WALLER US0290 (6374-02-001)

Items: 48

County: WALLER
Length: N/A
Highway: US0290
District: HOUSTON
Control Number: 6374-02-001
DBE Goal: N/A
Project: RMC - 637402001
Guaranty: N/A
Time: 365 WORKING DAYS
Engineer's Estimate: $216,012.50
Date: 01/12/2021 (5 years ago)
Contract Number: N/A
Type: GUARDRAIL REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$216,012.50
$185,582.50
Over/Under Est: -14.09% -$30,430.00
Over/Under Est: 8.41% $18,172.50
Amt Left: 26.19% $48,602.50
$518,177.90
Over/Under Est: 139.88% $302,165.40
Amt Left: 179.22% $332,595.40
Delta: -121.27% -$283,992.90

Bid Items & Bid Tabulations

48 Total 0 of 48
WALLER  |  US0290  |  HOUSTON  |  6374-02-001  |  01/12/2021  |  $216,012.50  |  RMC - 637402001  |  GUARDRAIL REPAIR  |  365 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
ROY JORGENSEN ASSOCIATES, INC.
TREVWAY, INC.
REMOVING CONCRETE(MOW STRIP)
LF 1,000.000 $3.500 $3.000 $5.000 $23.040
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 25.000 $100.000 $100.000 $125.000 $200.000
CONC STR REPAIR (STANDARD)
SF 25.000 $85.000 $70.000 $125.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 50.000 $450.000 $400.000 $350.000 $548.000
MOBILIZATION (CALLOUT)
EA 25.000 $250.000 $200.000 $900.000 $5,000.000
MOBILIZATION (EMERGENCY)
EA 3.000 $500.000 $500.000 $250.000 $5,000.000
PORT CTB (MOVE) (SAFETY SH) (TY 2)
LF 150.000 $8.000 $7.000 $10.000 $99.000
PORT CTB (REMOVE) (SAFETY SH) (TY 2)
LF 150.000 $22.000 $20.000 $25.000 $125.000
PORT CTB (DES SOURCE) (SAFETY SH)(TY 2)
LF 150.000 $22.000 $20.000 $20.000 $104.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $23.000 $20.000 $24.000 $38.250
MTL W-BEAM GD FEN (STEEL POST)
LF 125.000 $35.000 $30.000 $26.000 $75.360
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 2.000 $2,500.000 $2,000.000 $1,400.000 $2,282.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,250.000 $1,075.000 $500.000 $2,061.000
REMOVE METAL BEAM GUARD FENCE
LF 650.000 $1.500 $1.000 $2.000 $11.650
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,250.000 $3,100.000 $3,500.000 $2,703.000
CRASH CUSH ATTEN (REMOVE)
EA 1.000 $900.000 $500.000 $1,000.000 $1,500.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 1.000 $33,500.000 $23,000.000 $22,500.000 $25,000.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 1,000.000 $18.000 $15.000 $18.000 $18.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 25.000 $10.000 $5.000 $10.000 $211.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 37.500 $15.000 $5.000 $25.000 $99.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 100.000 $42.000 $38.000 $35.000 $148.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 50.000 $50.000 $44.000 $85.000 $247.000
REPAIR STEEL POST WITH BASE PLATE
EA 6.000 $250.000 $140.000 $125.000 $675.000
REALIGN POSTS
EA 25.000 $10.000 $5.000 $15.000 $50.000
REMOVE & REPLACE BLOCKOUT
EA 100.000 $8.500 $4.000 $10.000 $36.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 500.000 $25.000 $22.000 $40.000 $29.830
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $55.000 $45.000 $120.000 $205.000
REPLACE TERMINAL ANCHOR POSTS
EA 2.000 $12.500 $5.000 $20.000 $917.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,000.000 $1,015.000 $1,000.000 $1,221.000
REPLACE SGT CABLE ASSEMBLY
EA 20.000 $90.000 $100.000 $150.000 $276.000
REPLACE SGT CABLE ANCHOR
EA 20.000 $85.000 $90.000 $150.000 $268.000
REPLACE SGT STRUT
EA 20.000 $80.000 $100.000 $250.000 $255.000
REPLACE SGT OBJECT MARKER
EA 10.000 $30.000 $25.000 $40.000 $64.340
REPAIR RAIL ELEMENT (CURVED RAIL)(FURN)
LF 50.000 $25.000 $17.000 $15.000 $82.000
REPLACE POSTS (TL-4)
EA 75.000 $165.000 $120.000 $150.000 $207.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $350.000 $350.000 $300.000 $701.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 25.000 $30.000 $25.000 $50.000 $479.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 4.000 $600.000 $800.000 $500.000 $631.000
REPLACE CABLE (TL-4)
LF 500.000 $5.000 $2.000 $1.450 $7.000
CHECK / RE-TENSION CABLE
EA 4.000 $450.000 $400.000 $500.000 $315.000
POST AND CABLE FENCE(REMV / REPL POSTS)
EA 5.000 $40.000 $45.000 $40.000 $252.000
POST AND CABLE FENCE(RMV/REPL CNC ANCH)
EA 1.000 $100.000 $45.000 $85.000 $1,262.000
POST AND CABLE FENCE (REMV/ REPL CABLE)
LF 50.000 $5.000 $2.000 $1.450 $25.000
REPAIR (TRACC) (BAY)
EA 1.000 $800.000 $750.000 $1,250.000 $1,262.000
REP (CONC PARAPETW/STL POST/RAIL-T4(S))
LF 25.000 $35.000 $30.000 $20.000 $50.000
REP METAL POST W/ BASE PLATE(T4(S)RAIL)
EA 10.000 $50.000 $15.000 $50.000 $757.000
REPAIR TY (T4 (S) RAIL)
LF 25.000 $60.000 $30.000 $20.000 $100.000
TMA (STATIONARY)
DAY 20.000 $250.000 $400.000 $450.000 $378.000
Totals: $216,012.500 $185,582.500 $234,185.000 $518,177.900