|
|
PREPARING ROW
|
STA
|
318.470
|
$1,000.000
|
$1,047.000
|
$570.000
|
$40.000
|
$1,076.000
|
$1,500.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
8,775.000
|
$7.540
|
$21.000
|
$20.900
|
$11.000
|
$15.000
|
$35.000
|
|
|
EMBANKMENT (FINAL)(DENS CONT)(TY C)
|
CY
|
9,226.000
|
$2.310
|
$15.000
|
$19.300
|
$7.000
|
$24.000
|
$30.000
|
|
|
BLOCK SODDING
|
SY
|
56,719.000
|
$2.500
|
$2.850
|
$3.750
|
$2.880
|
$2.880
|
$3.000
|
|
|
STRAW OR HAY MULCH
|
SY
|
56,719.000
|
$0.200
|
$0.250
|
$0.190
|
$0.250
|
$0.250
|
$0.250
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
56,719.000
|
$0.100
|
$0.060
|
$0.100
|
$0.060
|
$0.060
|
$0.150
|
|
|
FERTILIZER
|
AC
|
23.440
|
$650.000
|
$626.000
|
$860.000
|
$626.890
|
$627.000
|
$650.000
|
|
|
VEGETATIVE WATERING
|
MG
|
2,812.500
|
$12.000
|
$19.800
|
$21.490
|
$22.000
|
$135.000
|
$12.000
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
11,022.000
|
$48.500
|
$103.000
|
$90.000
|
$108.000
|
$92.000
|
$100.000
|
|
|
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
|
CY
|
77.000
|
$150.000
|
$140.000
|
$200.000
|
$178.000
|
$565.000
|
$350.000
|
|
|
SALV, HAUL & STKPL RCL APH PV (1 1/2")
|
SY
|
394.000
|
$2.500
|
$11.000
|
$12.650
|
$28.000
|
$22.000
|
$25.000
|
|
|
SALV,HAUL&STKPL RCL APH PV(0 TO 1 1/2")
|
SY
|
843.000
|
$5.750
|
$11.000
|
$10.200
|
$14.000
|
$18.000
|
$25.000
|
|
|
ASPH (MULTI OPTION)
|
GAL
|
48,581.000
|
$3.000
|
$3.000
|
$2.850
|
$3.000
|
$3.650
|
$3.000
|
|
|
AGGR(TY-PB GR-4 SAC-B)
|
CY
|
1,226.000
|
$93.000
|
$113.000
|
$100.000
|
$113.000
|
$235.000
|
$125.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,250.000
|
$30.000
|
$42.000
|
$38.000
|
$42.000
|
$50.000
|
$35.000
|
|
|
STRUCT EXCAV (BOX)
|
CY
|
253.000
|
$7.500
|
$12.000
|
$5.500
|
$22.060
|
$81.000
|
$10.000
|
|
|
STRUCT EXCAV (PIPE)
|
CY
|
853.000
|
$5.000
|
$12.000
|
$5.500
|
$16.540
|
$51.000
|
$10.000
|
|
|
CEM STABIL BKFL
|
CY
|
486.000
|
$50.000
|
$55.000
|
$55.000
|
$137.850
|
$146.000
|
$85.000
|
|
|
CUT & RESTORE ASPH PAVING
|
SY
|
251.000
|
$125.000
|
$48.000
|
$137.000
|
$165.420
|
$200.000
|
$235.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
518.000
|
$2.000
|
$1.000
|
$6.000
|
$16.540
|
$22.000
|
$1.000
|
|
|
DRILL SHAFT (TRF SIG POLE) (36 IN)
|
LF
|
61.000
|
$227.730
|
$250.000
|
$236.000
|
$220.000
|
$250.000
|
$275.000
|
|
|
CONC BOX CULV (3 FT X 2 FT)
|
LF
|
46.000
|
$175.000
|
$285.000
|
$228.000
|
$468.690
|
$395.000
|
$540.000
|
|
|
CONC BOX CULV (5 FT X 2 FT)
|
LF
|
53.000
|
$225.000
|
$360.000
|
$308.000
|
$545.880
|
$600.000
|
$570.000
|
|
|
CONC BOX CULV (6 FT X 3 FT)
|
LF
|
43.000
|
$350.000
|
$460.000
|
$382.000
|
$661.680
|
$800.000
|
$1,100.000
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
23.000
|
$375.000
|
$490.000
|
$418.000
|
$771.950
|
$845.000
|
$1,200.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
58.000
|
$62.500
|
$125.000
|
$123.000
|
$66.170
|
$305.000
|
$190.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
342.000
|
$72.000
|
$130.000
|
$103.000
|
$143.360
|
$143.000
|
$200.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
374.000
|
$92.000
|
$140.000
|
$100.000
|
$159.900
|
$139.000
|
$220.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
186.000
|
$110.000
|
$150.000
|
$140.000
|
$220.560
|
$232.000
|
$250.000
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
1.000
|
$7,000.000
|
$14,200.000
|
$12,600.000
|
$13,233.510
|
$15,200.000
|
$14,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 18 IN)
|
EA
|
4.000
|
$3,200.000
|
$2,600.000
|
$3,100.000
|
$5,513.960
|
$10,300.000
|
$9,000.000
|
|
|
HEADWALL (CH - PW - 0) (DIA= 24 IN)
|
EA
|
11.000
|
$4,500.000
|
$3,600.000
|
$3,550.000
|
$7,168.150
|
$13,400.000
|
$10,000.000
|
|
|
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
|
EA
|
2.000
|
$4,500.000
|
$4,400.000
|
$6,250.000
|
$7,168.150
|
$4,400.000
|
$4,200.000
|
|
|
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
2.000
|
$5,500.000
|
$6,200.000
|
$7,850.000
|
$8,822.340
|
$6,050.000
|
$5,500.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (P)
|
EA
|
4.000
|
$12,500.000
|
$9,700.000
|
$11,750.000
|
$13,233.510
|
$9,200.000
|
$9,000.000
|
|
|
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
|
EA
|
2.000
|
$14,500.000
|
$9,700.000
|
$14,230.000
|
$16,541.890
|
$8,800.000
|
$9,300.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
48.000
|
$900.000
|
$1,350.000
|
$1,020.000
|
$937.370
|
$1,430.000
|
$1,400.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
44.000
|
$1,400.000
|
$1,400.000
|
$1,355.000
|
$1,047.650
|
$2,050.000
|
$1,600.000
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
46.000
|
$2,300.000
|
$3,000.000
|
$3,000.000
|
$2,756.980
|
$4,175.000
|
$3,300.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$4,000.000
|
$4,100.000
|
$4,100.000
|
$3,859.770
|
$5,200.000
|
$4,400.000
|
|
|
SET (TY II) (42 IN) (RCP) (6: 1) (P)
|
EA
|
4.000
|
$8,000.000
|
$6,500.000
|
$8,125.000
|
$5,513.960
|
$7,350.000
|
$6,700.000
|
|
|
REMOV STR (WINGWALL)
|
EA
|
4.000
|
$1,250.000
|
$500.000
|
$1,000.000
|
$1,654.190
|
$1,800.000
|
$1,800.000
|
|
|
REMOV STR (PIPE)
|
LF
|
679.000
|
$17.000
|
$14.000
|
$17.500
|
$33.080
|
$43.000
|
$50.000
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
70.000
|
$45.000
|
$47.000
|
$26.000
|
$220.560
|
$180.000
|
$400.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$380,000.000
|
$171,000.000
|
$509,000.000
|
$350,000.000
|
$130,000.000
|
$600,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
10.000
|
$4,500.000
|
$5,200.000
|
$1,240.000
|
$16,741.630
|
$20,250.000
|
$4,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
1,745.000
|
$35.000
|
$30.000
|
$29.000
|
$29.450
|
$29.450
|
$85.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,745.000
|
$10.000
|
$5.000
|
$9.650
|
$7.780
|
$7.780
|
$1.000
|
|
|
CONSTRUCTION PERIMETER FENCE
|
LF
|
200.000
|
$3.500
|
$11.000
|
$5.400
|
$4.340
|
$10.000
|
$15.000
|
|
|
CONC CURB (DOWEL)(SLOTTED)
|
LF
|
70.000
|
$15.000
|
$31.000
|
$45.500
|
$34.690
|
$70.000
|
$70.000
|
|
|
RUMBLE STRIPS (SHOULDER) ASPHALT
|
LF
|
63,122.000
|
$0.170
|
$0.090
|
$0.110
|
$0.220
|
$0.400
|
$0.250
|
|
|
RUMBLE STRIPS (CENTERLINE) ASPHALT
|
LF
|
31,293.000
|
$0.170
|
$0.090
|
$0.150
|
$0.300
|
$0.500
|
$0.250
|
|
|
MAILBOX INSTALL-S (TWW-POST) TY 4
|
EA
|
7.000
|
$230.000
|
$180.000
|
$121.000
|
$180.000
|
$180.000
|
$200.000
|
|
|
MAILBOX INSTALL-D (TWW-POST) TY 4
|
EA
|
5.000
|
$275.000
|
$200.000
|
$128.000
|
$200.000
|
$200.000
|
$300.000
|
|
|
MAILBOX INSTALL-M (TWW-POST) TY 4
|
EA
|
14.000
|
$550.000
|
$490.000
|
$540.000
|
$490.000
|
$490.000
|
$700.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
75.000
|
$10.170
|
$10.000
|
$18.300
|
$17.000
|
$10.000
|
$20.000
|
|
|
ELEC CONDR (NO.6) BARE
|
LF
|
75.000
|
$1.150
|
$3.000
|
$2.100
|
$1.950
|
$3.000
|
$2.400
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
35.000
|
$1.580
|
$3.500
|
$2.200
|
$2.050
|
$3.500
|
$2.500
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
65.000
|
$1.810
|
$3.750
|
$2.400
|
$2.250
|
$3.750
|
$2.800
|
|
|
TRAY CABLE (4 CONDR) (12 AWG)
|
LF
|
305.000
|
$2.190
|
$3.000
|
$2.650
|
$2.450
|
$3.000
|
$3.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
3.000
|
$1,121.400
|
$725.000
|
$1,130.000
|
$1,050.000
|
$725.000
|
$1,200.000
|
|
|
ZINC-COAT STL WIRE STRAND (1/4")
|
LF
|
445.000
|
$3.000
|
$2.750
|
$3.800
|
$3.550
|
$2.750
|
$4.000
|
|
|
ZINC-COAT STL WIRE STRAND (3/8")
|
LF
|
445.000
|
$4.000
|
$3.000
|
$4.200
|
$3.900
|
$3.000
|
$4.500
|
|
|
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
|
EA
|
1.000
|
$3,748.000
|
$5,000.000
|
$6,100.000
|
$5,650.000
|
$5,000.000
|
$6,500.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
84.200
|
$17.500
|
$18.000
|
$18.540
|
$18.000
|
$18.000
|
$22.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
32.000
|
$437.640
|
$450.000
|
$458.000
|
$450.000
|
$450.000
|
$500.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
1.000
|
$550.000
|
$620.000
|
$717.000
|
$620.000
|
$620.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$750.000
|
$640.000
|
$680.000
|
$640.000
|
$640.000
|
$700.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
21.000
|
$725.000
|
$600.000
|
$890.000
|
$600.000
|
$600.000
|
$900.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
9.000
|
$825.000
|
$680.000
|
$1,233.000
|
$680.000
|
$680.000
|
$1,200.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
|
EA
|
6.000
|
$925.000
|
$750.000
|
$1,135.000
|
$750.000
|
$750.000
|
$1,100.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
6.000
|
$81.170
|
$70.000
|
$105.000
|
$70.000
|
$70.000
|
$150.000
|
|
|
RELOCATE SM RD SN SUP & AM TY TEMP
|
EA
|
1.000
|
$95.900
|
$242.000
|
$134.000
|
$250.000
|
$250.000
|
$700.000
|
|
|
INSTL OM ASSM (OM-2Y)(WC)GND
|
EA
|
18.000
|
$50.000
|
$60.000
|
$38.000
|
$60.000
|
$60.000
|
$50.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
|
LF
|
127,489.000
|
$0.230
|
$0.200
|
$0.270
|
$0.250
|
$0.250
|
$0.230
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
200.000
|
$2.500
|
$3.000
|
$2.700
|
$2.500
|
$2.500
|
$4.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(RR XING)
|
EA
|
1.000
|
$175.000
|
$75.000
|
$200.000
|
$185.000
|
$185.000
|
$125.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
6,410.000
|
$0.260
|
$0.200
|
$0.270
|
$0.250
|
$0.250
|
$0.220
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
14,738.000
|
$0.230
|
$0.200
|
$0.270
|
$0.250
|
$0.250
|
$0.220
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
230.000
|
$5.270
|
$6.000
|
$6.450
|
$6.000
|
$6.000
|
$6.000
|
|
REFL PAV MRK TY I (W)(RR XING)(100MIL)
|
EA
|
1.000
|
$500.000
|
$650.000
|
$537.000
|
$500.000
|
$500.000
|
$325.000
|
|
REFL PAV MRK TY II (W) 24" (SLD)
|
LF
|
30.000
|
$2.200
|
$3.000
|
$1.900
|
$1.750
|
$1.750
|
$6.000
|
|
|
PAVEMENT SEALER 24"
|
LF
|
30.000
|
$0.970
|
$3.000
|
$2.150
|
$2.000
|
$2.000
|
$4.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
64,362.000
|
$0.750
|
$0.450
|
$0.430
|
$0.400
|
$0.400
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
6,410.000
|
$1.000
|
$0.450
|
$0.430
|
$0.400
|
$0.400
|
$0.420
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
14,738.000
|
$0.750
|
$0.450
|
$0.430
|
$0.400
|
$0.400
|
$0.420
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
508.000
|
$3.500
|
$5.000
|
$4.300
|
$4.000
|
$4.000
|
$4.150
|
|
|
ELIM EXT PAV MRK & MRKS (24")
|
LF
|
30.000
|
$1.670
|
$5.000
|
$2.150
|
$2.000
|
$2.000
|
$5.000
|
|
|
PAV SURF PREP FOR MRK (6")
|
LF
|
85,510.000
|
$0.100
|
$0.010
|
$0.010
|
$0.010
|
$0.010
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
230.000
|
$0.340
|
$0.060
|
$0.300
|
$0.250
|
$0.250
|
$0.500
|
|
|
PAV SURF PREP FOR MRK (RR XING)
|
EA
|
1.000
|
$100.000
|
$25.000
|
$54.000
|
$50.000
|
$50.000
|
$50.000
|
|
|
INSTALL HWY TRF SIG (SYSTEM)
|
EA
|
1.000
|
$28,361.590
|
$19,000.000
|
$23,450.000
|
$21,800.000
|
$19,000.000
|
$27,000.000
|
|
|
REMOVING TRAFFIC SIGNALS
|
EA
|
1.000
|
$3,176.070
|
$1,900.000
|
$1,880.000
|
$1,750.000
|
$1,900.000
|
$2,000.000
|
|
|
VEH SIG SEC (12")LED(YEL)
|
EA
|
8.000
|
$180.570
|
$150.000
|
$231.000
|
$215.000
|
$150.000
|
$220.000
|
|
|
VEH SIG SEC (12")LED(RED)
|
EA
|
4.000
|
$180.270
|
$150.000
|
$231.000
|
$215.000
|
$150.000
|
$220.000
|
|
|
BACK PLATE (12")(1 SEC)
|
EA
|
12.000
|
$77.280
|
$65.000
|
$59.000
|
$55.000
|
$65.000
|
$70.000
|
|
|
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
|
LF
|
1,515.000
|
$2.030
|
$4.250
|
$3.200
|
$3.000
|
$4.250
|
$4.000
|
|
|
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
|
EA
|
2.000
|
$7,000.000
|
$5,000.000
|
$4,675.000
|
$4,350.000
|
$5,000.000
|
$5,200.000
|
|
|
INS TRF SIG PL AM (S)STR(TY D)
|
EA
|
2.000
|
$5,500.560
|
$7,100.000
|
$7,415.000
|
$6,900.000
|
$7,100.000
|
$7,500.000
|
|
|
INS TRF SIG PL AM (S)STR(TY D)LUM
|
EA
|
2.000
|
$6,750.000
|
$8,300.000
|
$8,705.000
|
$8,100.000
|
$8,300.000
|
$8,500.000
|
|
|
FULL - WIDTH MOWING
|
CYC
|
3.000
|
$2,300.000
|
$1,500.000
|
$1,615.000
|
$2,100.000
|
$1,900.000
|
$4,500.000
|
|
|
LITTER REMOVAL
|
CYC
|
3.000
|
$1,700.000
|
$1,500.000
|
$1,615.000
|
$600.000
|
$1,600.000
|
$2,000.000
|
|
|
DITCH CLEANING AND RESHAPING (FOOT)
|
LF
|
60,457.000
|
$4.000
|
$1.300
|
$4.500
|
$1.900
|
$2.000
|
$3.000
|
|
|
D-GR HMA TY-D SAC-A PG70-22
|
TON
|
10,506.520
|
$92.250
|
$110.000
|
$96.000
|
$110.000
|
$102.000
|
$125.000
|
|
|
GEOGRID BASE REINFORCEMENT (TY II)
|
SY
|
42,613.000
|
$1.500
|
$1.250
|
$2.350
|
$1.400
|
$1.300
|
$5.500
|
|
|
BBU SYSTEM (EXTERNAL BATT CABINET)
|
EA
|
1.000
|
$6,459.690
|
$5,600.000
|
$6,100.000
|
$5,650.000
|
$5,600.000
|
$6,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
50.000
|
$175.000
|
$115.000
|
$235.000
|
$248.000
|
$300.000
|
$450.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
100.000
|
$250.000
|
$245.000
|
$10.000
|
$598.000
|
$300.000
|
$300.000
|
|
|
INSTALL OF CELLULAR MODEM
|
EA
|
1.000
|
$250.000
|
$75.000
|
$930.000
|
$865.000
|
$75.000
|
$900.000
|
|
|
WWD CELLULAR MODEM
|
EA
|
1.000
|
$3,740.000
|
$1,500.000
|
$970.000
|
$900.000
|
$1,500.000
|
$1,000.000
|
|
Totals: |
$4,302,752.790
|
$5,061,781.120
|
$5,248,973.233
|
$5,256,459.732
|
$6,166,888.650
|
$6,874,454.880
|