WASHINGTON US 290 (0114-09-080)

Items: 53

County: WASHINGTON
Length: N/A
Highway: US 290
District: BRYAN
Control Number: 0114-09-080
DBE Goal: N/A
Project: BR 2020(481)
Guaranty: N/A
Time: 96 WORKING DAYS
Engineer's Estimate: $2,621,178.50
Date: 01/09/2020 (6 years ago)
Contract Number: N/A
Type: DECK REHABILITATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (7)
E
Engineer's Estimate
$2,621,178.50
$2,499,110.52
Over/Under Est: -4.66% -$122,067.98
Over/Under Est: 3.43% $89,935.86
Amt Left: 8.48% $212,003.84
Over/Under Est: 5.06% $132,513.70
Amt Left: 10.19% $254,581.68
Delta: -1.57% -$42,577.84
Over/Under Est: 15.04% $394,323.50
Amt Left: 20.66% $516,391.48
Delta: -9.51% -$261,809.80
Over/Under Est: 17.08% $447,770.00
Amt Left: 22.8% $569,837.98
Delta: -1.77% -$53,446.50
Over/Under Est: 36.57% $958,561.50
Amt Left: 43.24% $1,080,629.48
Delta: -16.64% -$510,791.50
Over/Under Est: 36.94% $968,381.81
Amt Left: 43.63% $1,090,449.79
Delta: -0.27% -$9,820.31

Bid Items & Bid Tabulations

53 Total 0 of 53
WASHINGTON  |  US 290  |  BRYAN  |  0114-09-080  |  01/09/2020  |  $2,621,178.50  |  BR 2020(481)  |  DECK REHAB  |  96 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, L.L.C.
KNIFE RIVER CORPORATION - SOUTH
GIBSON & ASSOCIATES, INC.
SOUTHERN ROAD & BRIDGE, LLC
ANGEL BROTHERS HOLDINGS CORP.
STATELINE CONSTRUCTION, LLC
FUQUA CONSTRUCTION CO., INC.
REMOVING CONC (APPR SLAB)
SY 1,290.000 $50.000 $63.850 $45.000 $150.000 $52.000 $50.000 $55.000 $250.500
REMOVING STAB BASE AND ASPH PAV (2")
SY 5,340.000 $12.000 $9.140 $11.150 $9.630 $9.000 $15.000 $22.000 $15.750
SUPERPAVE MIXTURES SP-D SAC-A PG64-22
TON 594.000 $150.000 $429.040 $243.000 $185.060 $128.000 $350.000 $235.000 $397.500
CEM STABIL BKFL
CY 352.000 $300.000 $209.960 $154.000 $370.000 $64.000 $250.000 $265.000 $170.850
FLOWABLE BACKFILL
CY 90.000 $300.000 $334.160 $207.000 $610.000 $365.000 $375.000 $335.000 $219.460
TEMPORARY SPL SHORING
SF 228.000 $60.000 $242.550 $33.000 $220.000 $20.000 $400.000 $35.000 $40.000
CL B CONC (FLUME)
CY 16.000 $800.000 $727.370 $1,350.000 $1,600.000 $1,664.000 $1,500.000 $495.000 $715.000
APPROACH SLAB (MOD)
CY 465.000 $1,000.000 $750.000 $856.000 $610.000 $1,500.000 $750.000 $1,125.000 $1,000.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 600.000 $500.000 $140.510 $265.000 $205.000 $288.000 $250.000 $210.000 $420.000
CONC STR REPAIR (RIPRAP COLUMN RELIEF)
EA 14.000 $500.000 $1,365.430 $2,205.000 $1,850.000 $2,400.000 $2,250.000 $2,800.000 $2,200.000
CONC STR REPAIR (PAN GIRDER HOLE REPR)
EA 260.000 $500.000 $131.930 $559.000 $225.000 $608.000 $550.000 $165.000 $150.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 7.000 $300.000 $400.000 $485.000 $1,150.000 $148.000 $1,050.000 $1,000.000 $240.000
RIPRAP (MOW STRIP)(5 IN)
CY 231.000 $300.000 $650.000 $499.000 $930.000 $704.000 $950.000 $495.000 $535.900
CLEANING AND SEALING EXISTING JOINTS
LF 523.000 $50.000 $20.380 $49.000 $45.000 $54.000 $45.000 $69.000 $63.000
CLEANING AND SEALING EXIST JOINTS(CL7)
LF 516.000 $50.000 $18.230 $56.000 $45.000 $62.000 $50.000 $78.000 $69.000
CLEANING EXISTING JOINTS
LF 238.000 $25.000 $34.030 $62.000 $60.000 $68.000 $55.000 $65.000 $67.500
SHOT BLASTING
SY 3,729.000 $7.000 $9.650 $18.240 $7.270 $8.000 $10.000 $28.000 $24.150
MOBILIZATION
LS 1.000 $200,000.000 $245,000.000 $312,000.000 $275,000.000 $257,340.000 $300,000.000 $350,000.000 $380,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $6,000.000 $5,000.000 $8,500.000 $25,000.000 $2,277.000 $14,000.000 $10,500.000 $9,708.020
TEMP SEDMT CONT FENCE (INSTALL)
LF 100.000 $3.000 $5.000 $7.500 $10.000 $4.000 $3.000 $5.000 $15.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 100.000 $1.000 $5.000 $5.000 $5.000 $1.000 $1.000 $3.000 $6.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 640.000 $35.000 $75.000 $36.000 $42.000 $96.000 $50.000 $110.000 $30.250
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 3,840.000 $18.000 $27.500 $17.000 $16.500 $18.000 $15.000 $45.000 $25.120
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 640.000 $15.000 $25.550 $30.000 $20.000 $18.000 $30.000 $22.000 $10.670
MTL W-BEAM GD FEN (TIM POST)
LF 2,475.000 $25.000 $18.000 $21.000 $19.800 $26.000 $20.000 $23.000 $31.700
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 24.000 $3,000.000 $1,700.000 $2,250.000 $1,870.000 $1,972.000 $2,000.000 $1,500.000 $2,312.070
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,300.000 $1,250.000 $1,470.000 $1,375.000 $1,235.000 $1,100.000 $1,350.000 $1,449.570
REMOVE METAL BEAM GUARD FENCE
LF 2,700.000 $15.000 $3.000 $3.500 $3.300 $3.000 $2.000 $3.000 $5.070
REMOVE TERMINAL ANCHOR SECTION
EA 12.000 $300.000 $450.000 $529.000 $495.000 $218.000 $200.000 $300.000 $257.070
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 12.000 $275.000 $300.000 $350.000 $330.000 $256.000 $250.000 $250.000 $302.070
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,200.000 $2,560.000 $3,100.000 $2,816.000 $3,508.000 $3,250.000 $2,850.000 $4,112.070
GUARDRAIL END TREATMENT (REMOVE)
EA 12.000 $250.000 $250.000 $290.000 $275.000 $352.000 $325.000 $300.000 $414.570
CRASH CUSH ATTEN (MOVE & RESET)
EA 10.000 $2,500.000 $3,000.000 $1,764.000 $3,300.000 $1,767.000 $1,500.000 $2,900.000 $2,070.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $2,500.000 $750.000 $1,200.000 $825.000 $954.000 $750.000 $1,500.000 $1,117.500
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $15,000.000 $9,488.000 $9,400.000 $10,436.800 $11,168.000 $15,000.000 $10,950.000 $13,087.500
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 30.000 $20.000 $25.000 $29.000 $27.500 $12.000 $22.500 $20.000 $37.500
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 60.000 $30.000 $25.000 $29.000 $27.500 $18.000 $25.000 $25.000 $37.500
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 30.000 $20.000 $25.000 $29.000 $27.500 $12.000 $22.500 $25.000 $37.500
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 60.000 $30.000 $25.000 $29.000 $27.500 $18.000 $25.000 $25.000 $37.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 27,240.000 $0.200 $0.450 $0.410 $0.390 $1.000 $0.500 $0.500 $1.280
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 27,240.000 $0.200 $0.450 $0.410 $0.390 $1.000 $0.500 $0.500 $1.280
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,420.000 $0.300 $0.950 $1.000 $0.940 $2.000 $1.000 $1.100 $1.400
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 13,620.000 $0.300 $0.900 $0.650 $0.610 $2.000 $1.000 $0.750 $1.320
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 13,620.000 $0.300 $0.900 $0.650 $0.610 $2.000 $1.000 $0.750 $1.320
REFL PAV MRKR TY II-C-R
EA 174.000 $4.750 $5.000 $6.000 $5.500 $7.000 $5.250 $6.000 $15.000
ELIM EXT PAV MRK & MRKS (4")
LF 61,500.000 $0.400 $0.450 $0.350 $0.330 $1.000 $0.500 $0.450 $0.900
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 1,440.000 $3.000 $5.000 $1.000 $0.940 $7.000 $5.750 $1.100 $3.000
CONCRETE RAIL REPAIR (TYPE 501)
LF 3.000 $1,000.000 $2,016.500 $2,890.000 $1,400.000 $1,280.000 $750.000 $1,000.000 $1,400.000
CNC CRACK REPAIR (DISCRETE)(GRAVITY)
LF 300.000 $35.000 $52.560 $53.000 $80.000 $58.000 $50.000 $65.000 $38.030
POLYESTER POLYMER CONC OVERLAY (3/4")
SY 3,729.000 $120.000 $109.410 $137.400 $113.170 $122.000 $150.000 $265.000 $171.240
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $8,000.000 $12,000.000 $10,500.000 $16,000.000 $20,480.000 $15,000.000 $16,950.000 $17,536.500
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 1,440.000 $15.000 $25.460 $9.500 $8.800 $33.000 $29.750 $9.950 $22.500
TMA (STATIONARY)
DAY 40.000 $250.000 $200.000 $470.000 $525.000 $191.000 $600.000 $800.000 $487.130
Totals: $2,621,178.500 $2,499,110.520 $2,711,114.360 $2,753,692.200 $3,015,502.000 $3,068,948.500 $3,579,740.000 $3,589,560.310