WALLER FM 362 (0523-02-050)

Items: 71

County: WALLER
Length: N/A
Highway: FM 362
District: HOUSTON
Control Number: 0523-02-050
DBE Goal: N/A
Project: C 523-2-50
Guaranty: N/A
Time: 64 WORKING DAYS
Engineer's Estimate: $3,687,425.40
Date: 03/04/2022 (4 years ago)
Contract Number: N/A
Type: BASE REPAIR, PLANING, SEAL COAT, 1.5" PFC OL
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (6)
E
Engineer's Estimate
$3,687,425.40
$3,607,335.29
Over/Under Est: -2.17% -$80,090.11
Over/Under Est: -1.11% -$41,000.12
Amt Left: 1.08% $39,089.99
Over/Under Est: -0.37% -$13,515.23
Amt Left: 1.85% $66,574.88
Delta: -0.75% -$27,484.89
Over/Under Est: -0.01% -$226.16
Amt Left: 2.21% $79,863.95
Delta: -0.36% -$13,289.07
Over/Under Est: 7.44% $274,181.40
Amt Left: 9.82% $354,271.51
Delta: -7.44% -$274,407.56
Over/Under Est: 30.15% $1,111,678.22
Amt Left: 33.04% $1,191,768.33
Delta: -21.14% -$837,496.82

Bid Items & Bid Tabulations

71 Total 0 of 71
WALLER  |  FM 362  |  HOUSTON  |  0523-02-050  |  03/04/2022  |  $3,687,425.40  |  C 523-2-50  |  BASE REPAIR, PLANING, SEAL COAT, 1.5...  |  64 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DURWOOD GREENE CONSTRUCTION CO.
JAMES CONSTRUCTION GROUP, LLC
TEXAS MATERIALS GROUP, INC.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
KNIFE RIVER CORPORATION - SOUTH
VULCAN MATERIALS ASPHALT AND CONSTRUCTION, LLC
EXCAVATION (ROADWAY)
CY 177.000 $6.910 $40.000 $10.000 $70.000 $180.000 $39.000 $67.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 177.000 $7.190 $40.000 $10.000 $48.000 $180.000 $83.000 $67.000
BACKFILL (TY A OR B)
STA 437.680 $164.380 $100.000 $93.000 $210.000 $180.000 $107.350 $149.000
BLOCK SODDING
SY 1,595.000 $2.960 $4.500 $5.000 $4.000 $5.000 $5.430 $5.500
STRAW OR HAY MULCH
SY 38.000 $0.190 $10.000 $10.000 $6.000 $10.000 $11.000 $11.500
BROADCAST SEED (TEMP) (WARM)
SY 24.000 $0.100 $5.000 $10.000 $5.000 $10.000 $11.000 $11.500
DRILL SEED (TEMP)(WARM OR COOL)
SY 14.000 $0.090 $5.000 $75.000 $2.000 $75.000 $82.000 $85.500
FERTILIZER
AC 0.420 $553.730 $1,200.000 $1,200.000 $100.000 $1,200.000 $1,303.000 $1,367.000
VEGETATIVE WATERING
MG 50.400 $18.670 $40.000 $46.000 $30.000 $20.000 $60.000 $281.000
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
CY 30.000 $79.670 $150.000 $161.000 $266.000 $305.000 $173.000 $438.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 251.360 $83.730 $100.000 $130.000 $128.000 $140.000 $235.000 $164.000
ASPH (MULTI OPTION)
GAL 34,869.000 $2.990 $3.450 $3.600 $3.600 $3.800 $3.790 $3.500
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 895.000 $124.240 $130.000 $137.000 $200.000 $144.000 $214.000 $175.000
PFC (ASPHALT) PG76-22
TON 484.020 $110.000 $155.000 $138.500 $150.000 $160.000 $153.000 $170.000
PFC-C (AGGREGATE)(PG76 MIX) SAC-A
TON 6,961.380 $128.190 $155.000 $138.500 $150.000 $160.000 $153.000 $170.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 10,800.000 $42.000 $10.000 $35.000 $33.000 $36.000 $38.460 $82.500
PLANE ASPH CONC PAV (1.5")
SY 78,054.000 $1.070 $2.000 $1.550 $1.300 $1.150 $1.000 $2.500
PLANE ASPH CONC PAV (2")
SY 107,698.000 $2.150 $2.500 $1.800 $1.400 $1.450 $1.000 $3.000
RIPRAP (MOW STRIP)(4 IN)
CY 91.000 $482.330 $750.000 $438.000 $600.000 $625.000 $600.000 $510.000
MOBILIZATION
LS 1.000 $322,000.000 $125,000.000 $203,000.000 $110,000.000 $100,000.000 $180,000.001 $100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $16,000.000 $4,000.000 $16,500.000 $3,000.000 $2,500.000 $16,000.000 $28,535.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 74,371.000 $0.140 $0.250 $0.210 $0.100 $0.200 $0.100 $0.100
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 43,361.000 $0.140 $0.250 $0.260 $0.100 $0.200 $0.130 $0.100
MTL W-BEAM GD FEN (TIM POST)
LF 1,500.000 $24.730 $25.000 $22.180 $24.000 $28.650 $24.100 $28.500
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,872.800 $2,200.000 $1,859.000 $1,900.000 $1,950.000 $2,020.000 $2,449.000
REMOVE METAL BEAM GUARD FENCE
LF 1,500.000 $2.330 $2.000 $1.900 $2.000 $0.950 $2.000 $2.500
GUARDRAIL END TREATMENT (INSTALL)
EA 14.000 $2,981.980 $3,500.000 $3,042.000 $3,200.000 $3,250.000 $3,305.000 $3,531.000
GUARDRAIL END TREATMENT (REMOVE)
EA 14.000 $196.990 $300.000 $261.000 $276.000 $275.000 $284.000 $171.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 40.000 $216.920 $250.000 $212.000 $225.000 $230.000 $230.000 $290.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 5.000 $218.750 $300.000 $228.000 $242.000 $320.000 $248.000 $370.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 11.000 $496.670 $700.000 $581.000 $616.000 $772.000 $631.000 $786.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 9.000 $22.900 $26.000 $23.210 $25.000 $20.000 $26.000 $30.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 136.000 $409.630 $500.000 $440.000 $466.000 $475.000 $478.000 $484.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $597.600 $600.000 $547.000 $580.000 $600.000 $594.000 $621.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $649.370 $1,100.000 $998.000 $1,058.000 $1,100.000 $1,084.000 $1,128.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 19.000 $715.780 $900.000 $817.000 $866.000 $925.000 $888.000 $917.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 11.000 $753.080 $1,100.000 $991.000 $1,050.000 $1,112.000 $1,077.000 $1,185.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 1.000 $979.430 $950.000 $873.000 $925.000 $1,150.000 $949.000 $1,156.000
REMOVE SM RD SN SUP&AM
EA 184.000 $59.330 $50.000 $42.000 $44.000 $52.000 $46.000 $62.500
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 35.000 $40.060 $35.000 $30.000 $31.000 $30.000 $33.000 $28.500
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 6.000 $26.320 $25.000 $20.000 $21.000 $30.000 $22.000 $27.500
INSTL OM ASSM (OM-2Y)(WC)GND
EA 28.000 $55.240 $70.000 $60.000 $63.000 $65.000 $65.000 $74.000
INSTL DEL ASSM (D-SW)SZ 1(WFLX)GND(BI)
EA 38.000 $74.180 $90.000 $80.000 $63.000 $75.000 $87.000 $68.500
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 91,408.000 $0.230 $0.280 $0.260 $0.260 $0.260 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 91,408.000 $0.240 $0.280 $0.260 $0.260 $0.260 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 788.000 $0.360 $0.500 $0.420 $0.420 $0.420 $0.460 $0.500
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 96.000 $0.860 $2.000 $1.500 $1.500 $1.500 $1.630 $1.500
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 386.000 $1.810 $3.500 $3.000 $3.000 $3.000 $3.260 $3.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 6.000 $47.100 $60.000 $55.000 $55.000 $55.000 $60.000 $62.500
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 6.000 $50.040 $60.000 $55.000 $55.000 $55.000 $60.000 $62.500
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 8,645.000 $0.250 $0.280 $0.260 $0.260 $0.450 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 42,941.000 $0.240 $0.280 $0.260 $0.260 $0.260 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 8,645.000 $0.240 $0.280 $0.260 $0.260 $0.260 $0.280 $0.300
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 42,941.000 $0.250 $0.280 $0.260 $0.260 $0.260 $0.280 $0.300
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 394.000 $0.810 $1.000 $0.800 $1.060 $0.800 $0.870 $0.900
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 48.000 $2.370 $4.000 $3.500 $3.700 $3.500 $3.800 $4.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 193.000 $4.940 $8.000 $7.000 $7.000 $7.000 $7.600 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 3.000 $70.400 $130.000 $125.000 $125.000 $125.000 $136.000 $142.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 3.000 $77.630 $150.000 $135.000 $135.000 $135.000 $147.000 $154.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 91,408.000 $0.460 $0.500 $0.490 $0.490 $0.490 $0.530 $0.550
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 8,645.000 $0.440 $0.500 $0.490 $0.490 $0.450 $0.530 $0.550
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 42,941.000 $0.510 $0.500 $0.490 $0.490 $0.490 $0.530 $0.550
REFL PAV MRKR TY I-C
EA 46.000 $4.280 $4.000 $4.000 $4.250 $4.000 $4.350 $4.500
REFL PAV MRKR TY II-A-A
EA 1,042.000 $4.190 $4.000 $4.000 $4.250 $4.000 $4.350 $4.500
REMOVE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $295.060 $1,000.000 $750.000 $780.000 $750.000 $815.000 $854.000
D-GR HMA TY-D SAC-A PG70-22
TON 6,440.530 $110.000 $130.000 $105.000 $125.000 $113.000 $125.500 $125.000
D-GR HMA TY-D SAC-A PG76-22
TON 312.990 $100.000 $180.000 $157.000 $210.000 $110.000 $146.000 $293.000
TACK COAT
GAL 8,592.000 $2.590 $2.000 $2.300 $3.000 $3.500 $3.150 $3.500
TMA (STATIONARY)
DAY 22.000 $281.400 $400.000 $298.000 $130.000 $75.000 $500.000 $294.000
TMA (MOBILE OPERATION)
DAY 154.000 $423.880 $50.000 $648.000 $15.000 $75.000 $800.000 $28.500
LEAD LED CHEVRON
EA 1.000 $4,500.000 $9,500.000 $8,500.000 $9,500.000 $8,500.000 $9,300.000 $9,683.000
Totals: $3,687,425.398 $3,607,335.290 $3,646,425.280 $3,673,910.170 $3,687,199.240 $3,961,606.814 $4,799,103.620