WASHINGTON BS 36-J (0186-05-044)

Items: 107

County: WASHINGTON
Length: N/A
Highway: BS 36-J
District: BRYAN
Control Number: 0186-05-044
DBE Goal: N/A
Project: F 2B23(031)
Guaranty: N/A
Time: 111 WORKING DAYS
Engineer's Estimate: $1,489,111.00
Date: 08/02/2023 (2 years ago)
Contract Number: N/A
Type: CONSTRUCT PEDESTRIAN INFRASTRUCTURE
Mail/Deliver Bids To: N/A
JAMES KREAMER
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$1,489,111.00
$1,547,419.83
Over/Under Est: 3.92% $58,308.83
$1,828,671.25
Over/Under Est: 22.8% $339,560.25
Amt Left: 18.18% $281,251.42
Over/Under Est: 25.18% $374,927.20
Amt Left: 20.46% $316,618.37
Delta: -1.93% -$35,366.95
Subcontractor Percentage Amount
KNIFE RIVER CORPORATION - SOUTH 8.08% $120,302.28
TRAFFIC SIGNS & LINES, LLC 2.90% $43,177.80
PBJ CONSTRUCTION 1.58% $23,524.46
ROBIN STEEL LLC 0.53% $7,891.12
BAYER CONSTRUCTION ELECTRICAL CONTRACTORS, INC. 0.14% $2,084.45
Total: 13.23% $196,980.11

Bid Items & Bid Tabulations

107 Total 0 of 107
WASHINGTON  |  BS 36-J  |  BRYAN  |  0186-05-044  |  08/02/2023  |  $1,489,111.00  |  F 2B23(031)  |  CONSTRUCT PEDESTRIAN INFRASTRUCT  |  111 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TI-ZACK CONCRETE, INC.
ENCINO LANDSCAPE, INC.
TEXAS MATERIALS GROUP, INC.
PREPARING ROW
STA 40.850 $1,100.000 $605.000 $1,000.000 $600.000
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 4.000 $1,500.000 $495.000 $1,000.000 $1,500.000
REMOVING CONC (RIPRAP)
SY 112.000 $100.000 $33.590 $40.000 $40.000
REMOVING CONC (SIDEWALKS)
SY 172.000 $60.000 $21.870 $40.000 $55.000
REMOVING CONC (DRIVEWAYS)
SY 975.000 $35.000 $23.150 $40.000 $45.000
REMOVING CONC (CURB OR CURB & GUTTER)
LF 3,396.000 $10.000 $11.080 $40.000 $10.000
REMOVING CONC (PAVERS)
SY 21.000 $20.000 $35.830 $40.000 $75.000
REMOVING STAB BASE AND ASPH PAV(0"-16")
SY 539.000 $10.000 $27.920 $40.000 $45.000
OBLITERATING ABANDONED ROAD
SY 68.000 $20.000 $33.190 $40.000 $47.000
EXCAVATION (ROADWAY)
CY 349.000 $20.000 $64.680 $40.000 $100.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 310.000 $20.000 $72.810 $40.000 $95.000
FURNISHING AND PLACING TOPSOIL (4")
SY 2,571.000 $3.000 $8.170 $20.000 $8.000
BLOCK SODDING
SY 2,571.000 $6.000 $6.600 $4.000 $7.000
VEGETATIVE WATERING
MG 25.800 $25.000 $1.100 $10.000 $54.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 1,049.000 $100.000 $18.800 $60.000 $52.000
PRIME COAT (MULTI OPTION)
GAL 213.000 $10.000 $11.000 $10.000 $60.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(10")
SY 165.000 $100.000 $115.500 $150.000 $135.000
PLANE ASPH CONC PAV(0" TO 8")
SY 2,094.000 $15.000 $13.200 $8.000 $17.000
CL C CONC (MISC)
CY 6.700 $1,000.000 $1,218.530 $2,500.000 $2,300.000
CL A CONC (STEPS)
CY 1.700 $1,500.000 $1,218.530 $2,500.000 $3,300.000
RIPRAP (CONC)(4 IN)
CY 5.300 $1,000.000 $1,218.530 $800.000 $1,300.000
RAIL (HANDRAIL)(TY A)
LF 30.000 $200.000 $280.500 $200.000 $200.000
INLET (CURB)(SPL)
EA 1.000 $3,000.000 $24,461.850 $4,800.000 $13,500.000
GRATE & FRAME
EA 30.000 $2,000.000 $2,972.380 $1,500.000 $2,600.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 5.000 $1,500.000 $752.400 $500.000 $900.000
ADJUSTING MANHOLES (WATER METER)
EA 4.000 $1,500.000 $940.500 $500.000 $800.000
MOBILIZATION
LS 1.000 $124,000.000 $151,300.050 $180,000.000 $180,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $5,000.000 $1,650.000 $10,000.000 $4,700.000
SANDBAGS FOR EROSION CONTROL
EA 90.000 $10.000 $1.100 $1.000 $35.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 100.000 $5.000 $1.100 $2.000 $9.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 100.000 $2.000 $1.100 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 300.000 $7.000 $1.100 $1.000 $8.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $2.000 $1.100 $1.000 $1.000
CONSTRUCTING DETOURS
SY 10.000 $500.000 $55.000 $200.000 $300.000
COLORED TEXTURED CONC (4")
SY 149.000 $120.000 $197.050 $200.000 $95.000
CONC CURB (TY II)
LF 455.000 $35.000 $48.060 $35.000 $60.000
CONC CURB & GUTTER (TY II)
LF 2,825.000 $35.000 $48.060 $45.000 $38.000
CONC CURB & GUTTER (ARMOR CURB)
LF 42.000 $300.000 $473.060 $500.000 $400.000
DRIVEWAYS (CONC)
SY 1,219.000 $100.000 $105.390 $120.000 $150.000
DRIVEWAYS (ACP)
SY 32.000 $75.000 $110.000 $120.000 $170.000
CONC SIDEWALKS (4")
SY 1,679.000 $80.000 $80.020 $100.000 $105.000
CURB RAMPS (TY 1)
SY 18.000 $165.000 $148.690 $180.000 $355.000
CURB RAMPS (TY 2)
SY 14.000 $165.000 $148.690 $180.000 $500.000
CURB RAMPS (TY 3)
SY 142.000 $165.000 $148.690 $180.000 $220.000
CURB RAMPS (TY 6)
SY 20.000 $165.000 $148.690 $180.000 $450.000
CURB RAMPS (TY 7)
SY 101.000 $165.000 $148.690 $180.000 $280.000
CURB RAMPS (TY 10)
SY 12.000 $165.000 $148.690 $180.000 $430.000
CURB RAMPS (TY 21)
SY 53.000 $165.000 $148.690 $180.000 $430.000
CONC SIDEWALKS (SPECIAL) (TYPE B)
SY 759.000 $200.000 $236.230 $211.000 $185.000
CONC MEDIAN
SY 481.000 $120.000 $210.820 $200.000 $155.000
PIPE UNDERDRAINS (TY 6) (6")
LF 399.000 $20.000 $38.500 $40.000 $65.000
MAILBOX INSTALL-S (WC-POST) TY 3
EA 8.000 $275.000 $214.500 $300.000 $240.000
MAILBOX INSTALL-D (WC-POST) TY 3
EA 1.000 $300.000 $258.500 $400.000 $290.000
GROUND BOX TY D (162922)
EA 2.000 $1,200.000 $2,090.000 $1,000.000 $1,700.000
REMOVE GROUND BOX
EA 2.000 $600.000 $165.000 $400.000 $490.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 9.000 $750.000 $763.400 $750.000 $850.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 4.000 $600.000 $740.300 $750.000 $830.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 40.000 $10.000 $38.500 $10.000 $45.000
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 63.000 $2.000 $2.750 $2.000 $3.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 295.000 $2.000 $2.200 $2.000 $3.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 249.000 $4.000 $3.300 $5.000 $3.700
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 679.000 $12.000 $7.150 $9.000 $8.000
REFL PAV MRK TY I (Y)6"(DOT)(100MIL)
LF 30.000 $1.000 $3.580 $2.000 $4.000
REFL PAV MRK TY I (Y)12"(SLD)(100MIL)
LF 120.000 $4.000 $2.750 $6.000 $3.000
REFL PAV MRK TY I(Y)(MED NOSE)(100MIL)
EA 1.000 $600.000 $275.000 $400.000 $300.000
REFL PAV MRK TY II (W) 4" (SLD)
LF 39.000 $1.000 $2.200 $1.000 $2.500
REFL PAV MRK TY II (W) 6" (SLD)
LF 603.000 $1.000 $1.270 $1.000 $1.500
REFL PAV MRK TY II (Y) 6" (SLD)
LF 968.000 $1.000 $1.320 $1.000 $1.500
PAVEMENT SEALER 4"
LF 39.000 $1.000 $0.060 $0.250 $0.050
PAVEMENT SEALER 6"
LF 1,601.000 $1.000 $0.100 $0.500 $0.100
PAVEMENT SEALER 8"
LF 358.000 $1.000 $0.130 $1.000 $0.150
PAVEMENT SEALER 12"
LF 369.000 $1.000 $0.200 $1.000 $0.250
PAVEMENT SEALER 24"
LF 679.000 $2.000 $0.400 $2.000 $0.450
PAVEMENT SEALER (ARROW)
EA 9.000 $50.000 $9.900 $40.000 $11.000
PAVEMENT SEALER (WORD)
EA 6.000 $100.000 $9.900 $40.000 $11.000
PAVEMENT SEALER (MED NOSE)
EA 1.000 $500.000 $16.500 $100.000 $18.000
PAVEMENT SEALER (DBL ARROW)
EA 2.000 $100.000 $16.500 $50.000 $18.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 9.000 $250.000 $297.000 $300.000 $350.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 2.000 $400.000 $581.900 $420.000 $650.000
PREFAB PAV MRK TY C (W) (WORD)
EA 6.000 $300.000 $431.200 $320.000 $485.000
REFL PAV MRKR TY I-C
EA 6.000 $4.000 $7.700 $6.000 $9.000
REFL PAV MRKR TY II-A-A
EA 48.000 $5.000 $7.700 $6.000 $8.000
REFL PAV MRKR TY II-C-R
EA 22.000 $5.000 $7.700 $6.000 $8.000
ELIM EXT PAV MRK & MRKS (4")
LF 1,467.000 $1.000 $0.420 $1.000 $0.450
ELIM EXT PAV MRK & MRKS (8")
LF 1,215.000 $2.000 $0.830 $2.000 $0.900
ELIM EXT PAV MRK & MRKS (24")
LF 418.000 $5.000 $2.420 $4.000 $2.750
ELIM EXT PAV MRK & MRKS (ARROW)
EA 12.000 $100.000 $33.000 $75.000 $37.000
ELIM EXT PAV MRK & MRKS (DBL ARROW)
EA 1.000 $100.000 $66.000 $75.000 $75.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 6.000 $100.000 $33.000 $75.000 $35.000
PAV SURF PREP FOR MRK (4")
LF 39.000 $0.500 $0.040 $1.000 $0.050
PAV SURF PREP FOR MRK (6")
LF 1,601.000 $0.500 $0.040 $1.000 $0.050
PAV SURF PREP FOR MRK (8")
LF 358.000 $0.500 $0.070 $1.000 $0.050
PAV SURF PREP FOR MRK (12")
LF 369.000 $1.000 $0.110 $1.000 $0.150
PAV SURF PREP FOR MRK (24")
LF 679.000 $2.000 $0.220 $1.000 $0.250
PAV SURF PREP FOR MRK (ARROW)
EA 9.000 $50.000 $7.700 $25.000 $8.500
PAV SURF PREP FOR MRK (DBL ARROW)
EA 2.000 $50.000 $7.700 $25.000 $8.500
PAV SURF PREP FOR MRK (WORD)
EA 6.000 $50.000 $7.700 $25.000 $8.500
PAV SURF PREP FOR MRK (MED NOSE)
EA 1.000 $300.000 $5.500 $50.000 $6.000
PED DETECT PUSH BUTTON (STANDARD)
EA 2.000 $600.000 $1,375.000 $800.000 $550.000
REMOVAL OF PEDESTRIAN PUSH BUTTONS
EA 2.000 $100.000 $55.000 $300.000 $150.000
TREE PROTECTION
EA 17.000 $1,500.000 $165.000 $1,000.000 $250.000
D-GR HMA TY-B PG64-22 (EXEMPT)
TON 92.000 $200.000 $330.000 $180.000 $310.000
TACK COAT
GAL 175.000 $10.000 $11.000 $8.000 $15.000
D-GR HMA TY-D PG 76-22 (EXEMPT)
TON 220.000 $200.000 $330.000 $180.000 $315.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 222.000 $185.000 $1.100 $150.000 $200.000
TMA (STATIONARY)
DAY 110.000 $185.000 $1.100 $300.000 $475.000
TMA (MOBILE OPERATION)
DAY 1.000 $185.000 $1.100 $300.000 $475.000
Totals: $1,489,111.000 $1,547,419.841 $1,828,671.250 $1,864,038.200