Show Job Controls
Bid Cobra

WALLER US0290 (6489-73-001)

Items: 44

County: WALLER
Length: 0.0100 MILES
Highway: US0290
District: HOUSTON
Control Number: 6489-73-001
DBE Goal: 0.0%
Project: RMC - A00217524
Guaranty: $15,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $753,542.70
Date: 12/09/2025 (6 months ago)
Contract Number: 12251204
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00217524
Project Description: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$753,542.70
$284,740.00
Over/Under Est: -62.21% -$468,802.70
Over/Under Est: -51.52% -$388,209.70
Amt Left: 28.3% $80,593.00
Over/Under Est: -42.58% -$320,885.20
Amt Left: 51.95% $147,917.50
Delta: -18.43% -$67,324.50
$479,248.00
Over/Under Est: -36.4% -$274,294.70
Amt Left: 68.31% $194,508.00
Delta: -10.77% -$46,590.50
Over/Under Est: -12.8% -$96,470.20
Amt Left: 130.76% $372,332.50
Delta: -37.10% -$177,824.50

Bid Items & Bid Tabulations

44 Total 0 of 44
WALLER  |  US0290  |  HOUSTON  |  6489-73-001  |  12/09/2025  |  $753,542.70  |  RMC - A00217524  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ABOVE ALL CONTRACTING LLC
AUSTIN BARRICADE COMPANY, L.L.C.
ROY JORGENSEN ASSOCIATES, INC.
RHINO EQUITY, LLC
HAZMAT INTERNATIONAL, INC.
REMOV CONC (MOWSTRIP)
LF 450.000 $18.900 $10.000 $5.000 $5.000 $1.000 $15.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 40.000 $90.000 $10.000 $44.000 $250.000 $20.000 $25.000
CONC STR REPAIR (STANDARD)
SF 40.000 $97.600 $10.000 $44.000 $250.000 $20.000 $25.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $500.000 $600.000 $100.000 $500.000 $300.000 $100.000
MOBILIZATION (CALLOUT)
EA 60.000 $350.000 $1.000 $1.000 $1.000 $1.000 $1.000
MOBILIZATION (EMERGENCY)
EA 4.000 $1,000.000 $1.000 $1.000 $2,500.000 $1.000 $1,000.000
TMA (STATIONARY)
DAY 70.000 $240.000 $1.000 $1.000 $200.000 $750.000 $2,000.000
PERM CTB (SGL SLOPE)(TY 1)(TRANSITION)
LF 400.000 $270.000 $25.000 $48.000 $5.000 $10.000 $100.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $29.100 $35.000 $23.000 $25.000 $26.000 $15.000
MTL W-BEAM GD FEN (STEEL POST)
LF 125.000 $45.600 $50.000 $22.000 $27.500 $30.000 $35.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $1,722.000 $3,000.000 $1,300.000 $2,000.000 $1,500.000 $2,200.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,327.000 $1,500.000 $3,980.000 $1,200.000 $2,000.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $10.300 $5.000 $1.000 $2.000 $1.000 $1.000
GUARDRAIL END TREATMENT (INSTALL)
EA 50.000 $3,276.000 $1,600.000 $3,500.000 $4,000.000 $3,500.000 $3,250.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 1,000.000 $20.500 $28.000 $40.000 $20.000 $25.000 $17.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 25.000 $50.000 $100.000 $44.000 $20.000 $30.000 $30.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 2.000 $60.000 $1,000.000 $50.000 $50.000 $500.000 $500.000
REPLACE TIMBER POST W/O CONC FND
EA 10.000 $60.000 $50.000 $50.000 $60.000 $50.000 $35.000
REPLACE TIMBER POST W/ CONC FND
EA 150.000 $101.000 $50.000 $1.000 $60.000 $50.000 $45.000
REPLACE STEEL POST W/ CONC FND
EA 150.000 $105.000 $30.000 $50.000 $80.000 $50.000 $85.000
REALIGN POSTS
EA 80.000 $40.000 $100.000 $22.000 $7.500 $5.000 $20.000
REPLACE TERMINAL ANCHOR POSTS
EA 8.000 $102.000 $10.000 $50.000 $100.000 $45.000 $75.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 25.000 $1,300.000 $500.000 $400.000 $500.000 $1,200.000 $850.500
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 6.000 $31.200 $120.000 $400.000 $500.000 $200.000 $75.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 1,200.000 $70.700 $20.000 $1.000 $20.000 $50.000 $100.000
REPLACE BLOCKOUT
EA 130.000 $185.000 $100.000 $200.000 $20.000 $100.000 $150.000
REPAIR STEEL POST WITH BASE PLATE
EA 100.000 $242.000 $25.000 $55.000 $125.000 $10.000 $100.000
REPLACE SGT OBJECT MARKER
EA 25.000 $50.000 $25.000 $1.000 $50.000 $40.000 $20.000
REPLACE SGT CABLE ANCHOR
EA 25.000 $92.200 $50.000 $1.000 $50.000 $50.000 $100.000
REPLACE SGT CABLE ASSEMBLY
EA 25.000 $123.000 $50.000 $1.000 $50.000 $50.000 $100.000
REPLACE SGT STRUT
EA 25.000 $104.000 $50.000 $1.000 $50.000 $50.000 $100.000
RAISE RAIL
LF 100.000 $2.750 $10.000 $5.000 $5.000 $1.000 $20.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 50.000 $1,650.000 $100.000 $10.000 $20.000 $30.000 $100.000
REPLACE POSTS (TL-4)(TRINITY)
EA 60.000 $175.000 $0.100 $409.000 $270.000 $325.000 $350.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $500.000 $500.000 $200.000 $1,000.000 $1.000 $175.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 2.000 $167.000 $500.000 $100.000 $2,500.000 $1.000 $200.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 2.000 $2,500.000 $4,000.000 $4,957.000 $4,000.000 $1,800.000 $3,650.000
REPLACE CABLE (TL-4)
LF 100.000 $79.000 $10.000 $4.000 $2.000 $1.000 $6.500
CHECK / RE-TENSION CABLE (TL-4)
EA 70.000 $524.000 $100.000 $1.000 $150.000 $500.000 $200.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 10.000 $50.500 $100.000 $52.000 $50.000 $10.000 $100.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 2.000 $33.500 $500.000 $50.000 $80.000 $10.000 $200.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 25.000 $80.000 $25.000 $40.000 $5.000 $5.000 $25.000
REPAIR (T4(S))
LF 25.000 $121.000 $150.000 $82.000 $125.000 $75.000 $200.000
REPAIR (STL POST W/ BASE PLATE)(T4(S))
EA 5.000 $51.300 $300.000 $203.000 $100.000 $100.000 $250.000
Totals: $753,542.700 $284,740.000 $365,333.000 $432,657.500 $479,248.000 $657,072.500