WALLER US0290 (6449-33-001)

Items: 44

County: WALLER
Length: N/A
Highway: US0290
District: HOUSTON
Control Number: 6449-33-001
DBE Goal: N/A
Project: RMC - 644933001
Guaranty: N/A
Time: 366 CALENDAR DAYS
Engineer's Estimate: $434,335.00
Date: 10/05/2023 (2 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
ROBERT BISSETT
MATTHEW LISTVAN
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$434,335.00
$385,249.00
Over/Under Est: -11.3% -$49,086.00
Over/Under Est: 5.89% $25,590.00
Amt Left: 19.38% $74,676.00
Over/Under Est: 18.7% $81,212.00
Amt Left: 33.82% $130,298.00
Delta: -12.09% -$55,622.00

Bid Items & Bid Tabulations

44 Total 0 of 44
WALLER  |  US0290  |  HOUSTON  |  6449-33-001  |  10/05/2023  |  $434,335.00  |  RMC - 644933001  |  METAL BEAM GUARD FENCE REPAIR  |  366 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ABOVE ALL CONSTRUCTION
ICOS MANAGEMENT, LLC
ISI CONTRACTING, INC.
REMOVING CONCRETE(MOW STRIP)
LF 450.000 $40.000 $10.000 $8.000 $5.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 40.000 $130.000 $20.000 $20.000 $250.000
CONC STR REPAIR (STANDARD)
SF 40.000 $135.000 $20.000 $20.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 20.000 $350.000 $400.000 $300.000 $430.000
MOBILIZATION (CALLOUT)
EA 60.000 $200.000 $1.000 $1.000 $150.000
MOBILIZATION (EMERGENCY)
EA 4.000 $550.000 $1.000 $350.000 $500.000
PORT CTB (MOVE) (SAFETY SH) (TY 2)
LF 60.000 $20.000 $15.000 $15.000 $8.000
PORT CTB (REMOVE) (SAFETY SH) (TY 2)
LF 60.000 $20.000 $15.000 $15.000 $12.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $22.000 $25.000 $25.000 $40.000
MTL W-BEAM GD FEN (STEEL POST)
LF 125.000 $30.000 $60.000 $30.000 $57.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,000.000 $2,000.000 $1,500.000 $3,688.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,550.000 $1,500.000 $1,500.000 $2,230.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $2.000 $1.000 $2.000 $6.000
GUARDRAIL END TREATMENT (INSTALL)
EA 50.000 $3,400.000 $3,100.000 $2,500.000 $3,400.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 1,000.000 $24.000 $27.000 $20.000 $30.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $15.000 $40.000 $1.000 $32.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 50.000 $32.000 $50.000 $1.000 $65.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 300.000 $75.000 $40.000 $1.000 $54.000
REPAIR STEEL POST WITH BASE PLATE
EA 6.000 $100.000 $40.000 $150.000 $300.000
REALIGN POSTS
EA 80.000 $14.000 $20.000 $1.000 $17.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $20.000 $200.000 $100.000 $26.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 1,500.000 $35.000 $30.000 $25.000 $47.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 130.000 $80.000 $100.000 $80.000 $55.000
REPLACE TERMINAL ANCHOR POSTS
EA 8.000 $100.000 $50.000 $1.000 $300.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 25.000 $1,100.000 $1,000.000 $800.000 $1,750.000
REPLACE SGT CABLE ASSEMBLY
EA 25.000 $95.000 $90.000 $1.000 $207.000
REPLACE SGT CABLE ANCHOR
EA 25.000 $95.000 $90.000 $1.000 $135.000
REPLACE SGT STRUT
EA 25.000 $100.000 $90.000 $1.000 $128.000
REPLACE SGT OBJECT MARKER
EA 25.000 $25.000 $50.000 $1.000 $36.000
REPAIR RAIL ELEMENT (CURVED RAIL)(FURN)
LF 50.000 $50.000 $50.000 $25.000 $60.000
REPLACE POSTS (TL-4)
EA 60.000 $185.000 $250.000 $225.000 $442.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $200.000 $150.000 $500.000 $901.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 2.000 $65.000 $100.000 $1.000 $552.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 2.000 $1,300.000 $2,000.000 $500.000 $4,343.000
REPLACE CABLE (TL-4)
LF 100.000 $5.000 $5.000 $5.000 $16.000
CHECK / RE-TENSION CABLE
EA 6.000 $60.000 $500.000 $100.000 $633.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 10.000 $50.000 $50.000 $50.000 $55.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 2.000 $100.000 $100.000 $100.000 $1,180.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 25.000 $5.000 $5.000 $32.000 $14.000
REPAIR (TRACC) (BAY)
EA 2.000 $800.000 $200.000 $500.000 $778.000
REP (CONC PARAPETW/STL POST/RAIL-T4(S))
LF 10.000 $100.000 $100.000 $50.000 $106.000
REP METAL POST W/ BASE PLATE(T4(S)RAIL)
EA 5.000 $100.000 $150.000 $150.000 $448.000
REPAIR TY (T4 (S) RAIL)
LF 25.000 $100.000 $100.000 $50.000 $128.000
TMA (STATIONARY)
DAY 70.000 $200.000 $1.000 $2,500.000 $175.000
Totals: $434,335.000 $385,249.000 $459,925.000 $515,547.000