Show Job Controls
Bid Cobra

WASHINGTON ARTESIAN PARK RD (0917-19-062)

Items: 50

County: WASHINGTON
Length: 0.0000 MILES
Highway: ARTESIAN PARK RD
District: BRYAN
Control Number: 0917-19-062
DBE Goal: 0.0%
Project: BR 2023(331)
Guaranty: $16,000.00
Time: 120 WORKING DAYS
Engineer's Estimate: $800,382.90
Date: 04/07/2026 (2 months ago)
Contract Number: 4263029
Type: BRIDGE REPLACEMENT
Project ID: A00189999
Contract Type: Federal
Project Description: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (9)
E
Engineer's Estimate
$800,382.90
$732,054.40
Over/Under Est: -8.54% -$68,328.50
$770,647.10
Over/Under Est: -3.72% -$29,735.80
Amt Left: 5.27% $38,592.70
Over/Under Est: -2.57% -$20,595.54
Amt Left: 6.52% $47,732.96
Delta: -1.19% -$9,140.26
$798,535.81
Over/Under Est: -0.23% -$1,847.09
Amt Left: 9.08% $66,481.41
Delta: -2.40% -$18,748.45
Over/Under Est: 15.85% $126,827.18
Amt Left: 26.66% $195,155.68
Delta: -16.11% -$128,674.27
Over/Under Est: 15.98% $127,924.79
Amt Left: 26.81% $196,253.29
Delta: -0.12% -$1,097.61
Over/Under Est: 16.57% $132,587.20
Amt Left: 27.45% $200,915.70
Delta: -0.50% -$4,662.41
Over/Under Est: 17.63% $141,069.50
Amt Left: 28.6% $209,398.00
Delta: -0.91% -$8,482.30
$1,061,625.11
Over/Under Est: 32.64% $261,242.21
Amt Left: 45.02% $329,570.71
Delta: -12.76% -$120,172.71

Bid Items & Bid Tabulations

50 Total 0 of 50
WASHINGTON  |  ARTESIAN PARK RD  |  BRYAN  |  0917-19-062  |  04/07/2026  |  $800,382.90  |  BR 2023(331)  |  BRIDGE REPL  |  120 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
GARRET SHIELDS INFRASTRUCTURE
SKYLINE BRIDGE LLC
R CONSTRUCTION CIVIL, LLC
TREVWAY, INC.
KNIFE RIVER CORPORATION - SOUTH
E-Z BEL CONSTRUCTION, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
LARRY YOUNG PAVING, INC.
TUCAN CONTRACTING, LLC
PREPARING ROW
STA 2.750 $2,000.000 $5,000.000 $300.000 $4,300.000 $3,000.000 $242.000 $750.000 $5,400.000 $290.000 $2,750.000
PREP ROW (TREE REMOVE) (0"-12" DIA)
EA 6.000 $700.000 $500.000 $424.000 $800.000 $300.000 $445.000 $950.000 $850.000 $530.000 $1,100.000
TREE PROTECTION (INSTALL)
EA 2.000 $600.000 $100.000 $500.000 $300.000 $743.490 $2,702.000 $750.000 $1,500.000 $870.000 $550.000
TREE PROTECTION (REMOVE)
EA 2.000 $175.000 $100.000 $100.000 $100.000 $200.000 $1,021.000 $300.000 $500.000 $330.000 $110.000
RMV (6"-10") TRT/UNTRT BASE & ASPH PAV
SY 475.000 $10.000 $20.000 $9.000 $10.000 $9.000 $5.000 $8.880 $12.000 $11.000 $33.000
EXCAV (ROADWAY)
CY 70.000 $30.000 $30.000 $28.000 $74.000 $42.480 $16.000 $22.860 $25.000 $56.000 $88.000
EXCAV (CHANNEL)
CY 510.000 $30.000 $30.000 $15.000 $27.000 $9.000 $8.000 $13.610 $12.000 $35.000 $66.000
EMBANK (FNL)(DC)(TY C)
CY 153.000 $30.000 $30.000 $35.000 $37.000 $50.000 $12.000 $17.140 $35.000 $24.000 $55.000
FURN & PLACE TOPSOIL (4")
SY 902.000 $5.000 $4.000 $3.550 $9.000 $5.000 $3.500 $1.650 $4.000 $5.250 $3.740
BOND FBR MTRX SEED (TEMP)(WARM)
SY 451.000 $1.250 $0.300 $1.900 $4.250 $3.000 $1.600 $1.500 $2.000 $2.000 $1.980
BOND FBR MTRX SEED (TEMP)(COOL)
SY 451.000 $1.250 $0.300 $1.900 $4.250 $3.000 $1.600 $1.500 $2.000 $2.000 $1.980
BOND FBR MTRX SEED (PERM)(RURAL)(CLAY)
SY 902.000 $2.000 $0.400 $2.750 $3.100 $3.000 $2.000 $1.750 $3.000 $2.250 $2.860
VEGETATIVE WATERING
TGL 9.000 $270.000 $100.000 $1.000 $250.000 $300.000 $56.000 $113.110 $1.000 $140.000 $120.640
FL BS (CMP IN PLC)(TY A GR 1-2) (8")
SY 709.000 $35.000 $25.000 $40.000 $19.000 $40.200 $36.000 $44.940 $45.000 $62.000 $66.000
ASPH (RC-250)
GAL 177.000 $10.000 $8.000 $40.000 $9.000 $50.000 $25.000 $27.000 $15.000 $15.000 $8.250
AGGR (TY-B OR L, GR-5)
CY 5.000 $170.000 $1,000.000 $2,500.000 $1,350.000 $1,642.000 $627.000 $2,300.000 $2,000.000 $800.000 $403.430
SP MIXES SP-C SAC-A PG64-22
TON 78.000 $200.000 $230.000 $450.000 $425.000 $511.580 $209.000 $352.880 $300.000 $500.000 $156.480
CEM STABIL BKFL
CY 128.000 $220.000 $200.000 $265.000 $88.000 $120.000 $224.000 $235.140 $250.000 $140.000 $220.000
TEMPORARY SPL SHORING
SF 557.000 $38.000 $60.000 $27.000 $87.000 $91.000 $82.000 $24.000 $72.000 $69.000 $27.500
DRILL SHAFT (36 IN)
LF 200.000 $365.000 $300.000 $278.000 $380.000 $376.000 $347.000 $350.410 $300.000 $350.000 $363.000
CL C CONC (ABUT)
CY 47.600 $1,440.000 $1,000.000 $915.000 $650.000 $777.000 $1,718.000 $2,082.410 $1,600.000 $1,600.000 $2,200.000
REINF CONC SLAB
SF 2,700.000 $30.000 $25.000 $28.000 $27.000 $22.000 $53.000 $46.330 $48.000 $36.000 $38.500
PRESTR CONC GIRDER (TX28)
LF 447.020 $270.000 $250.000 $310.000 $193.000 $238.000 $279.000 $333.300 $255.000 $370.000 $330.000
RIPRAP (MOW STRIP)(4 IN)
CY 13.000 $700.000 $600.000 $720.000 $531.000 $500.000 $817.000 $756.290 $650.000 $690.000 $825.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 493.000 $170.000 $150.000 $158.000 $210.000 $190.000 $135.000 $302.640 $200.000 $170.000 $242.000
RAIL (TY T223)
LF 198.000 $154.000 $100.000 $105.000 $200.000 $86.590 $172.000 $198.060 $200.000 $230.000 $220.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 71.000 $230.000 $180.000 $225.000 $190.000 $256.000 $247.000 $434.800 $250.000 $110.000 $275.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $25,000.000 $10,000.000 $17,000.000 $12,500.000 $20,000.000 $8,014.000 $16,550.000 $20,000.000 $12,000.000 $55,000.000
MOBILIZATION
LS 1.000 $80,000.000 $50,000.000 $65,000.000 $27,000.000 $80,000.000 $149,125.000 $27,791.000 $80,000.000 $95,000.000 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $2,500.000 $5,000.000 $1,600.000 $6,500.000 $1,010.000 $1,420.000 $598.000 $4,500.000 $3,100.000 $2,200.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $45.000 $30.000 $45.250 $80.000 $22.000 $55.000 $50.000 $1.000 $67.000 $52.480
ROCK FILTER DAMS (REMOVE)
LF 50.000 $11.000 $10.000 $10.500 $1.750 $2.000 $11.000 $10.000 $1.000 $13.000 $17.190
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $35.000 $25.000 $10.000 $29.000 $9.000 $40.000 $36.000 $1.000 $48.000 $38.940
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $15.000 $10.000 $1.000 $10.000 $1.000 $13.000 $12.000 $1.000 $16.000 $18.410
TEMP SEDMT CONT FENCE (INSTALL)
LF 794.000 $5.000 $5.000 $4.000 $1.800 $3.000 $5.000 $4.500 $1.000 $6.000 $5.170
TEMP SEDMT CONT FENCE (REMOVE)
LF 794.000 $2.000 $1.000 $1.500 $0.650 $1.000 $1.000 $1.000 $1.000 $1.250 $1.760
CONSTRUCTING DETOURS
SY 80.000 $80.000 $100.000 $60.000 $250.000 $150.000 $82.000 $38.040 $200.000 $180.000 $198.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 60.000 $50.000 $180.000 $135.000 $100.000 $110.000 $33.000 $19.580 $50.000 $15.000 $90.200
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $50.000 $140.000 $120.000 $97.000 $99.000 $54.000 $25.210 $50.000 $15.000 $82.500
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 40.000 $20.000 $60.000 $26.000 $11.000 $37.170 $9.000 $5.670 $20.000 $6.000 $19.800
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 60.000 $15.000 $40.000 $50.000 $5.000 $129.000 $28.000 $19.580 $50.000 $15.000 $15.400
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $15.000 $30.000 $50.000 $5.000 $120.000 $21.000 $25.210 $50.000 $15.000 $15.400
DRIVEWAYS (ACP)
SY 104.000 $55.000 $120.000 $150.000 $165.000 $100.000 $102.000 $161.410 $95.000 $45.000 $70.640
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $29.000 $30.000 $30.000 $29.000 $42.000 $30.000 $37.640 $30.000 $37.000 $41.400
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,350.000 $1,000.000 $1,300.000 $1,450.000 $1,277.430 $1,500.000 $1,397.000 $1,500.000 $1,800.000 $1,536.700
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,380.000 $1,500.000 $1,500.000 $1,600.000 $1,880.330 $1,667.000 $1,580.000 $1,500.000 $2,000.000 $1,738.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,200.000 $3,500.000 $4,135.000 $3,500.000 $3,901.000 $3,661.000 $3,547.000 $3,500.000 $4,400.000 $3,901.700
INSTL DEL ASSM (D-SW)SZ 1(BRF)CTB (BI)
EA 6.000 $50.000 $10.000 $20.000 $27.000 $6.320 $28.000 $36.060 $20.000 $33.000 $31.900
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $75.000 $25.000 $27.000 $35.000 $13.900 $39.000 $29.000 $25.000 $43.000 $31.900
BONDING COURSE
GAL 71.000 $6.000 $5.000 $30.000 $7.000 $8.210 $20.000 $5.000 $10.000 $6.000 $6.070
Totals: $800,382.900 $732,054.400 $770,647.100 $779,787.360 $798,535.810 $927,210.080 $928,307.682 $932,970.100 $941,452.400 $1,061,625.110
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $45,000.00
Total: $50,000.00