Show Job Controls
Bid Cobra

WARD IH 20 (0004-02-063)

Items: 96

County: WARD
Length: N/A
Highway: IH 20
District: ODESSA
Control Number: 0004-02-063
DBE Goal: N/A
Project: BR 2023(933)
Guaranty: N/A
Time: 434 WORKING DAYS
Engineer's Estimate: $31,008,180.70
Date: 06/27/2023 (2 years ago)
Contract Number: N/A
Type: REPLACE BRIDGES AND APPROACHES
Mail/Deliver Bids To: N/A
ODA-PRELETTINGQUESTIONS
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$31,008,180.70
$28,745,654.99
Over/Under Est: -7.3% -$2,262,525.71
$32,593,383.30
Over/Under Est: 5.11% $1,585,202.60
Amt Left: 13.39% $3,847,728.31
Over/Under Est: 13.78% $4,273,714.54
Amt Left: 22.74% $6,536,240.25
Delta: -8.25% -$2,688,511.94
$37,314,065.00
Over/Under Est: 20.34% $6,305,884.30
Amt Left: 29.81% $8,568,410.01
Delta: -5.76% -$2,032,169.76
Subcontractor Percentage Amount
LONE STAR PAVING COMPANY 10.67% $3,093,247.28
M & D FOUNDATION DRILLING INDUSTRIES, INC. 6.59% $1,910,449.82
RUBIO'S PAVING 2.96% $858,107.96
CND CONTRACTING, LLC 2.76% $800,127.69
JB PINNACLE GROUP, LLC 1.53% $443,549.05
NATIONWIDE REBAR INC. 1.22% $353,679.63
HJC FARMS, INC. 1.17% $339,184.57
F.S. TRUCKING, INC. 1.01% $292,800.35
DALLAS LITE AND BARRICADE, INC. 0.75% $217,426.00
TRP CONSTRUCTION GROUP, LLC 0.54% $156,546.72
A K FUQUAY CONSTRUCTION 0.42% $121,758.56
TORO BRAVO CONSTRUCTION, LLC 0.38% $110,162.51
A BROTHERS MILLING, LLC 0.24% $69,576.32
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.17% $49,283.23
FC TRAFFIC CONTROL, INC. 0.13% $37,687.17
WEST TEXAS ROCK RESOURCES, LLC 0.02% $5,798.03
Total: 30.56% $8,859,384.89

Bid Items & Bid Tabulations

96 Total 0 of 96
WARD  |  IH 20  |  ODESSA  |  0004-02-063  |  06/27/2023  |  $31,008,180.70  |  BR 2023(933)  |  REPLACE BRIDGES AND APPROACHES  |  434 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, LLC
DAN WILLIAMS COMPANY
RAGLE CONSTRUCTION, INC.
FNF CONSTRUCTION, INC.
REMOVING CONCRETE(MOW STRIP)
LF 3,189.000 $15.000 $10.660 $7.000 $6.400 $15.000
REMOVING STAB BASE AND ASPH PAV (10")
SY 15,520.000 $10.000 $8.830 $10.000 $40.000 $20.000
EXCAVATION (ROADWAY)
CY 12,127.000 $28.000 $45.380 $16.000 $100.000 $35.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 13,399.000 $25.000 $39.880 $20.000 $20.000 $67.000
BLADING
HR 30.000 $275.000 $532.150 $150.000 $178.000 $335.000
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 53,122.000 $0.250 $1.330 $0.450 $0.450 $1.000
PROOF ROLLING
HR 30.000 $175.000 $149.190 $71.500 $114.000 $125.000
FL BS (CMP IN PLC)(TY A GR 4)(14")
SY 33,160.000 $25.000 $40.820 $58.000 $34.000 $25.000
PRIME COAT (AE-P)
GAL 6,638.000 $6.000 $7.920 $8.500 $7.400 $6.000
ASPH (AC-20-5TR)
GAL 22,108.000 $5.000 $6.600 $7.500 $6.100 $5.000
AGGR(TY-PB GR-4 SAC-A)
CY 566.000 $190.000 $228.240 $300.000 $260.000 $130.000
PLANE ASPH CONC PAV(0" TO 8")
SY 5,066.000 $8.000 $4.240 $8.000 $8.000 $7.000
CEM STABIL BKFL
CY 1,238.000 $300.000 $232.910 $325.000 $130.000 $260.000
TRENCH EXCAVATION PROTECTION
LF 129.000 $45.000 $51.130 $4.300 $27.000 $55.000
DRILL SHAFT (36 IN)
LF 7,208.000 $475.000 $396.170 $400.000 $500.000 $520.000
DRILL SHAFT (SIGN MTS) (24 IN)
LF 28.000 $210.000 $233.170 $300.000 $500.000 $200.000
CL B CONC (FLUME)
CY 40.100 $1,100.000 $4,136.200 $1,500.000 $630.000 $3,250.000
CL C CONC (ABUT)(HPC)
CY 576.000 $2,000.000 $1,131.110 $1,600.000 $950.000 $2,590.000
CL C CONC (CAP)(HPC)
CY 566.400 $2,000.000 $1,479.900 $2,200.000 $1,210.000 $2,080.000
REINF CONC SLAB (HPC)
SF 107,200.000 $35.000 $38.660 $35.000 $37.000 $45.000
APPROACH SLAB
CY 732.000 $700.000 $1,011.320 $1,000.000 $660.000 $1,440.000
PRESTR CONC GIRDER (TX28)
LF 13,290.000 $220.000 $233.160 $260.000 $195.000 $339.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 735.700 $750.000 $681.110 $800.000 $538.000 $825.000
RIPRAP (MOW STRIP)(4 IN)
CY 518.000 $700.000 $899.350 $750.000 $300.000 $800.000
RAIL (TY SSTR)(HPC)
LF 3,256.000 $150.000 $86.600 $115.000 $73.000 $125.000
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
LF 2,680.000 $155.000 $93.270 $120.000 $91.000 $140.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 936.000 $260.000 $254.410 $195.000 $205.000 $365.000
RC PIPE (CL III)(36 IN)
LF 146.000 $400.000 $226.070 $220.000 $301.000 $400.000
SET (TY II) (36 IN) (RCP) (4: 1) (C)
EA 2.000 $8,000.000 $6,470.350 $8,000.000 $4,000.000 $4,900.000
REMOV STR (SET)
EA 2.000 $1,800.000 $743.020 $750.000 $1,000.000 $1,100.000
REMOV STR (PIPE)
LF 133.000 $45.000 $31.950 $30.000 $20.000 $80.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 12.000 $90,000.000 $92,270.000 $85,000.000 $400,000.000 $175,000.000
MOBILIZATION
LS 1.000 $3,091,200.000 $1,560,547.060 $2,800,000.000 $3,500,000.000 $3,700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 22.000 $24,000.000 $9,482.220 $25,000.000 $56,500.000 $50,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $40.000 $31.660 $45.000 $50.000 $110.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $14.000 $11.870 $18.000 $25.000 $20.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 8,776.000 $11.000 $13.850 $9.750 $9.750 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 8,776.000 $2.000 $3.300 $1.750 $1.250 $2.000
CONSTRUCTING DETOURS
SY 11,075.000 $135.000 $97.090 $135.000 $115.000 $160.000
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 9,704.000 $90.000 $66.750 $120.000 $80.000 $90.000
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 14,398.000 $15.000 $5.600 $7.000 $20.000 $30.000
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 15,119.000 $25.000 $9.150 $15.000 $12.000 $20.000
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 6,786.000 $180.000 $92.880 $125.000 $60.000 $30.000
RUMBLE STRIPS (SHOULDER)
LF 13,880.000 $0.250 $0.460 $0.350 $0.500 $0.500
MTL W-BEAM GD FEN (STEEL POST)
LF 3,075.000 $38.000 $44.200 $35.000 $33.000 $45.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 18.000 $3,000.000 $3,529.150 $3,500.000 $2,900.000 $3,500.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 18.000 $1,600.000 $1,945.980 $1,600.000 $1,425.000 $2,000.000
MTL BM GD FEN TRANS (NON - SYM)
EA 18.000 $1,350.000 $1,602.960 $1,200.000 $1,150.000 $1,500.000
REMOVE METAL BEAM GUARD FENCE
LF 1,975.000 $4.000 $3.300 $3.000 $2.000 $4.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 30.000 $400.000 $329.830 $200.000 $200.000 $350.000
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $3,800.000 $4,386.700 $4,000.000 $3,000.000 $4,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 18.000 $380.000 $263.860 $400.000 $200.000 $275.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 1.000 $1,500.000 $3,298.280 $1,000.000 $2,636.080 $650.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,800.000 $1,978.960 $1,000.000 $3,105.680 $5,000.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 2.000 $25,000.000 $10,554.470 $12,000.000 $14,835.420 $25,000.000
ALUMINUM SIGNS (TY G)
SF 157.000 $35.000 $39.580 $35.000 $50.000 $35.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 3.000 $1,025.000 $1,121.410 $1,400.000 $619.000 $900.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $1,200.000 $1,438.050 $2,000.000 $987.000 $1,200.000
REMOVE SM RD SN SUP&AM
EA 7.000 $175.000 $131.930 $150.000 $175.000 $150.000
INSTALL LRSS (STRUCT STEEL)
LB 956.000 $10.000 $9.240 $10.000 $15.000 $8.000
REMOVE LRSA
EA 2.000 $2,000.000 $1,649.140 $950.000 $1,500.000 $1,800.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 32.000 $40.000 $26.390 $75.000 $18.000 $25.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 67.000 $40.000 $26.390 $75.000 $19.000 $25.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 2.000 $150.000 $197.900 $125.000 $2.000 $200.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 40.000 $35.000 $55.410 $90.000 $35.000 $50.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 20.000 $35.000 $55.410 $90.000 $35.000 $50.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 21,814.000 $0.600 $0.660 $0.500 $0.500 $0.750
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 23,350.000 $0.600 $0.660 $0.500 $0.500 $0.750
WK ZN PAV MRK REMOV (REFL) TY I-C
EA 159.000 $6.000 $9.240 $7.000 $7.000 $10.000
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 159.000 $6.000 $9.240 $7.000 $7.000 $10.000
WK ZN PAV MRK REMOV (TRAF BTN) TY W
EA 632.000 $5.000 $7.920 $6.000 $6.000 $8.000
WK ZN PAV MRK REMOV (TRAF BTN) TY Y
EA 632.000 $5.000 $7.920 $6.000 $6.000 $8.000
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 13,562.000 $1.200 $1.450 $1.100 $1.100 $1.500
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 17,486.000 $1.600 $1.450 $1.100 $1.100 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 414.000 $2.000 $2.640 $2.600 $1.600 $3.000
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 1,290.000 $1.300 $2.640 $3.000 $1.600 $3.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 6,180.000 $0.800 $0.990 $0.750 $0.750 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 22,456.000 $0.800 $0.920 $0.700 $0.700 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 24,434.000 $1.000 $0.920 $0.700 $0.700 $1.000
REFL PAV MRKR TY II-C-R
EA 311.000 $6.000 $9.240 $7.000 $7.000 $7.000
ELIM EXT PAV MRK & MRKS (4")
LF 41,560.000 $0.900 $1.120 $0.850 $0.850 $1.000
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 37,596.000 $3.000 $3.960 $6.000 $2.160 $5.000
PAV SURF PREP FOR MRK (6")
LF 37,310.000 $2.000 $0.330 $0.250 $0.250 $0.250
PAV SURF PREP FOR MRK (RPM)
EA 227.000 $4.000 $1.320 $1.000 $1.000 $1.000
SP MIXES SP-B SAC-B PG70-22
TON 13,500.000 $130.000 $197.080 $227.000 $200.000 $140.000
TACK COAT
GAL 3,068.000 $6.000 $6.600 $10.000 $8.000 $13.000
STONE-MTRX-ASPH SMAR-F SAC-A
TON 3,248.000 $160.000 $289.050 $350.000 $325.000 $175.000
BONDING COURSE
GAL 3,068.000 $5.500 $6.600 $10.000 $6.100 $8.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 5.000 $25,000.000 $15,002.400 $14,000.000 $50,000.000 $20,000.000
MODULAR GLARE SCREENS (FURN & INSTALL)
LF 9,704.000 $30.000 $36.580 $22.000 $21.000 $25.000
MODULAR GLARE SCREENS (REMOVE)
LF 9,704.000 $2.000 $10.030 $2.000 $4.500 $3.000
MODULAR GLARE SCREENS (MOVE)
LF 8,610.000 $6.000 $10.600 $3.000 $4.000 $2.000
AUTO PORT SMRT TRF MONITOR SYS (PLAN 1)
DAY 1,338.000 $500.000 $223.840 $275.000 $255.000 $225.000
TMSP RADAR SPEED CONTROL MONITOR
EA 2.000 $10,000.000 $13,323.720 $12,000.000 $100,000.000 $14,000.000
TMA (STATIONARY)
DAY 106.000 $500.000 $902.680 $350.000 $250.000 $275.000
TMA (MOBILE OPERATION)
DAY 246.000 $750.000 $134.100 $330.000 $787.000 $740.000
Totals: $31,008,180.700 $28,745,654.997 $32,593,383.300 $35,281,895.240 $37,314,065.000