Show Job Controls
Bid Cobra

WALLER FM 2855 (2898-01-012)

Items: 110

County: WALLER
Length: N/A
Highway: FM 2855
District: HOUSTON
Control Number: 2898-01-012
DBE Goal: N/A
Project: C 2898-1-12
Guaranty: N/A
Time: 150 WORKING DAYS
Engineer's Estimate: $4,302,752.79
Date: 09/01/2021 (4 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (5)
E
Engineer's Estimate
$4,302,752.79
Over/Under Est: 17.64% $759,028.33
Over/Under Est: 21.99% $946,220.43
Amt Left: 3.7% $187,192.10
Over/Under Est: 22.17% $953,706.94
Amt Left: 3.85% $194,678.61
Delta: -0.14% -$7,486.51
Over/Under Est: 43.32% $1,864,135.86
Amt Left: 21.83% $1,105,107.53
Delta: -17.32% -$910,428.92
Over/Under Est: 59.77% $2,571,702.09
Amt Left: 35.81% $1,812,673.76
Delta: -11.47% -$707,566.23

Bid Items & Bid Tabulations

110 Total 0 of 110
WALLER  |  FM 2855  |  HOUSTON  |  2898-01-012  |  09/01/2021  |  $4,302,752.79  |  C 2898-1-12  |  SURF/ROADWAY RESTOR  |  150 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
STERLING DELAWARE HOLDING COMPANY, INC.
TEXAS MATERIALS GROUP, INC.
JAMES CONSTRUCTION GROUP, LLC
FORDE CONSTRUCTION COMPANY, INC.
DURWOOD GREENE CONSTRUCTION CO.
PREPARING ROW
STA 318.470 $1,000.000 $1,047.000 $570.000 $40.000 $1,076.000 $1,500.000
EXCAVATION (ROADWAY)
CY 8,775.000 $7.540 $21.000 $20.900 $11.000 $15.000 $35.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 9,226.000 $2.310 $15.000 $19.300 $7.000 $24.000 $30.000
BLOCK SODDING
SY 56,719.000 $2.500 $2.850 $3.750 $2.880 $2.880 $3.000
STRAW OR HAY MULCH
SY 56,719.000 $0.200 $0.250 $0.190 $0.250 $0.250 $0.250
BROADCAST SEED (TEMP) (WARM)
SY 56,719.000 $0.100 $0.060 $0.100 $0.060 $0.060 $0.150
FERTILIZER
AC 23.440 $650.000 $626.000 $860.000 $626.890 $627.000 $650.000
VEGETATIVE WATERING
MG 2,812.500 $12.000 $19.800 $21.490 $22.000 $135.000 $12.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 11,022.000 $48.500 $103.000 $90.000 $108.000 $92.000 $100.000
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
CY 77.000 $150.000 $140.000 $200.000 $178.000 $565.000 $350.000
SALV, HAUL & STKPL RCL APH PV (1 1/2")
SY 394.000 $2.500 $11.000 $12.650 $28.000 $22.000 $25.000
SALV,HAUL&STKPL RCL APH PV(0 TO 1 1/2")
SY 843.000 $5.750 $11.000 $10.200 $14.000 $18.000 $25.000
ASPH (MULTI OPTION)
GAL 48,581.000 $3.000 $3.000 $2.850 $3.000 $3.650 $3.000
AGGR(TY-PB GR-4 SAC-B)
CY 1,226.000 $93.000 $113.000 $100.000 $113.000 $235.000 $125.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 2,250.000 $30.000 $42.000 $38.000 $42.000 $50.000 $35.000
STRUCT EXCAV (BOX)
CY 253.000 $7.500 $12.000 $5.500 $22.060 $81.000 $10.000
STRUCT EXCAV (PIPE)
CY 853.000 $5.000 $12.000 $5.500 $16.540 $51.000 $10.000
CEM STABIL BKFL
CY 486.000 $50.000 $55.000 $55.000 $137.850 $146.000 $85.000
CUT & RESTORE ASPH PAVING
SY 251.000 $125.000 $48.000 $137.000 $165.420 $200.000 $235.000
TRENCH EXCAVATION PROTECTION
LF 518.000 $2.000 $1.000 $6.000 $16.540 $22.000 $1.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 61.000 $227.730 $250.000 $236.000 $220.000 $250.000 $275.000
CONC BOX CULV (3 FT X 2 FT)
LF 46.000 $175.000 $285.000 $228.000 $468.690 $395.000 $540.000
CONC BOX CULV (5 FT X 2 FT)
LF 53.000 $225.000 $360.000 $308.000 $545.880 $600.000 $570.000
CONC BOX CULV (6 FT X 3 FT)
LF 43.000 $350.000 $460.000 $382.000 $661.680 $800.000 $1,100.000
CONC BOX CULV (6 FT X 4 FT)
LF 23.000 $375.000 $490.000 $418.000 $771.950 $845.000 $1,200.000
RC PIPE (CL III)(18 IN)
LF 58.000 $62.500 $125.000 $123.000 $66.170 $305.000 $190.000
RC PIPE (CL III)(24 IN)
LF 342.000 $72.000 $130.000 $103.000 $143.360 $143.000 $200.000
RC PIPE (CL III)(30 IN)
LF 374.000 $92.000 $140.000 $100.000 $159.900 $139.000 $220.000
RC PIPE (CL III)(36 IN)
LF 186.000 $110.000 $150.000 $140.000 $220.560 $232.000 $250.000
INLET (COMPL)(TY AAD)
EA 1.000 $7,000.000 $14,200.000 $12,600.000 $13,233.510 $15,200.000 $14,000.000
HEADWALL (CH - PW - 0) (DIA= 18 IN)
EA 4.000 $3,200.000 $2,600.000 $3,100.000 $5,513.960 $10,300.000 $9,000.000
HEADWALL (CH - PW - 0) (DIA= 24 IN)
EA 11.000 $4,500.000 $3,600.000 $3,550.000 $7,168.150 $13,400.000 $10,000.000
SET (TY I)(S=3 FT)(HW= 3 FT)(6:1)(P)
EA 2.000 $4,500.000 $4,400.000 $6,250.000 $7,168.150 $4,400.000 $4,200.000
SET (TY I)(S= 5 FT)(HW= 3 FT)(6:1) (P)
EA 2.000 $5,500.000 $6,200.000 $7,850.000 $8,822.340 $6,050.000 $5,500.000
SET (TY I)(S= 6 FT)(HW= 3 FT)(6:1) (P)
EA 4.000 $12,500.000 $9,700.000 $11,750.000 $13,233.510 $9,200.000 $9,000.000
SET (TY I)(S= 6 FT)(HW= 4 FT)(6:1) (P)
EA 2.000 $14,500.000 $9,700.000 $14,230.000 $16,541.890 $8,800.000 $9,300.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 48.000 $900.000 $1,350.000 $1,020.000 $937.370 $1,430.000 $1,400.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 44.000 $1,400.000 $1,400.000 $1,355.000 $1,047.650 $2,050.000 $1,600.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 46.000 $2,300.000 $3,000.000 $3,000.000 $2,756.980 $4,175.000 $3,300.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 16.000 $4,000.000 $4,100.000 $4,100.000 $3,859.770 $5,200.000 $4,400.000
SET (TY II) (42 IN) (RCP) (6: 1) (P)
EA 4.000 $8,000.000 $6,500.000 $8,125.000 $5,513.960 $7,350.000 $6,700.000
REMOV STR (WINGWALL)
EA 4.000 $1,250.000 $500.000 $1,000.000 $1,654.190 $1,800.000 $1,800.000
REMOV STR (PIPE)
LF 679.000 $17.000 $14.000 $17.500 $33.080 $43.000 $50.000
REMOV STR (BOX CULVERT)
LF 70.000 $45.000 $47.000 $26.000 $220.560 $180.000 $400.000
MOBILIZATION
LS 1.000 $380,000.000 $171,000.000 $509,000.000 $350,000.000 $130,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 10.000 $4,500.000 $5,200.000 $1,240.000 $16,741.630 $20,250.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 1,745.000 $35.000 $30.000 $29.000 $29.450 $29.450 $85.000
ROCK FILTER DAMS (REMOVE)
LF 1,745.000 $10.000 $5.000 $9.650 $7.780 $7.780 $1.000
CONSTRUCTION PERIMETER FENCE
LF 200.000 $3.500 $11.000 $5.400 $4.340 $10.000 $15.000
CONC CURB (DOWEL)(SLOTTED)
LF 70.000 $15.000 $31.000 $45.500 $34.690 $70.000 $70.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 63,122.000 $0.170 $0.090 $0.110 $0.220 $0.400 $0.250
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 31,293.000 $0.170 $0.090 $0.150 $0.300 $0.500 $0.250
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 7.000 $230.000 $180.000 $121.000 $180.000 $180.000 $200.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 5.000 $275.000 $200.000 $128.000 $200.000 $200.000 $300.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 14.000 $550.000 $490.000 $540.000 $490.000 $490.000 $700.000
CONDT (PVC) (SCH 80) (2")
LF 75.000 $10.170 $10.000 $18.300 $17.000 $10.000 $20.000
ELEC CONDR (NO.6) BARE
LF 75.000 $1.150 $3.000 $2.100 $1.950 $3.000 $2.400
ELEC CONDR (NO.4) BARE
LF 35.000 $1.580 $3.500 $2.200 $2.050 $3.500 $2.500
ELEC CONDR (NO.4) INSULATED
LF 65.000 $1.810 $3.750 $2.400 $2.250 $3.750 $2.800
TRAY CABLE (4 CONDR) (12 AWG)
LF 305.000 $2.190 $3.000 $2.650 $2.450 $3.000 $3.000
GROUND BOX TY D (162922)W/APRON
EA 3.000 $1,121.400 $725.000 $1,130.000 $1,050.000 $725.000 $1,200.000
ZINC-COAT STL WIRE STRAND (1/4")
LF 445.000 $3.000 $2.750 $3.800 $3.550 $2.750 $4.000
ZINC-COAT STL WIRE STRAND (3/8")
LF 445.000 $4.000 $3.000 $4.200 $3.900 $3.000 $4.500
ELC SRV TY D 120/240 060(NS)SS(E)SP(O)
EA 1.000 $3,748.000 $5,000.000 $6,100.000 $5,650.000 $5,000.000 $6,500.000
ALUMINUM SIGNS (TY A)
SF 84.200 $17.500 $18.000 $18.540 $18.000 $18.000 $22.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 32.000 $437.640 $450.000 $458.000 $450.000 $450.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 1.000 $550.000 $620.000 $717.000 $620.000 $620.000 $725.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $750.000 $640.000 $680.000 $640.000 $640.000 $700.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 21.000 $725.000 $600.000 $890.000 $600.000 $600.000 $900.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 9.000 $825.000 $680.000 $1,233.000 $680.000 $680.000 $1,200.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 6.000 $925.000 $750.000 $1,135.000 $750.000 $750.000 $1,100.000
REMOVE SM RD SN SUP&AM
EA 6.000 $81.170 $70.000 $105.000 $70.000 $70.000 $150.000
RELOCATE SM RD SN SUP & AM TY TEMP
EA 1.000 $95.900 $242.000 $134.000 $250.000 $250.000 $700.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 18.000 $50.000 $60.000 $38.000 $60.000 $60.000 $50.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 127,489.000 $0.230 $0.200 $0.270 $0.250 $0.250 $0.230
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 200.000 $2.500 $3.000 $2.700 $2.500 $2.500 $4.000
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 1.000 $175.000 $75.000 $200.000 $185.000 $185.000 $125.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 6,410.000 $0.260 $0.200 $0.270 $0.250 $0.250 $0.220
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 14,738.000 $0.230 $0.200 $0.270 $0.250 $0.250 $0.220
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 230.000 $5.270 $6.000 $6.450 $6.000 $6.000 $6.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 1.000 $500.000 $650.000 $537.000 $500.000 $500.000 $325.000
REFL PAV MRK TY II (W) 24" (SLD)
LF 30.000 $2.200 $3.000 $1.900 $1.750 $1.750 $6.000
PAVEMENT SEALER 24"
LF 30.000 $0.970 $3.000 $2.150 $2.000 $2.000 $4.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 64,362.000 $0.750 $0.450 $0.430 $0.400 $0.400 $0.420
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 6,410.000 $1.000 $0.450 $0.430 $0.400 $0.400 $0.420
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 14,738.000 $0.750 $0.450 $0.430 $0.400 $0.400 $0.420
REFL PAV MRKR TY II-A-A
EA 508.000 $3.500 $5.000 $4.300 $4.000 $4.000 $4.150
ELIM EXT PAV MRK & MRKS (24")
LF 30.000 $1.670 $5.000 $2.150 $2.000 $2.000 $5.000
PAV SURF PREP FOR MRK (6")
LF 85,510.000 $0.100 $0.010 $0.010 $0.010 $0.010 $0.020
PAV SURF PREP FOR MRK (24")
LF 230.000 $0.340 $0.060 $0.300 $0.250 $0.250 $0.500
PAV SURF PREP FOR MRK (RR XING)
EA 1.000 $100.000 $25.000 $54.000 $50.000 $50.000 $50.000
INSTALL HWY TRF SIG (SYSTEM)
EA 1.000 $28,361.590 $19,000.000 $23,450.000 $21,800.000 $19,000.000 $27,000.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $3,176.070 $1,900.000 $1,880.000 $1,750.000 $1,900.000 $2,000.000
VEH SIG SEC (12")LED(YEL)
EA 8.000 $180.570 $150.000 $231.000 $215.000 $150.000 $220.000
VEH SIG SEC (12")LED(RED)
EA 4.000 $180.270 $150.000 $231.000 $215.000 $150.000 $220.000
BACK PLATE (12")(1 SEC)
EA 12.000 $77.280 $65.000 $59.000 $55.000 $65.000 $70.000
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 1,515.000 $2.030 $4.250 $3.200 $3.000 $4.250 $4.000
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 2.000 $7,000.000 $5,000.000 $4,675.000 $4,350.000 $5,000.000 $5,200.000
INS TRF SIG PL AM (S)STR(TY D)
EA 2.000 $5,500.560 $7,100.000 $7,415.000 $6,900.000 $7,100.000 $7,500.000
INS TRF SIG PL AM (S)STR(TY D)LUM
EA 2.000 $6,750.000 $8,300.000 $8,705.000 $8,100.000 $8,300.000 $8,500.000
FULL - WIDTH MOWING
CYC 3.000 $2,300.000 $1,500.000 $1,615.000 $2,100.000 $1,900.000 $4,500.000
LITTER REMOVAL
CYC 3.000 $1,700.000 $1,500.000 $1,615.000 $600.000 $1,600.000 $2,000.000
DITCH CLEANING AND RESHAPING (FOOT)
LF 60,457.000 $4.000 $1.300 $4.500 $1.900 $2.000 $3.000
D-GR HMA TY-D SAC-A PG70-22
TON 10,506.520 $92.250 $110.000 $96.000 $110.000 $102.000 $125.000
GEOGRID BASE REINFORCEMENT (TY II)
SY 42,613.000 $1.500 $1.250 $2.350 $1.400 $1.300 $5.500
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $6,459.690 $5,600.000 $6,100.000 $5,650.000 $5,600.000 $6,000.000
TMA (STATIONARY)
DAY 50.000 $175.000 $115.000 $235.000 $248.000 $300.000 $450.000
TMA (MOBILE OPERATION)
DAY 100.000 $250.000 $245.000 $10.000 $598.000 $300.000 $300.000
INSTALL OF CELLULAR MODEM
EA 1.000 $250.000 $75.000 $930.000 $865.000 $75.000 $900.000
WWD CELLULAR MODEM
EA 1.000 $3,740.000 $1,500.000 $970.000 $900.000 $1,500.000 $1,000.000
Totals: $4,302,752.790 $5,061,781.120 $5,248,973.233 $5,256,459.732 $6,166,888.650 $6,874,454.880