WARD SH 18 (0292-04-073)

Items: 46

County: WARD
Length: 0.0000 MILES
Highway: SH 18
District: ODESSA
Control Number: 0292-04-073
DBE Goal: 0.0%
Project: F 2B24(004)
Guaranty: $9,000.00
Time: 72 WORKING DAYS
Engineer's Estimate: $468,330.75
Date: 03/05/2026 (3 months ago) Changed
Contract Number: 3263229
Type: PEDESTRIAN SIGNAL UPGRADES
Project ID: A00196733
Contract Type: Federal
Project Description: PEDESTRIAN SIGNAL UPGRADES
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
ODA-PRELETTINGQUESTIONS
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$468,330.75
$414,186.00
Over/Under Est: -11.56% -$54,144.75
Over/Under Est: 22.52% $105,468.25
Amt Left: 38.54% $159,613.00

Bid Items & Bid Tabulations

46 Total 0 of 46
WARD  |  SH 18  |  ODESSA  |  0292-04-073  |  03/05/2026  |  $468,330.75  |  F 2B24(004)  |  PEDESTRIAN SIGNAL UPGRADES  |  72 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ICOS MANAGEMENT, LLC
O. TREVINO CONSTRUCTION, LLC
REMOV CONC (RIPRAP)
SY 31.000 $55.000 $128.000 $252.000
REMOV CONC (DRIVEWAYS)
SY 7.000 $78.000 $214.000 $538.000
REMOV CONC (CURB RAMP)
SY 39.000 $37.000 $107.000 $516.000
REMOV CONC (CURB OR CURB & GUTTER)
LF 125.000 $135.000 $22.000 $53.000
RMV (8"-12") TRT/UNTRT BASE & ASPH PAV
SY 23.000 $14.550 $214.000 $127.000
EMBANK (FNL)(OC)(TY A)
CY 10.000 $75.000 $107.000 $1,834.000
RIPRAP (CONC)(5 IN)
CY 7.000 $850.000 $856.000 $2,040.000
REMOV STR (PIPE)
LF 90.000 $125.000 $13.000 $58.000
MOBILIZATION
LS 1.000 $42,574.520 $38,000.000 $57,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $15,000.000 $1.000 $16,250.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $17,500.000 $5,350.000 $16,000.000
TMA (STATIONARY)
DAY 62.000 $354.580 $268.000 $327.000
TMA (MOBILE OPERATION)
DAY 4.000 $650.000 $642.000 $172.000
CONC CURB (TY II)
LF 205.000 $45.000 $54.000 $103.000
CONC CURB & GUTTER (TY II)
LF 111.000 $48.000 $74.000 $122.000
CONC SIDEWALKS (5")
SY 120.000 $175.000 $86.000 $181.000
CURB RAMPS (TY 1)
EA 10.000 $2,400.000 $4,494.000 $4,436.000
CURB RAMPS (TY 2)
EA 3.000 $3,200.000 $5,885.000 $5,035.000
CURB RAMPS (TY 6)
EA 4.000 $3,211.590 $5,350.000 $2,842.000
CURB RAMPS (TY 21)
EA 1.000 $4,000.000 $5,350.000 $8,230.000
CONDT (PVC) (SCH 80) (3")
LF 190.000 $26.000 $32.000 $35.000
CONDUIT (PREPARE)
LF 480.000 $2.000 $7.000 $2.500
ELEC CONDR (NO.6) BARE
LF 422.000 $2.780 $3.500 $3.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $1,052.000 $1,284.000 $780.000
REMOVE SM RD SN SUP&AM
EA 3.000 $337.000 $1,284.000 $340.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 177.000 $1.940 $6.500 $7.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,029.000 $10.000 $14.000 $16.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 3.000 $214.330 $535.000 $403.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 3.000 $287.000 $642.000 $537.000
REFL PAV MRK TY I (W)6"(BRK)(100MIL)
LF 9.000 $1.090 $6.000 $7.000
REFL PAV MRK TY I (Y)6"(SLD)(100MIL)
LF 26.000 $1.250 $6.000 $7.000
REFL PAV MRKR TY I-C
EA 8.000 $14.000 $33.000 $33.000
ELIM EXT PM & MRKS (6")
LF 57.000 $1.340 $4.000 $4.000
ELIM EXT PM & MRKS (8")
LF 29.000 $4.660 $5.000 $5.000
ELIM EXT PM & MRKS (24")
LF 676.000 $6.420 $6.000 $7.000
ELIM EXT PM & MRKS (ARROW)
EA 3.000 $99.830 $214.000 $201.000
ELIM EXT PM & MRKS (WORD)
EA 3.000 $99.830 $321.000 $268.000
PED SIG SEC (LED)(COUNTDOWN)
EA 18.000 $1,033.000 $1,177.000 $1,184.000
TRF SIG CBL (TY A)(14 AWG)(5 CONDR)
LF 2,610.000 $3.000 $2.500 $3.000
TRF SIG CBL (TY C)(12 AWG)(2 CONDR)
LF 2,311.000 $2.000 $2.500 $3.000
PED POLE ASSEMBLY
EA 13.000 $3,774.000 $4,280.000 $4,736.000
PED DETECT PUSH BUTTON (APS)
EA 17.000 $1,005.000 $1,605.000 $1,184.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $5,000.000 $6,420.000 $473.000
REPLACE OF GROUND BOXES
EA 10.000 $4,150.000 $2,140.000 $1,776.000
REMOVAL OF SIGNAL RELATED SIGNS
EA 4.000 $215.000 $22.000 $177.000
INSTALL OF SIGNAL RELATED SIGNS
EA 8.000 $385.500 $856.000 $888.000
Totals: $468,330.750 $414,186.000 $573,799.000
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
PUBLIC UTILITY FORCE ACCT WORK (PART) $5,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $15,000.00
Total: $35,000.00