Show Job Controls
Bid Cobra

WARD SH 18 (0292-04-065)

Items: 42

County: WARD
Length: N/A
Highway: SH 18
District: ODESSA
Control Number: 0292-04-065
DBE Goal: N/A
Project: NH 2020(167)
Guaranty: N/A
Time: 125 WORKING DAYS
Engineer's Estimate: $5,564,342.99
Date: 11/06/2019 (6 years ago)
Contract Number: N/A
Type: ROADWAY REHABILITATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$5,564,342.99
$6,516,031.98
Over/Under Est: 17.1% $951,688.99
$7,909,907.85
Over/Under Est: 42.15% $2,345,564.86
Amt Left: 21.39% $1,393,875.87
Over/Under Est: 79.53% $4,425,515.59
Amt Left: 53.31% $3,473,826.60
Delta: -26.30% -$2,079,950.73
$10,896,403.00
Over/Under Est: 95.83% $5,332,060.01
Amt Left: 67.22% $4,380,371.02
Delta: -9.07% -$906,544.42

Bid Items & Bid Tabulations

42 Total 0 of 42
WARD  |  SH 18  |  ODESSA  |  0292-04-065  |  11/06/2019  |  $5,564,342.99  |  NH 2020(167)  |  ROADWAY REHAB  |  125 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
FNF CONSTRUCTION, INC.
DAN WILLIAMS COMPANY
JONES BROS. DIRT & PAVING CONTRACTORS, INC.
FNH CONSTRUCTION, LLC
REMOVING CONC (MISC)
SY 834.000 $19.700 $31.500 $22.000 $17.500 $30.000
REMOVING STAB BASE & ASPH PAV (9")
SY 76,442.000 $3.500 $6.500 $4.500 $11.650 $10.000
BLADING
HR 10.000 $262.000 $283.000 $105.000 $500.000 $180.000
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 76,442.000 $0.860 $1.300 $1.750 $3.500 $5.000
PRIME COAT (AE-P)
GAL 15,290.000 $5.500 $7.600 $4.500 $6.900 $10.000
FOG SEAL (CSS-1H)
GAL 15,290.000 $5.500 $3.800 $4.500 $5.250 $10.000
ASPH (AC-20-5TR)
GAL 30,580.000 $4.000 $3.800 $4.500 $4.700 $10.000
AGGR(TY-PB GR-4 SAC-A)
CY 704.000 $82.500 $136.000 $180.000 $196.500 $700.000
SUPERPAVE MIXTURES SP-B PG70-22
TON 31,543.000 $100.000 $107.000 $133.000 $121.000 $165.000
TACK COAT
GAL 15,290.000 $3.000 $5.000 $4.500 $6.900 $10.000
STONE-MTRX-ASPH SMAR-F SAC-A
TON 6,316.000 $107.250 $130.000 $221.000 $436.670 $200.000
TACK COAT
GAL 15,290.000 $3.000 $4.000 $4.500 $6.900 $10.000
CL K CONC (MISC)
CY 166.000 $1,097.800 $438.000 $700.000 $970.600 $1,500.000
ADJUSTING MANHOLES
EA 15.000 $800.600 $1,500.000 $1,800.000 $3,162.500 $1,500.000
ADJUSTING MANHOLES (WATER VALVE BOX)
EA 47.000 $500.000 $900.000 $1,800.000 $1,138.500 $1,000.000
MOBILIZATION
LS 1.000 $500,000.000 $640,000.000 $700,000.000 $795,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $10,000.000 $30,000.000 $30,000.000 $30,000.000 $20,000.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 160.000 $6.410 $10.000 $15.000 $27.760 $18.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 160.000 $1.580 $1.250 $3.750 $10.000 $9.000
CONC SIDEWALKS (5")
SY 70.000 $73.500 $86.000 $95.000 $136.850 $80.000
CURB RAMPS (TY 1)
EA 2.000 $1,800.000 $2,600.000 $1,400.000 $3,162.500 $3,000.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 87.000 $27.840 $41.000 $45.000 $34.500 $35.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $704.130 $1,550.000 $1,600.000 $961.400 $850.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $959.000 $1,450.000 $1,600.000 $879.750 $850.000
REMOVE SM RD SN SUP&AM
EA 4.000 $80.000 $80.000 $95.000 $172.500 $250.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 4.000 $109.800 $92.000 $175.000 $115.000 $650.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 45,504.000 $0.300 $0.320 $0.350 $1.440 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,426.000 $0.910 $1.000 $1.000 $1.150 $1.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 3,550.000 $0.450 $0.550 $0.550 $0.630 $1.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 3,613.000 $0.410 $0.550 $0.550 $0.630 $1.000
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 3,680.000 $0.250 $0.550 $0.550 $0.630 $1.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 22,611.000 $0.410 $0.550 $0.550 $0.630 $1.000
PREFAB PAV MRK TY B (W)(RR XING)
EA 1.000 $200.000 $460.000 $500.000 $3,117.650 $3,000.000
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 867.000 $15.950 $21.000 $22.000 $20.700 $20.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 41.000 $204.350 $240.000 $250.000 $323.440 $300.000
PREFAB PAV MRK TY C (W) (WORD)
EA 15.000 $250.000 $275.000 $275.000 $463.050 $500.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 16.000 $25.000 $40.000 $40.000 $39.740 $100.000
REFL PAV MRKR TY I-C
EA 267.000 $3.000 $3.600 $3.750 $3.450 $15.000
REFL PAV MRKR TY II-A-A
EA 532.000 $2.750 $3.600 $3.750 $3.450 $15.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $18,000.000 $20,000.000 $10,000.000 $28,500.000 $18,500.000
TMA (STATIONARY)
DAY 2.000 $2,000.000 $1,000.000 $300.000 $3,753.000 $550.000
TMA (MOBILE OPERATION)
HR 48.000 $21.000 $90.000 $70.000 $115.000 $85.000
Totals: $5,564,342.990 $6,516,031.980 $7,909,907.850 $9,989,858.580 $10,896,403.000