WASHINGTON BS 36J (0187-01-047)

Items: 86

County: WASHINGTON
Length: 1.7140 MILES
Highway: BS 36J
District: BRYAN
Control Number: 0187-01-047
DBE Goal: 500.0%
Project: F 2B25(052)
Guaranty: $48,000.00
Time: 225 WORKING DAYS
Engineer's Estimate: $2,187,752.20
Date: 09/05/2025 (9 months ago)
Contract Number: 9253225
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Project ID: A00132768
Contract Type: Federal
Project Description: PEDESTRIAN, SIDEWALKS AND CURB RAMPS
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
JAMES KREAMER
RENE PEQUENO
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (6)
E
Engineer's Estimate
$2,187,752.20
$2,318,045.68
Over/Under Est: 5.96% $130,293.48
Over/Under Est: 23.1% $505,277.80
Amt Left: 16.18% $374,984.32
Over/Under Est: 27.84% $609,064.05
Amt Left: 20.65% $478,770.57
Delta: -3.85% -$103,786.25
$2,812,216.93
Over/Under Est: 28.54% $624,464.73
Amt Left: 21.32% $494,171.25
Delta: -0.55% -$15,400.68
Over/Under Est: 29.21% $639,019.80
Amt Left: 21.95% $508,726.32
Delta: -0.52% -$14,555.07
Over/Under Est: 82.04% $1,794,913.50
Amt Left: 71.81% $1,664,620.02
Delta: -40.89% -$1,155,893.70
Subcontractor Percentage Amount
GP7 CONSTRUCTION INC. 27.02% $626,335.94
TRP CONSTRUCTION GROUP, LLC 6.36% $147,427.71
J.KRU LAND SERVICES, LLC 2.36% $54,705.88
AVILES CONSTRUCTION SERVICE, INC 1.48% $34,307.08
CURB PLANET INC. 1.27% $29,439.18
Total: 38.49% $892,215.79

Bid Items & Bid Tabulations

86 Total 0 of 86
WASHINGTON  |  BS 36J  |  BRYAN  |  0187-01-047  |  09/05/2025  |  $2,187,752.20  |  F 2B25(052)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  225 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JFO SERVICES, LLC
GARRET SHIELDS INFRASTRUCTURE
LARRY YOUNG PAVING, INC.
TI-ZACK CONCRETE, LLC
TEXAS STEEL INDUSTRIAL PLACING, LLC
KNIFE RIVER CORPORATION - SOUTH
PREPARING ROW
AC 1.000 $1.000 $5,939.860 $5,000.000 $8,900.000 $11,000.000 $5,000.000 $14,700.000
PREPARING ROW
STA 88.380 $350.000 $610.920 $500.000 $850.000 $495.000 $500.000 $1,776.000
TREE PROTECTION (INSTALL)
EA 11.000 $250.000 $653.380 $200.000 $890.000 $1.100 $500.000 $770.000
TREE PROTECTION (REMOVE)
EA 11.000 $130.000 $178.200 $1.000 $210.000 $165.000 $200.000 $195.000
REMOV CONC (RIPRAP)
SY 55.000 $35.000 $30.230 $40.000 $17.000 $29.020 $50.000 $100.000
REMOV CONC (DRIVEWAYS)
SY 2,880.000 $17.000 $15.340 $40.000 $16.000 $27.710 $25.000 $20.580
REMOV CONC (SIDEWALK, RAMP OR SUP)
SY 191.000 $17.000 $26.540 $40.000 $16.000 $41.780 $25.000 $112.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 4,452.000 $12.000 $8.960 $20.000 $11.000 $12.550 $13.000 $48.500
REMOV CONC (WINGWALL)
CY 2.100 $450.000 $1,260.820 $1,000.000 $1,250.000 $760.000 $1,000.000 $360.000
RMV (0"-12") TRT/UNTRT BASE & ASPH PAV
SY 268.000 $20.000 $32.440 $20.000 $8.000 $29.780 $40.000 $12.510
EXCAV (ROADWAY)
CY 647.000 $21.000 $43.620 $40.000 $33.000 $98.670 $30.000 $30.820
EMBANK (FNL)(DC)(TY C)
CY 210.000 $50.000 $85.380 $40.000 $78.000 $93.500 $45.000 $28.000
FURN & PLACE TOPSOIL (4")
SY 3,430.000 $3.500 $5.940 $5.000 $2.750 $4.650 $6.000 $16.700
BLOCK SODDING
SY 3,430.000 $7.500 $6.530 $12.000 $8.000 $8.800 $6.000 $6.770
VEGETATIVE WATERING
TGL 34.300 $70.000 $378.400 $100.000 $95.000 $1.100 $100.000 $61.000
FL BS (CMP IN PLC)(TY A GR 1-2) (6")
SY 1,934.000 $25.000 $19.010 $12.000 $45.000 $19.670 $40.000 $47.930
PRIME COAT (MC-30)
GAL 387.000 $9.000 $4.160 $10.000 $13.000 $5.500 $20.000 $95.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 171.000 $160.000 $202.450 $200.000 $300.000 $385.000 $240.000 $445.000
D-GR HMA TY-D PG70-22 (EXEMPT)
TON 371.000 $160.000 $202.470 $200.000 $270.000 $385.000 $240.000 $373.000
TACK COAT
GAL 322.000 $6.000 $4.160 $10.000 $13.000 $11.000 $20.000 $4.500
PLANE ASPH CONC PAV(0" TO 8")
SY 3,856.000 $10.000 $17.820 $7.000 $6.000 $11.000 $10.000 $32.350
CL C CONC (MISC)
CY 14.200 $1,000.000 $1,002.790 $1,000.000 $1,800.000 $774.520 $1,000.000 $3,382.000
RIPRAP (CONC)(4 IN)
CY 13.600 $890.000 $785.850 $600.000 $710.000 $774.520 $900.000 $1,143.000
RAIL (HANDRAIL)(TY A)
LF 3.000 $280.000 $935.820 $600.000 $750.000 $715.000 $500.000 $1,577.000
RAIL (HANDRAIL)(TY B)
LF 126.000 $130.000 $131.430 $150.000 $130.000 $220.000 $250.000 $224.000
CONC BOX CULV (6 FT X 3 FT)
LF 8.000 $680.000 $1,305.250 $800.000 $960.000 $1,100.000 $2,000.000 $1,459.000
INLET (COMPL)(ARMOR CURB SLOT)
EA 5.000 $1,500.000 $2,428.390 $5,000.000 $3,200.000 $1,361.460 $10,000.000 $7,055.000
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $20,000.000 $12,560.980 $5,000.000 $15,000.000 $13,750.000 $25,000.000 $13,600.000
GRATE & FRAME
EA 38.000 $3,500.000 $983.810 $2,000.000 $1,300.000 $1,124.000 $1,400.000 $1,110.000
ADJUSTING MANHOLES
EA 4.000 $2,000.000 $1,815.700 $1,000.000 $710.000 $1,995.000 $1,350.000 $1,560.000
ADJUSTING MANHOLES (UTILITY BOX)
EA 36.000 $1,000.000 $1,815.700 $1,000.000 $160.000 $221.670 $1,000.000 $1,050.000
PIPE (PVC) (SCH 80) (6 IN)
LF 20.000 $178.000 $102.240 $50.000 $35.000 $38.500 $75.000 $460.000
REMOV STR (PIPE)
LF 18.000 $40.000 $28.740 $40.000 $7.250 $16.500 $30.000 $18.000
REMOVE STR (BOLLARD)
EA 2.000 $350.000 $388.670 $100.000 $230.000 $165.000 $250.000 $140.000
REMOV STR (SMALL)
EA 1.000 $300.000 $1,003.050 $1,000.000 $1,250.000 $165.000 $2,500.000 $300.000
MOBILIZATION
LS 1.000 $160,000.000 $229,965.850 $200,000.000 $270,000.000 $285,443.930 $285,000.000 $376,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 15.000 $3,500.000 $2,375.940 $5,000.000 $5,950.000 $3,850.000 $2,000.000 $5,310.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,500.000 $17,819.580 $1,000.000 $12,000.000 $1,100.000 $18,000.000 $8,800.000
TMA (STATIONARY)
DAY 221.000 $260.000 $205.910 $400.000 $270.000 $2.200 $150.000 $280.000
TMA (MOBILE OPERATION)
DAY 4.000 $350.000 $592.000 $400.000 $980.000 $1.100 $1.000 $700.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 14.000 $45.000 $89.100 $20.000 $82.000 $1.100 $60.000 $70.600
ROCK FILTER DAMS (REMOVE)
LF 14.000 $13.000 $71.280 $10.000 $27.000 $1.100 $20.000 $23.500
SANDBAGS FOR EROSION CONTROL
EA 225.000 $13.000 $9.500 $5.000 $34.000 $1.100 $1.000 $29.400
TEMP SEDMT CONT FENCE (INSTALL)
LF 250.000 $4.000 $4.160 $5.000 $7.500 $1.100 $5.000 $6.470
TEMP SEDMT CONT FENCE (REMOVE)
LF 250.000 $1.000 $2.380 $1.000 $2.000 $1.100 $2.000 $1.800
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 850.000 $6.000 $8.320 $6.000 $7.500 $1.100 $8.000 $6.470
BIODEG EROSN CONT LOGS (REMOVE)
LF 850.000 $1.400 $2.380 $1.000 $1.250 $1.100 $2.000 $1.150
COLORED TEXTURED CONC (4")
SY 64.000 $120.000 $172.490 $120.000 $120.000 $247.990 $250.000 $308.500
LANDSCAPE PAVERS
SY 8.000 $130.000 $296.990 $150.000 $125.000 $137.500 $100.000 $611.000
REMOVE AND RELAY PAVERS
SY 39.000 $78.000 $356.390 $150.000 $73.000 $137.500 $200.000 $290.000
CONC CURB (TY I)
LF 38.000 $20.000 $9.780 $40.000 $3.500 $63.760 $50.000 $33.300
CONC CURB (TY II)
LF 1,092.000 $30.000 $11.280 $40.000 $3.500 $58.240 $50.000 $67.000
CONC CURB & GUTTER (TY I)
LF 61.000 $40.000 $24.850 $50.000 $38.000 $58.240 $50.000 $113.000
CONC CURB & GUTTER (TY II)
LF 3,751.000 $45.000 $24.210 $40.000 $38.000 $58.240 $55.000 $66.400
CONC CURB & GUTTER (ARMOR CURB)
LF 28.000 $230.000 $586.570 $50.000 $230.000 $357.140 $250.000 $953.500
DRIVEWAYS (CONC)
SY 3,029.000 $95.000 $98.740 $120.000 $140.000 $123.640 $110.000 $167.500
DRIVEWAYS (ACP)
SY 189.000 $110.000 $193.340 $120.000 $120.000 $137.500 $100.000 $460.000
CONC SIDEWALKS (4")
SY 2,732.000 $80.000 $81.120 $90.000 $80.000 $98.920 $95.000 $132.530
CONC SIDEWALK (STEPS)
SY 2.000 $300.000 $3,907.950 $200.000 $430.000 $183.540 $2,000.000 $3,730.000
CURB RAMPS (TY 1)
SY 81.000 $350.000 $301.490 $500.000 $200.000 $134.000 $185.000 $174.000
CURB RAMPS (TY 2)
SY 79.000 $200.000 $194.520 $500.000 $200.000 $134.000 $185.000 $115.000
CURB RAMPS (TY 3)
SY 193.000 $158.000 $229.040 $500.000 $200.000 $134.000 $185.000 $133.000
CURB RAMPS (TY 5)
SY 41.000 $300.000 $299.020 $500.000 $200.000 $134.000 $185.000 $173.000
CURB RAMPS (TY 6)
SY 170.000 $165.000 $254.190 $500.000 $210.000 $134.000 $185.000 $168.000
CURB RAMPS (TY 7)
SY 113.000 $250.000 $307.730 $500.000 $200.000 $134.000 $185.000 $217.000
CURB RAMPS (TY 10)
SY 67.000 $220.000 $221.640 $500.000 $210.000 $134.000 $185.000 $265.000
CURB RAMPS (TY 20)
SY 20.000 $165.000 $201.080 $500.000 $210.000 $134.000 $185.000 $327.000
CONC SIDEWALKS (SPECIAL)
SY 1,691.000 $145.000 $157.610 $150.000 $330.000 $301.950 $300.000 $305.500
RELOCATE EXISTING MAILBOX
EA 18.000 $275.000 $219.770 $500.000 $250.000 $137.500 $300.000 $589.000
GROUND BOX TY D (162922)
EA 3.000 $1,500.000 $1,484.960 $2,000.000 $1,600.000 $1,375.000 $2,000.000 $2,064.000
GROUND BOX TY D (162922)W/APRON
EA 1.000 $1,600.000 $1,484.960 $2,000.000 $1,800.000 $2,035.000 $2,000.000 $2,305.000
REMOVE GROUND BOX
EA 4.000 $300.000 $356.390 $500.000 $420.000 $550.000 $1,000.000 $650.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 26.000 $800.000 $831.580 $800.000 $960.000 $550.000 $300.000 $903.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 28.000 $740.000 $457.370 $500.000 $530.000 $550.000 $300.000 $530.000
REMOVE SM RD SN SUP&AM
EA 2.000 $110.000 $130.680 $100.000 $150.000 $55.000 $100.000 $120.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,236.000 $10.000 $14.260 $15.000 $13.000 $13.200 $16.500 $14.120
RE PM TY II (W) 4" (SLD)
LF 112.000 $2.000 $1.780 $3.000 $4.000 $2.200 $1.000 $2.350
PAVEMENT SLER 4"
LF 112.000 $0.600 $0.140 $2.000 $0.750 $1.100 $5.000 $1.200
PAVEMENT SLER 24"
LF 1,236.000 $2.000 $0.860 $2.000 $5.500 $2.200 $5.000 $2.350
ELIM EXT PM & MRKS (4")
LF 70.000 $1.000 $4.750 $2.000 $1.250 $33.000 $25.000 $36.000
ELIM EXT PM & MRKS (8")
LF 14.000 $1.000 $5.940 $5.000 $2.750 $55.000 $25.000 $59.000
ELIM EXT PM & MRKS (24")
LF 91.000 $5.000 $11.880 $4.000 $6.750 $82.500 $13.000 $89.000
PAV SURF PREP FOR MRK (4")
LF 112.000 $1.000 $0.050 $1.000 $0.250 $0.280 $1.000 $0.300
PAV SURF PREP FOR MRK (24")
LF 1,236.000 $3.000 $0.290 $1.000 $0.750 $0.550 $1.000 $0.600
PED DETECT PUSH BUTTON (STANDARD)
EA 8.000 $750.000 $1,781.960 $1,500.000 $500.000 $825.000 $1,500.000 $870.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 8.000 $65.000 $1,781.960 $1,500.000 $120.000 $550.000 $100.000 $110.000
Totals: $2,187,752.200 $2,318,045.680 $2,693,030.000 $2,796,816.250 $2,812,216.936 $2,826,772.000 $3,982,665.700
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
RAILROAD FORCE ACCOUNT WORK (PART) $21,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $48,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $3,000.00
RAILROAD FLAGGING: RAILROAD FORCE ACCOUNT WORK (PART) $12,500.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $1,000.00
Total: $85,500.00