
1.000
|
$10,500.000
|
$11,689.000
|
$13,200.000
|
$14,000.000
|
$12,088.000
|
$11,000.000
|
|
|
PED POLE ASSEMBLY
|
EA
|
4.000
|
$1,750.000
|
$1,481.000
|
$654.000
|
$2,000.000
|
$599.000
|
$545.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
7.000
|
$180.000
|
$900.000
|
$774.000
|
$350.000
|
$600.000
|
$1,300.000
|
|
|
SP MIXES SP-C SAC-A PG70-22
|
TON
|
139.000
|
$95.000
|
$225.000
|
$214.000
|
$230.000
|
$227.000
|
$220.000
|
|
|
SP MIXES SP-D PG64-22
|
TON
|
5.000
|
$125.000
|
$900.000
|
$457.000
|
$460.000
|
$2,100.000
|
$1,800.000
|
|
|
BONDING COURSE
|
GAL
|
93.000
|
$3.500
|
$10.000
|
$8.000
|
$3.750
|
$6.000
|
$43.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$3,750.000
|
$10,000.000
|
$3,507.000
|
$2,000.000
|
$4,300.000
|
$7,200.000
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$6,500.000
|
$6,352.000
|
$7,200.000
|
$8,000.000
|
$6,593.000
|
$6,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
50.000
|
$175.000
|
$150.000
|
$180.000
|
$370.000
|
$400.000
|
$400.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
5.000
|
$200.000
|
$150.000
|
$180.000
|
$370.000
|
$800.000
|
$400.000
|
|
|
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
|
EA
|
1.000
|
$3,000.000
|
$3,311.000
|
$3,600.000
|
$4,000.000
|
$3,297.000
|
$3,000.000
|
|
|
VIVDS PROSR SYS
|
EA
|
1.000
|
$7,000.000
|
$4,987.000
|
$6,840.000
|
$6,000.000
|
$6,264.000
|
$5,700.000
|
|
|
VIVDS CAM ASSY VAR LNS
|
EA
|
4.000
|
$1,750.000
|
$1,400.000
|
$1,440.000
|
$2,000.000
|
$1,319.000
|
$1,200.000
|
|
|
VIVDS CABLING
|
LF
|
480.000
|
$2.750
|
$2.710
|
$4.000
|
$3.250
|
$3.300
|
$3.000
|
|
Totals: |
$396,288.300
|
$576,065.380
|
$619,738.100
|
$628,597.550
|
$651,653.860
|
$765,721.300
|