WALLER FM 362 (0523-02-049)

Items: 78

County: WALLER
Length: N/A
Highway: FM 362
District: HOUSTON
Control Number: 0523-02-049
DBE Goal: N/A
Project: STP 2020(502)
Guaranty: N/A
Time: 98 WORKING DAYS
Engineer's Estimate: $6,346,545.84
Date: 01/09/2020 (6 years ago)
Contract Number: N/A
Type: SEAL COAT, 1.5 IN ACP OL, SHLDR WIDENING, CL TEX
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$6,346,545.84
$5,288,985.33
Over/Under Est: -16.66% -$1,057,560.51
Over/Under Est: -15.11% -$959,268.12
Amt Left: 1.86% $98,292.39
Over/Under Est: -7.92% -$502,799.82
Amt Left: 10.49% $554,760.69
Delta: -8.47% -$456,468.30
Over/Under Est: 0.82% $51,822.72
Amt Left: 20.98% $1,109,383.23
Delta: -9.49% -$554,622.54

Bid Items & Bid Tabulations

78 Total 0 of 78
WALLER  |  FM 362  |  HOUSTON  |  0523-02-049  |  01/09/2020  |  $6,346,545.84  |  STP 2020(502)  |  SEAL COAT, 1.5 IN ACP OL, SHLDR WID...  |  98 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, L.L.C.
DURWOOD GREENE CONSTRUCTION CO.
ANGEL BROTHERS HOLDINGS CORP.
SMITH & COMPANY (VULCAN CONSTRUCTION)
PREPARING ROW
STA 623.050 $100.000 $105.000 $200.000 $484.000 $135.000
EXCAVATION (ROADWAY)
CY 6,599.000 $13.890 $5.200 $20.000 $5.000 $13.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 4,159.000 $11.160 $10.000 $15.000 $15.000 $27.000
BACKFILL (TY A OR B)
STA 623.050 $215.000 $1.000 $75.000 $8.000 $300.000
BLOCK SODDING
SY 88,310.000 $2.640 $0.010 $1.050 $0.250 $3.000
STRAW OR HAY MULCH
SY 44,155.000 $0.200 $0.170 $0.200 $0.200 $0.200
BROADCAST SEED (TEMP) (WARM)
SY 44,155.000 $0.120 $0.080 $0.200 $0.100 $0.150
FERTILIZER
AC 27.490 $738.000 $750.000 $600.000 $790.000 $500.000
VEGETATIVE WATERING
MG 3,298.800 $6.040 $4.000 $3.000 $18.000 $25.000
FL BS (CMP IN PLC)(TY D GR 4)(FNAL POS)
CY 10.000 $130.000 $460.000 $200.000 $100.000 $425.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 15,434.600 $78.000 $62.000 $78.000 $80.000 $75.000
ASPH (MULTI OPTION)
GAL 101,743.000 $3.220 $3.000 $2.500 $2.700 $3.000
AGGR (TY-PB GR-4 OR TY-PL GR-4 ( SAC-B)
CY 2,554.000 $124.000 $125.000 $110.000 $82.000 $115.000
D-GR HMA TY-D SAC-A PG70-22
TON 26,917.130 $94.000 $79.000 $87.000 $86.000 $92.000
PLANE ASPH CONC PAV (2")
SY 3,738.000 $2.630 $1.150 $0.500 $2.800 $3.500
PLANE ASPH CONC PAV (1/2")
SY 227,227.000 $0.700 $1.150 $0.500 $1.090 $0.850
PLANE ASPH CONC PAV (1/2" TO 2")
SY 2,595.000 $1.250 $1.150 $0.500 $1.900 $4.250
STRUCT EXCAV (PIPE)
CY 14.000 $10.710 $14.000 $75.000 $20.000 $33.000
CEM STABIL BKFL
CY 42.000 $41.330 $25.000 $90.000 $80.000 $50.000
RC PIPE (CL III)(24 IN)
LF 20.000 $75.000 $315.000 $350.000 $82.000 $150.000
RC PIPE (CL III)(30 IN)
LF 32.000 $91.000 $185.000 $360.000 $91.000 $130.000
RC PIPE (CL III)(36 IN)
LF 16.000 $103.000 $394.000 $450.000 $127.000 $230.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 5.000 $1,418.000 $1,300.000 $1,800.000 $1,125.000 $1,200.000
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 4.000 $2,204.000 $1,800.000 $3,350.000 $2,110.000 $2,500.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 4.000 $3,708.000 $3,000.000 $4,700.000 $2,950.000 $3,250.000
REMOV STR (SET)
EA 13.000 $183.000 $263.000 $500.000 $550.000 $225.000
MOBILIZATION
LS 1.000 $580,000.000 $355,000.000 $100,000.000 $470,000.000 $250,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 7.000 $5,800.000 $9,500.000 $3,200.000 $750.000 $40,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 1,020.000 $29.450 $25.000 $40.000 $26.500 $30.000
ROCK FILTER DAMS (REMOVE)
LF 1,020.000 $11.580 $9.000 $10.000 $9.500 $10.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 30.000 $5.140 $5.000 $30.000 $5.250 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 30.000 $1.090 $1.000 $5.000 $1.250 $1.000
DRIVEWAYS (ACP)
SY 1,580.000 $17.180 $12.000 $21.000 $32.750 $42.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 116,906.000 $0.240 $0.150 $0.230 $0.200 $0.150
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 53,696.000 $0.260 $0.140 $0.250 $0.250 $0.150
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 14.000 $207.000 $295.000 $200.000 $313.000 $125.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 4.000 $224.000 $355.000 $250.000 $375.000 $150.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 2.000 $484.000 $690.000 $500.000 $727.000 $400.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 31.500 $28.380 $26.000 $25.000 $25.000 $20.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 74.000 $530.000 $357.000 $380.000 $376.000 $360.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 7.000 $584.000 $484.000 $490.000 $510.000 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 1.000 $605.000 $480.000 $500.000 $505.000 $460.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 27.000 $360.000 $616.000 $620.000 $650.000 $600.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 13.000 $720.000 $714.000 $780.000 $752.000 $725.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 2.000 $773.000 $685.000 $760.000 $722.000 $700.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 11.000 $851.000 $840.000 $790.000 $885.000 $750.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 76.000 $83.000 $48.000 $65.000 $51.000 $62.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 12.000 $58.000 $48.000 $75.000 $51.000 $68.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 9.000 $32.000 $38.000 $55.000 $40.000 $49.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 246,914.000 $0.230 $0.270 $0.180 $0.300 $0.200
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 123,457.000 $0.400 $0.300 $0.250 $0.320 $0.250
WK ZN PAV MRK NON-REMOV (W)8"(DOT)
LF 100.000 $0.360 $1.000 $0.600 $1.100 $0.600
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 2,402.000 $0.550 $0.400 $0.550 $0.420 $0.550
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 578.000 $2.080 $2.000 $2.500 $2.150 $2.500
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 34.000 $51.000 $50.000 $75.000 $53.000 $75.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 18.000 $63.000 $60.000 $75.000 $64.000 $75.000
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 13,670.000 $0.240 $0.300 $0.250 $0.320 $0.250
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 34,783.000 $0.230 $0.280 $0.220 $0.290 $0.250
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 13,670.000 $0.380 $0.300 $0.300 $0.320 $0.300
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 34,783.000 $0.410 $0.300 $0.250 $0.320 $0.250
WK ZN PAV MRK NON-REMOV (Y)24"(SLD)
LF 72.000 $2.970 $3.000 $2.500 $3.200 $2.500
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 50.000 $1.070 $2.000 $4.000 $2.150 $4.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,201.000 $0.950 $0.800 $1.750 $0.850 $2.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 289.000 $5.970 $6.000 $8.000 $6.350 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 17.000 $128.000 $130.000 $150.000 $137.000 $150.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 9.000 $177.000 $150.000 $165.000 $160.000 $165.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 36.000 $5.410 $10.000 $8.000 $10.500 $8.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 123,457.000 $0.410 $0.400 $0.500 $0.430 $0.500
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 13,670.000 $0.420 $0.400 $0.700 $0.430 $0.700
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 34,783.000 $0.400 $0.400 $0.650 $0.430 $0.650
REFL PAV MRKR TY I-C
EA 60.000 $4.800 $4.000 $8.000 $4.250 $8.000
REFL PAV MRKR TY II-A-A
EA 1,664.000 $4.700 $4.000 $5.000 $4.250 $5.000
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 10.000 $2,000.000 $1,922.000 $2,100.000 $1,425.000 $2,500.000
FULL - WIDTH MOWING
CYC 3.000 $1,433.000 $2,045.000 $1,200.000 $7,900.000 $3,000.000
LITTER REMOVAL
CYC 3.000 $1,433.000 $3,040.000 $500.000 $2,700.000 $3,000.000
LED CHEVRON
EA 1.000 $4,500.000 $17,281.250 $19,000.000 $4,000.000 $4,000.000
TMA (STATIONARY)
DAY 17.000 $215.000 $260.000 $350.000 $325.000 $450.000
TMA (MOBILE OPERATION)
DAY 360.000 $135.000 $600.000 $25.000 $20.000 $100.000
Totals: $6,346,545.842 $5,288,985.330 $5,387,277.720 $5,843,746.020 $6,398,368.560