Show Job Controls
Bid Cobra

WALLER IH 10 (0271-04-071)

Items: 396

County: WALLER
Length: N/A
Highway: IH 10
District: HOUSTON
Control Number: 0271-04-071
DBE Goal: N/A
Project: NH 1702(007)
Guaranty: N/A
Time: 1391 WORKING DAYS
Engineer's Estimate: $142,378,747.21
Date: 06/07/2017 (9 years ago)
Contract Number: N/A
Type: CONST 1 MORE ML EACH DIRECTION AND REPLACE BRIDGES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$142,378,747.21
Over/Under Est: -0.62% -$882,269.11
Over/Under Est: 0.38% $543,136.69
Amt Left: 1.01% $1,425,405.80
Over/Under Est: 3.01% $4,281,992.01
Amt Left: 3.65% $5,164,261.12
Delta: -2.62% -$3,738,855.32
$149,830,396.24
Over/Under Est: 5.23% $7,451,649.03
Amt Left: 5.89% $8,333,918.14
Delta: -2.16% -$3,169,657.02
$152,474,810.66
Over/Under Est: 7.09% $10,096,063.45
Amt Left: 7.76% $10,978,332.56
Delta: -1.76% -$2,644,414.42
Subcontractor Percentage Amount
ALLSTATE SIGNAL & CONSTRUCTION, LLC 3.74% $5,860,270.38
TEXAS ENVIRONMENTAL MANAGEMENT - SAN ANTONIO, INC. 1.65% $2,585,413.40
VACA UNDERGROUND UTILITIES INC 1.36% $2,131,007.41
AREA WIDE PROTECTIVE, INC. 0.93% $1,457,233.01
PROFESSIONAL TRAFFIC CONTROL LLC 0.90% $1,410,225.49
ROADWAY SPECIALTIES, INC. 0.87% $1,363,217.98
LG & G CONSTRUCTION COMP. 0.74% $1,159,518.74
ROADWAY CONSTRUCTION, INC. 0.43% $673,774.40
BROOKLYN SWEEPS, INCORPORATED 0.22% $344,721.79
BATTEN DRILLING, INC. 0.20% $313,383.44
HIGHWAY PAVEMENT SPECIALTIES, INC. 0.18% $282,045.10
SK CONCRETE SERVICES LLC 0.12% $188,030.07
BAY CITY TRAFFIC 0.11% $172,360.89
P&Z LOGISTICS INC. 0.11% $172,360.89
WEST TEXAS ROCK RESOURCES, LLC 0.05% $78,345.86
SWEEPING CORPORATION OF AMERICA, LLC 0.05% $78,345.86
SCOTT DERR PAINTING CO, LLC 0.04% $62,676.69
CHIRON COMMUNICATION SERVICES, LLC 0.02% $31,338.34
CPAVE, INC. 0.01% $15,669.17
A-CORE CONCRETE CUTTING OF TEXAS, INC. 0.01% $15,669.17
ASHTON SAWING AND DRILLING LLC 0.01% $15,669.17
SHAW DRILLING, LLC 0.00% $0.00
Total: 11.75% $18,411,277.25

Bid Items & Bid Tabulations

396 Total 0 of 396
WALLER  |  IH 10  |  HOUSTON  |  0271-04-071  |  06/07/2017  |  $142,378,747.21  |  NH 1702(007)  |  CONST 1 MORE ML EACH DIRECTION AND R...  |  1391 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
WILLIAMS BROTHERS CONSTRUCTION CO., INC.
JAMES CONSTRUCTION GROUP, L.L.C.
BALFOUR BEATTY INFRASTRUCTURE, INC.
PULICE CONSTRUCTION, INC.
WEBBER, LLC
PREPARING ROW
AC 325.000 $1,100.000 $43,600.000 $4,508.000 $7,500.000 $12,000.000 $26,484.160
REMOVING CONC (PAV)
SY 428,772.000 $5.970 $6.000 $3.000 $4.000 $3.410 $5.170
REMOVING CONC (RIPRAP)
SY 29,069.000 $6.600 $4.000 $4.000 $4.000 $1.390 $11.050
REMOVING CONC (MEDIANS)
SY 28.000 $8.530 $10.000 $20.000 $4.000 $5.160 $48.140
REMOVING CONC (CTB)
LF 21,980.000 $5.500 $4.000 $8.000 $5.000 $2.060 $10.930
REMOVING CONC (RETAINING WALLS)
SY 200.000 $29.300 $50.000 $30.000 $30.000 $6.190 $40.910
REMOVING STAB BASE & ASPH PAV(12"-27")
SY 28,009.000 $6.600 $7.000 $5.000 $6.700 $7.840 $8.110
REMOV STAB BASE AND ASPH PAV (0"-12")
SY 402,251.000 $3.300 $4.000 $3.000 $1.150 $2.910 $5.640
EXCAVATION (ROADWAY)
CY 354,199.040 $9.370 $8.000 $6.000 $4.950 $5.000 $7.740
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 497,989.420 $7.320 $3.000 $6.000 $6.900 $2.000 $6.950
EMBANK(FINAL)(DC)(TY E)(CSBE)
CY 17,913.000 $39.140 $30.000 $40.000 $30.000 $35.000 $8.670
COMPOST MANUF TOPSOIL (4")
SY 368,856.000 $1.560 $1.000 $0.630 $0.640 $0.630 $0.630
BLOCK SODDING
SY 396,193.000 $2.960 $2.750 $2.650 $2.680 $2.650 $2.650
STRAW OR HAY MULCH
SY 1,133,904.000 $0.280 $0.200 $0.200 $0.200 $0.200 $0.200
DRILL SEED (TEMP)(WARM OR COOL)
SY 765,049.000 $0.190 $0.150 $0.050 $0.050 $0.050 $0.050
DRILL SEEDING (PERM)(WARM OR COOL)
SY 368,856.000 $0.220 $0.150 $0.120 $0.120 $0.120 $0.120
FERTILIZER
AC 327.000 $800.400 $650.000 $674.500 $681.520 $647.500 $674.500
VEGETATIVE WATERING
MG 39,240.000 $22.120 $15.000 $19.750 $14.000 $19.750 $19.750
LIME TRT (EXST MATL) (6")
SY 534,437.000 $2.120 $1.500 $2.000 $2.250 $1.500 $2.320
LIME(HYD,COM OR QK)(SLRY)OR QK(DRY)
TON 7,247.000 $175.730 $160.000 $155.000 $150.000 $160.000 $154.500
CEM TRT(PLNT MX) (CL N)(TY E)(GR 4)(6")
SY 534,437.000 $5.900 $4.000 $9.000 $5.950 $5.000 $6.950
ASPHALT STAB BASE (GR 4)(PG 64)
TON 29,431.000 $67.310 $60.000 $83.340 $78.320 $81.020 $76.500
SALV, HAUL & STKPL RCL APH PV (0"TO 4")
SY 23,847.000 $3.750 $1.500 $2.000 $1.600 $0.950 $0.170
SALV,HAUL& STKPL RCL APH PV(VAR DEPTH)
SY 386,025.000 $3.300 $4.000 $2.750 $1.600 $2.730 $0.370
SALV,HAUL & STKPL RCL APH PV (2")
SY 79,867.000 $1.550 $1.500 $1.430 $1.340 $0.840 $0.160
ASPH (MULTI OPTION)
GAL 30,665.000 $2.550 $4.000 $3.330 $3.170 $3.200 $3.000
AGGR(TY-PB GR-4 SAC-B)
CY 799.000 $96.370 $101.000 $126.670 $142.760 $143.910 $135.000
D-GR HMA TY-D SAC-A PG70-22
TON 2,066.000 $81.430 $75.000 $113.340 $84.620 $93.810 $82.000
D-GR HMA TY-D SAC-B PG70-22
TON 6,591.000 $85.330 $68.000 $93.340 $81.440 $104.890 $81.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(3")
SY 1,500.000 $24.500 $60.000 $26.670 $25.000 $33.310 $27.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13")
SY 2,000.000 $50.000 $75.000 $106.670 $75.000 $92.170 $80.000
PLANE ASPH CONC PAV (1.5")
SY 23,847.000 $2.410 $2.000 $2.000 $1.510 $2.700 $1.000
CONC PVMT (CONT REINF - CRCP) (10")
SY 102,193.000 $53.630 $35.000 $54.000 $44.000 $48.000 $45.970
CONC PVMT (CONT REINF - CRCP) (14")
SY 417,981.000 $37.150 $37.360 $61.660 $58.000 $51.000 $56.190
CONC PVMT (CONT REINF)(FAST TRK)(13")
SY 14,587.000 $100.030 $84.000 $82.000 $85.000 $65.000 $73.290
CEM STABIL BKFL
CY 15,012.500 $42.890 $31.450 $40.000 $41.000 $35.000 $42.310
CUT & RESTORING PAV
SY 290.000 $110.000 $176.350 $90.000 $115.000 $85.000 $67.050
CEMENT STAB BACKFILL (INLET OR MH)
CY 1,691.500 $44.390 $31.450 $40.000 $41.000 $70.000 $42.300
FLOWABLE BACKFILL
CY 328.000 $174.590 $150.500 $300.000 $110.000 $200.000 $348.460
TRENCH EXCAVATION PROTECTION
LF 32,463.000 $2.660 $1.350 $1.000 $2.000 $3.000 $1.080
TEMPORARY SPL SHORING
SF 74,643.000 $8.000 $1.000 $15.000 $15.000 $15.780 $10.570
PRESTR CONC PIL (18 IN SQ)
LF 18,012.000 $100.000 $60.000 $48.000 $78.000 $100.000 $67.260
PRESTR CONC PIL (20 IN SQ)
LF 8,928.000 $140.000 $65.000 $58.000 $83.000 $110.000 $86.820
SOIL NAIL ANCHORS
LF 7,040.000 $41.800 $20.000 $20.000 $19.250 $18.680 $20.000
DRILL SHAFT (18 IN)
LF 304.000 $130.000 $100.000 $45.000 $43.000 $35.000 $36.560
DRILL SHAFT (30 IN)
LF 6,881.000 $150.000 $125.000 $140.000 $95.000 $92.000 $84.630
DRILL SHAFT (36 IN)
LF 1,386.000 $190.000 $175.000 $100.000 $143.000 $132.000 $129.430
DRILL SHAFT (42 IN)
LF 6,123.000 $260.000 $225.000 $150.000 $185.000 $180.000 $164.270
DRILL SHAFT (48 IN)
LF 24.000 $220.000 $350.000 $220.000 $311.000 $380.000 $308.000
DRILL SHAFT (84 IN)
LF 540.000 $700.000 $800.000 $750.000 $770.000 $750.000 $684.400
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 48.000 $66.670 $68.000 $69.450 $68.710 $75.000 $68.000
DRILL SHAFT (SIGN MTS) (36 IN)
LF 416.000 $501.000 $175.000 $229.790 $227.340 $180.000 $160.630
DRILL SHAFT (SIGN MTS) (42 IN)
LF 1,018.000 $201.110 $250.000 $283.930 $280.890 $200.000 $215.200
DRILL SHAFT (SIGN MTS) (48 IN)
LF 260.000 $275.000 $350.000 $413.630 $409.220 $250.000 $279.170
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 1,360.000 $522.500 $474.000 $484.100 $478.930 $483.510 $474.000
DRILL SHAFT (HIGH MAST POLE) (66 IN)
LF 384.000 $605.000 $543.000 $554.570 $548.650 $553.890 $543.000
DRILL SHAFT (TRF SIG POLE) (36 IN)
LF 15.200 $283.990 $200.000 $204.260 $202.080 $204.010 $200.000
DRILL SHAFT (TRF SIG POLE) (48 IN)
LF 66.000 $396.560 $305.000 $311.500 $308.180 $311.120 $305.000
CL A CONC (DITCH INTERCEPTOR STRUCTURE)
CY 43.000 $470.460 $1,356.000 $1,200.000 $385.000 $651.020 $7,178.480
CL C CONC (ABUT)
CY 1,787.100 $960.000 $750.000 $900.000 $670.000 $882.430 $884.660
CL C CONC (CAP)
CY 853.200 $770.000 $1,000.000 $800.000 $800.000 $1,178.220 $742.270
CL C CONC (COLUMN)
CY 1,119.100 $825.000 $1,100.000 $1,000.000 $875.000 $1,567.220 $818.310
CL C CONC (FOOTING)
CY 292.600 $680.000 $1,200.000 $800.000 $600.000 $845.480 $706.880
CL C CONC (SIGN COLUMN)
CY 436.670 $983.000 $800.000 $1,000.000 $1,200.000 $1,553.110 $1,240.020
CL F CONC (CAP)
CY 1,302.000 $680.000 $800.000 $700.000 $825.000 $1,242.320 $767.990
CL C CONC (SIGN FOOTING)
CY 162.800 $540.750 $800.000 $900.000 $675.000 $616.860 $882.450
REINF CONC SLAB
SF 385,192.400 $15.000 $10.000 $12.000 $11.200 $13.000 $16.630
BRIDGE MEDIAN
SF 1,440.000 $16.000 $9.000 $9.000 $6.750 $7.000 $21.530
BRIDGE SIDEWALK
SF 3,600.000 $10.000 $9.000 $9.000 $7.500 $9.000 $14.550
RETAINING WALL (TEMP WALL)
SF 118,422.000 $12.130 $10.000 $12.000 $8.000 $10.000 $10.030
RETAINING WALL (MSE)(HORIZONTAL SCHEME)
SF 60,456.000 $38.570 $30.000 $22.000 $70.000 $34.000 $40.060
RETAINING WALL (SOIL NAIL)(FACIA)
SF 4,829.000 $38.750 $30.000 $24.000 $50.000 $45.000 $35.870
PRESTR CONC GIRDER (TX28)
LF 17,667.910 $94.000 $75.000 $100.000 $105.000 $115.000 $103.250
PRESTR CONC GIRDER (TX34)
LF 6,952.000 $110.000 $80.000 $118.010 $110.000 $120.000 $108.580
PRESTR CONC GIRDER (TX46)
LF 3,999.590 $130.000 $95.000 $110.000 $115.000 $120.000 $113.370
PRESTR CONC GIRDER (TX54)
LF 26,960.800 $135.000 $100.000 $120.000 $120.000 $130.000 $116.490
RIPRAP (CONC)(4 IN)
CY 61.600 $450.000 $450.000 $375.000 $325.000 $326.470 $306.000
RIPRAP (CONC)(5 IN)
CY 4,686.000 $450.000 $450.000 $250.000 $385.000 $350.000 $306.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 1,738.500 $450.000 $450.000 $250.000 $385.000 $483.110 $326.400
RIPRAP (CONC) (CL B) (4")
CY 126.400 $443.590 $450.000 $400.000 $400.000 $440.000 $306.000
RIPRAP (STONE TY R)(DRY)(12 IN)
CY 15.000 $121.040 $130.000 $250.000 $150.000 $480.400 $125.000
RIPRAP (STONE TY R)(DRY)(18 IN)
CY 200.000 $127.590 $135.000 $150.000 $150.000 $532.990 $135.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 859.000 $137.500 $130.000 $130.000 $150.000 $167.890 $130.000
RIPRAP (STONE COMMON)(DRY)(18 IN)
CY 396.000 $190.510 $200.000 $100.000 $150.000 $181.040 $130.000
RIPRAP (MOW STRIP)(4 IN)
CY 1,601.000 $537.990 $500.000 $500.000 $400.000 $393.740 $357.000
RIPRAP (STONE COMMON)(GROUT)(18 IN)
CY 394.000 $171.200 $300.000 $150.000 $185.000 $156.760 $240.000
RIPRAP (STONE COMMON)(DRY)(VAR. DEPTH)
CY 231.000 $151.000 $130.000 $150.000 $150.000 $173.960 $200.000
STR STEEL (MISC NON - BRIDGE)
LB 336.000 $14.000 $10.000 $6.000 $10.000 $7.050 $10.190
RAIL (TY T221)
LF 3,726.000 $120.000 $30.000 $35.000 $46.000 $38.780 $37.000
RAIL (TY SSTR)
LF 2,808.000 $33.000 $30.000 $30.000 $46.000 $40.780 $37.810
RAIL (TY C221)
LF 512.000 $120.000 $70.000 $70.000 $72.000 $63.590 $52.730
RAIL (HANDRAIL)(TY F)
LF 800.000 $96.330 $80.000 $65.000 $95.000 $76.910 $62.370
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 76,109.000 $35.000 $30.000 $30.000 $45.000 $39.780 $37.880
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 3,894.000 $110.000 $100.000 $60.000 $64.000 $113.100 $74.270
CMP (GAL STL 18 IN)
LF 540.000 $61.230 $94.950 $80.000 $40.000 $69.400 $50.680
CONC BOX CULV (4 FT X 3 FT)
LF 790.000 $134.320 $107.300 $140.000 $135.000 $180.000 $103.490
CONC BOX CULV (5 FT X 3 FT)
LF 1,498.000 $186.290 $135.300 $150.000 $175.000 $190.000 $130.440
CONC BOX CULV (6 FT X 3 FT)
LF 1,698.000 $307.850 $163.800 $190.000 $190.000 $200.000 $142.540
CONC BOX CULV (6 FT X 4 FT)
LF 911.000 $208.950 $175.350 $200.000 $210.000 $210.000 $156.260
CONC BOX CULV (8 FT X 4 FT)
LF 1,018.000 $581.290 $227.250 $250.000 $300.000 $350.000 $203.550
CONC BOX CULV (12 FT X 6 FT)
LF 353.000 $900.000 $483.100 $530.000 $560.000 $700.000 $621.030
CONC BOX CULV (8 FT X 3 FT)
LF 1,485.000 $550.000 $219.350 $240.000 $270.000 $340.000 $197.290
RC PIPE (CL III)(18 IN)
LF 6,558.000 $70.250 $49.950 $65.000 $50.000 $60.000 $30.910
RC PIPE (CL III)(24 IN)
LF 21,787.000 $51.580 $51.600 $65.000 $54.000 $65.000 $34.170
RC PIPE (CL III)(30 IN)
LF 533.000 $84.980 $55.500 $65.000 $65.000 $70.000 $58.890
RC PIPE (CL III)(36 IN)
LF 1,788.000 $86.990 $65.500 $75.000 $70.000 $75.000 $54.340
RC PIPE (CL III)(42 IN)
LF 1,355.000 $112.970 $77.450 $80.000 $80.000 $85.000 $67.310
INLET (COMPL)(TY AD)
EA 4.000 $3,498.560 $1,972.000 $2,555.830 $2,400.000 $3,842.650 $3,402.420
INLET (COMPL)(TY A)
EA 60.000 $2,369.090 $2,005.000 $2,567.220 $2,100.000 $3,000.000 $3,429.730
INLET (COMPL)(TY AZ)
EA 7.000 $6,150.760 $3,670.000 $3,988.320 $3,300.000 $5,981.010 $5,424.170
MANH (COMPL)(TY A)
EA 10.000 $3,351.460 $2,470.000 $3,087.510 $2,500.000 $5,045.900 $3,877.420
MANH (COMPL)(TY B)
EA 7.000 $4,950.620 $1,718.000 $2,659.710 $3,800.000 $3,715.010 $2,967.420
INLET (COMPL)(CURB)(TY C)
EA 30.000 $3,651.770 $3,105.000 $3,359.530 $3,500.000 $5,879.040 $5,550.780
INLET (COMPL)(CURB)(TY C1)
EA 70.000 $4,984.660 $2,295.000 $3,359.510 $3,400.000 $4,608.500 $4,740.790
INLET (COMPL)(TY AZ2G)
EA 44.000 $7,035.170 $5,094.000 $6,173.610 $5,900.000 $8,444.100 $7,145.800
HEADWALL (CH - FW - 0) (DIA= 42 IN)
EA 1.000 $5,863.450 $11,580.000 $5,638.110 $20,000.000 $15,464.990 $8,194.100
HEADWALL (CH - PW - 0) (DIA= 30 IN)
EA 3.000 $6,662.880 $10,351.000 $3,427.090 $5,500.000 $13,363.180 $7,930.650
HEADWALL (CH - PW - 0) (DIA= 36 IN)
EA 2.000 $7,480.100 $11,925.000 $4,283.870 $6,700.000 $13,007.300 $7,755.230
HEADWALL (CH - PW - 0) (DIA= 42 IN)
EA 3.000 $7,569.450 $14,818.000 $5,638.100 $6,100.000 $15,465.410 $9,942.930
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 3.000 $6,935.910 $13,896.000 $4,283.870 $6,100.000 $13,363.180 $8,193.200
WINGWALL (PW - 2) (HW=8 FT)
EA 2.000 $14,811.900 $22,090.000 $14,648.130 $12,000.000 $37,618.350 $21,344.900
SET (TY II) (18 IN) (RCP) (3: 1) (P)
EA 2.000 $1,222.550 $927.000 $1,466.740 $1,000.000 $818.940 $876.780
SET (TY II) (18 IN) (RCP) (4: 1) (P)
EA 28.000 $1,195.170 $966.000 $1,466.290 $1,100.000 $882.780 $918.940
SET (TY II) (24 IN) (RCP) (3: 1) (P)
EA 6.000 $970.140 $985.000 $1,662.170 $1,200.000 $938.640 $938.600
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 5.000 $1,300.000 $1,085.000 $1,662.330 $1,300.000 $1,098.240 $1,044.000
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 31.000 $1,235.660 $1,085.000 $1,662.140 $1,300.000 $1,098.240 $1,061.230
SET (TY II) (30 IN) (RCP) (4: 1) (P)
EA 3.000 $3,106.540 $1,160.000 $1,746.100 $1,700.000 $1,355.780 $1,123.060
JACK BOR OR TUN PIPE(18 IN)(RC)(CL III)
LF 434.000 $195.580 $522.650 $644.240 $500.000 $801.360 $476.000
JACK BOR OR TUN PIPE(24 IN)(RC)(CL III)
LF 608.000 $788.810 $547.300 $773.680 $525.000 $924.640 $499.000
REMOV STR (INLET)
EA 78.000 $354.160 $956.000 $556.730 $575.000 $854.900 $468.310
REMOV STR (SET)
EA 56.000 $690.800 $957.000 $556.730 $575.000 $372.860 $348.570
REMOV STR (HEADWALL)
EA 13.000 $1,414.600 $1,813.000 $1,250.460 $1,200.000 $1,773.770 $1,436.760
REMOV STR (PIPE)
LF 18,927.000 $36.910 $18.600 $17.150 $15.000 $19.510 $13.670
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $25,359.290 $50,000.000 $25,000.000 $85,000.000 $18,803.750 $20,000.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 19.000 $22,000.000 $100,000.000 $50,000.000 $95,000.000 $29,308.770 $40,000.000
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $31,000.000 $200,000.000 $140,000.000 $260,000.000 $66,096.930 $150,000.000
REMOVING ROCK RIPRAP
LF 813.000 $30.000 $8.000 $8.050 $4.000 $29.040 $10.240
MOBILIZATION
LS 1.000 $10,000,000.000 $15,562,344.000 $10,000,000.000 $11,000,000.000 $14,480,000.000 $14,725,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 52.000 $11,000.000 $15,000.000 $25,000.000 $24,000.000 $15,231.260 $34,326.150
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 5,940.000 $34.360 $35.000 $22.970 $25.000 $22.970 $22.970
ROCK FILTER DAMS (REMOVE)
LF 5,940.000 $12.520 $11.000 $10.270 $5.000 $10.270 $10.270
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 600.000 $36.200 $31.000 $29.660 $29.970 $29.660 $29.660
CONSTRUCTION EXITS (REMOVE)
SY 600.000 $12.540 $11.000 $9.940 $5.000 $9.940 $9.940
TEMP SEDMT CONT FENCE (INSTALL)
LF 29,660.000 $2.540 $2.500 $2.450 $2.500 $2.450 $2.450
TEMP SEDMT CONT FENCE (REMOVE)
LF 29,660.000 $0.770 $1.000 $0.530 $0.250 $0.530 $0.530
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 242,360.000 $7.600 $5.000 $2.640 $3.000 $2.640 $2.640
BIODEG EROSN CONT LOGS (REMOVE)
LF 242,360.000 $1.170 $1.000 $0.380 $0.250 $0.380 $0.380
CONSTRUCTING DETOURS
SY 171,385.000 $68.560 $56.130 $75.000 $70.550 $81.380 $72.820
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 50,883.000 $33.530 $35.000 $55.000 $57.000 $77.060 $15.650
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 1,500.000 $27.150 $40.000 $60.000 $65.000 $56.720 $41.120
PORT CTB (DES SOURCE)(SGL SLP)(TY 1)
LF 100,000.000 $6.050 $5.000 $8.000 $10.000 $6.450 $8.430
PORT CTB (DES SOURCE)(LOW PROF)(TY 1)
LF 40,000.000 $6.050 $5.000 $7.000 $10.000 $6.530 $8.390
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 473,625.000 $6.050 $3.000 $3.000 $5.000 $4.140 $1.620
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 104,387.000 $6.050 $3.000 $3.200 $5.000 $3.790 $2.510
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 5,100.000 $6.050 $3.000 $5.000 $5.000 $8.530 $2.510
PORT CTB (STKPL)(SGL SLP)(TY 1)
LF 135,795.000 $6.050 $5.000 $8.000 $8.000 $6.470 $8.750
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 36,000.000 $6.050 $4.000 $6.500 $8.000 $6.660 $9.240
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 1,350.000 $6.050 $4.000 $6.500 $8.000 $8.950 $9.240
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 15,088.000 $6.050 $5.000 $5.500 $5.000 $6.640 $5.880
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 4,000.000 $6.050 $5.000 $5.000 $5.000 $6.940 $6.900
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 150.000 $6.050 $5.000 $5.000 $5.000 $7.440 $6.910
PORT CTB CONNECT HARDWARE
EA 7,544.000 $53.130 $50.000 $35.000 $31.000 $22.340 $54.130
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 20,783.000 $45.000 $30.000 $38.000 $58.000 $49.630 $50.970
PERM CTB (TRAN SSCB TO SSTR) (MOD)
LF 140.000 $165.000 $150.000 $65.000 $120.000 $120.630 $334.400
CONC CURB (MONO) (TY II)
LF 28,920.000 $4.570 $5.000 $2.210 $2.700 $3.000 $1.340
CONC CURB (U-TURN)
LF 1,100.000 $41.030 $35.000 $32.000 $20.560 $33.600 $51.000
DRIVEWAYS (CONC) (FAST TRACK)
SY 2,652.000 $81.440 $70.000 $65.000 $70.760 $76.990 $49.980
CONC SIDEWALKS (4")
SY 7,674.000 $66.770 $60.000 $38.000 $51.680 $45.200 $39.780
CURB RAMPS (TY 1)
EA 5.000 $2,484.540 $2,300.000 $1,621.140 $2,000.000 $1,259.980 $1,224.000
CURB RAMPS (TY 5)
EA 17.000 $2,409.580 $2,200.000 $1,621.130 $2,700.000 $1,994.960 $1,428.000
CURB RAMPS (TY 10)
EA 41.000 $1,484.420 $1,400.000 $1,621.130 $1,900.000 $1,574.970 $1,734.000
RUMBLE STRIPS (SHOULDER)
LF 19,748.000 $0.220 $0.390 $0.470 $0.290 $0.270 $1.500
CONC MEDIAN
SY 1,856.000 $77.000 $60.000 $57.070 $40.000 $52.500 $52.020
CONCRETE MEDIAN (NOSE)
SY 18.000 $88.000 $60.000 $167.680 $53.000 $195.200 $56.100
MTL W-BEAM GD FEN (TIM POST)
LF 125.000 $24.460 $40.000 $22.500 $28.290 $22.500 $22.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 1.000 $1,269.520 $1,318.100 $1,058.100 $1,136.710 $1,058.100 $1,058.000
REMOVE METAL BEAM GUARD FENCE
LF 12,413.000 $3.950 $3.500 $1.000 $3.030 $1.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 34.000 $230.000 $162.000 $100.000 $353.640 $100.000 $100.000
GUARDRAIL END TREATMENT (REMOVE)
EA 54.000 $250.000 $325.000 $200.000 $252.600 $200.000 $200.000
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 1.000 $3,529.490 $3,754.840 $2,879.840 $2,566.440 $2,879.840 $2,879.840
CRASH CUSH ATTEN (MOVE & RESET)
EA 52.000 $2,457.650 $2,930.000 $2,930.000 $1,750.000 $2,930.000 $2,930.000
CRASH CUSH ATTEN (REMOVE)
EA 26.000 $1,136.470 $1,000.000 $1,000.000 $500.000 $1,000.000 $1,000.000
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
EA 32.000 $22,141.430 $19,000.000 $19,000.000 $20,000.000 $19,000.000 $19,000.000
CRASH CUSH ATTEN (INSTL)(L)(W)(TL3)
EA 9.000 $35,090.000 $36,350.000 $36,350.000 $39,000.000 $36,350.000 $36,350.000
MAILBOX INSTALL-M (TWG-POST) TY 1
EA 1.000 $539.000 $327.950 $327.950 $350.000 $327.950 $327.950
MAILBOX INSTALL-S (WC-POST) TY 3
EA 1.000 $189.540 $164.500 $164.500 $150.000 $164.500 $164.500
REMOVE RD IL ASM (TRANS-BASE)
EA 22.000 $710.770 $1,000.000 $510.650 $505.200 $510.030 $500.000
REMOVE RD IL ASM (U/P)
EA 4.000 $214.500 $300.000 $306.390 $303.120 $306.020 $300.000
IN RD IL (U/P) (TY 1) (150W EQ) LED
EA 18.000 $935.000 $1,068.000 $1,090.750 $1,079.120 $1,089.430 $1,068.000
HI MST IL POLE (150 FT)(100 MPH)
EA 34.000 $29,859.500 $27,500.000 $27,575.220 $27,281.060 $27,541.710 $27,000.000
HI MST IL POLE (175 FT)(100 MPH)
EA 8.000 $38,373.500 $34,630.000 $34,857.130 $34,485.280 $34,814.760 $34,130.000
CONDT (PVC) (SCH 40) (2")
LF 430.000 $8.380 $6.000 $6.130 $6.060 $6.120 $6.000
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 27,090.000 $7.650 $6.400 $6.540 $6.470 $6.530 $6.400
CONDT (PVC) (SCH 80) (2")
LF 30,644.000 $6.900 $6.420 $6.550 $6.490 $6.550 $6.420
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,511.000 $13.240 $10.980 $11.210 $11.090 $11.200 $10.980
CONDT (PVC) (SCH 80) (3")
LF 1,745.000 $13.790 $11.190 $11.420 $11.310 $11.410 $11.190
CONDT (PVC) (SCH 80) (3") (BORE)
LF 5,195.000 $23.910 $20.380 $20.820 $20.590 $20.790 $20.380
CONDT (PVC) (SCH 80) (4")
LF 185.000 $13.630 $13.250 $13.530 $13.390 $13.520 $13.250
CONDT (PVC) (SCH 80) (4") (BORE)
LF 60.000 $20.480 $17.000 $17.360 $17.180 $17.340 $17.000
CONDT (RM) (3/4")
LF 637.000 $16.940 $11.030 $11.260 $11.140 $11.250 $11.030
CONDT (RM) (2")
LF 1,306.000 $20.280 $16.340 $16.690 $16.510 $16.670 $16.340
CONDT (RM) (3")
LF 1,040.000 $31.980 $27.150 $27.730 $27.430 $27.690 $27.150
ELEC CONDR (NO.14) INSULATED
LF 40,130.000 $0.770 $0.800 $0.810 $0.810 $0.820 $0.800
ELEC CONDR (NO.12) BARE
LF 682.000 $1.000 $0.750 $0.760 $0.760 $0.770 $0.750
ELEC CONDR (NO.12) INSULATED
LF 1,364.000 $1.020 $0.750 $0.760 $0.760 $0.770 $0.750
ELEC CONDR (NO.8) BARE
LF 3,861.000 $1.050 $0.850 $0.860 $0.860 $0.870 $0.850
ELEC CONDR (NO.8) INSULATED
LF 7,822.000 $1.400 $0.950 $0.970 $0.960 $0.970 $0.950
ELEC CONDR (NO.6) BARE
LF 31,888.000 $1.360 $1.030 $1.060 $1.040 $1.050 $1.030
ELEC CONDR (NO.6) INSULATED
LF 62,466.000 $1.320 $1.100 $1.130 $1.110 $1.120 $1.100
ELEC CONDR (NO.4) BARE
LF 120.000 $1.670 $1.350 $1.380 $1.360 $1.380 $1.350
ELEC CONDR (NO.4) INSULATED
LF 240.000 $1.820 $1.450 $1.480 $1.470 $1.480 $1.450
TRAY CABLE (3 CONDR) (12 AWG)
LF 15.000 $1.930 $2.000 $2.040 $2.020 $2.040 $2.000
TRAY CABLE (4 CONDR) (12 AWG)
LF 1,200.000 $2.130 $1.850 $1.890 $1.870 $1.890 $1.850
GROUND BOX TY A (122311)
EA 28.000 $794.140 $600.000 $612.780 $606.250 $612.040 $600.000
GROUND BOX TY D (162922)W/APRON
EA 140.000 $877.230 $675.000 $689.380 $682.030 $688.540 $675.000
REMOVE GROUND BOX
EA 7.000 $300.290 $50.000 $51.070 $50.520 $51.000 $50.000
TIMBER POLE (CL 2) 30 FT
EA 3.000 $2,300.000 $855.000 $873.220 $863.900 $872.150 $855.000
TIMBER POLE (CL 2) 50 FT
EA 1.000 $2,500.000 $1,570.000 $1,603.450 $1,586.350 $1,601.500 $1,570.000
REMOVE ELECTRICAL SERVICES
EA 1.000 $628.060 $400.000 $102.130 $101.040 $102.010 $100.000
ELC SRV TY A 240/480 060(SS)SS(E)GC(U)
EA 11.000 $5,776.430 $6,488.000 $6,115.570 $6,050.330 $6,108.140 $5,988.000
ELC SRV TY D 120/240 070(NS)SS(E)SP(O)
EA 1.000 $4,542.510 $5,275.000 $4,876.730 $4,824.710 $4,870.800 $4,775.000
ALUMINUM SIGNS (TY A)
SF 146.000 $41.640 $27.990 $28.580 $28.280 $28.550 $14.600
ALUMINUM SIGNS (TY G)
SF 225.000 $19.590 $20.240 $20.670 $20.450 $20.650 $31.000
ALUMINUM SIGNS (TY O)
SF 4,023.750 $19.490 $17.550 $17.920 $17.730 $17.900 $18.650
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 81.000 $471.890 $409.000 $700.000 $318.280 $409.000 $315.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P-BM)
EA 7.000 $469.400 $579.050 $700.000 $551.680 $579.050 $546.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 91.000 $540.790 $544.970 $700.000 $454.680 $544.970 $450.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 1.000 $825.000 $576.800 $700.000 $415.280 $576.800 $411.000
IN SM RD SN SUP&AM TY10BWG(2)SA(T-2EXT)
EA 3.000 $1,100.000 $1,089.710 $700.000 $889.160 $1,089.710 $880.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $720.500 $563.000 $700.000 $535.520 $563.000 $530.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 45.000 $681.640 $598.000 $700.000 $949.790 $598.000 $940.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 8.000 $699.450 $654.000 $700.000 $552.690 $654.000 $547.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 9.000 $960.660 $718.000 $700.000 $621.400 $718.000 $615.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 4.000 $1,555.720 $1,875.000 $1,914.950 $1,518.650 $2,124.500 $1,425.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 2.000 $1,716.000 $1,875.000 $1,914.950 $1,638.890 $2,190.000 $1,455.000
REMOVE SM RD SN SUP&AM
EA 63.000 $128.830 $115.000 $25.000 $50.520 $65.000 $50.000
INSTALL LRSS (STRUCT STEEL)
LB 1,848.000 $4.520 $5.430 $5.550 $5.490 $5.540 $3.250
REMOVE LRSA
EA 11.000 $887.120 $700.000 $204.260 $202.080 $204.010 $1,000.000
INS OH SN SUP(20 FT BAL TEE)(SPAN ONLY)
EA 3.000 $10,000.000 $7,765.000 $7,930.430 $7,845.830 $7,920.790 $7,765.000
INS OH SN SUP(30 FT CANT)(SPAN ONLY)
EA 1.000 $11,400.000 $9,310.000 $9,508.350 $9,406.910 $9,496.790 $9,310.000
INS OH SN SUP(35 FT CANT)(SPAN ONLY)
EA 5.000 $15,900.500 $10,405.000 $10,626.670 $10,513.310 $10,613.760 $10,405.000
INS OH SN SUP(80 FT BRDG)(SPAN ONLY)
EA 2.000 $34,000.000 $31,220.000 $31,885.130 $31,544.990 $31,846.380 $31,220.000
INS OH SN SUP(140 FT BRDG)(SPAN ONLY)
EA 1.000 $63,000.000 $71,920.000 $73,452.210 $72,668.670 $73,362.960 $71,920.000
INS OH SN SUP(165 FT BRDG)(SPAN ONLY)
EA 1.000 $72,000.000 $107,700.000 $109,994.490 $108,821.130 $109,860.830 $107,700.000
REMOVE OVERHD SIGN SUP
EA 3.000 $11,000.000 $6,225.000 $4,825.660 $4,774.190 $4,819.800 $4,725.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 730.000 $20.550 $8.500 $20.000 $15.160 $17.500 $8.500
INSTL DEL ASSM (D-SY)SZ (BRF)CTB
EA 251.000 $17.590 $8.500 $20.000 $15.160 $19.000 $8.500
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 251.000 $19.800 $10.000 $20.000 $18.190 $30.500 $10.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 15,924.000 $0.180 $0.150 $0.150 $0.150 $0.150 $0.320
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 61,944.000 $0.140 $0.150 $0.150 $0.150 $0.150 $0.300
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 108.000 $1.310 $2.000 $2.000 $2.020 $2.000 $2.500
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 72,900.000 $0.140 $0.150 $0.150 $0.150 $0.150 $0.300
WK ZN PAV MRK REMOV (W)4"(BRK)
LF 85,415.000 $0.780 $0.650 $0.650 $0.660 $0.650 $0.450
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 1,423.000 $0.100 $1.500 $1.500 $1.520 $1.500 $0.750
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 588,274.000 $0.720 $0.550 $0.550 $0.560 $0.550 $0.400
WK ZN PAV MRK REMOV (W)12"(SLD)
LF 544.000 $4.910 $2.000 $2.000 $2.020 $2.000 $3.000
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 9,525.000 $14.530 $3.000 $3.000 $3.030 $3.000 $3.250
WK ZN PAV MRK REMOV (W)(ARROW)
EA 40.000 $209.180 $155.000 $155.000 $156.610 $155.000 $150.000
WK ZN PAV MRK REMOV (W)(ENTR GORE)
EA 55.000 $398.990 $400.000 $400.000 $404.160 $400.000 $350.000
WK ZN PAV MRK REMOV (W)(EXIT GORE)
EA 45.000 $385.000 $400.000 $400.000 $404.160 $400.000 $350.000
WK ZN PAV MRK REMOV (W)(WORD)
EA 40.000 $264.430 $165.000 $165.000 $166.720 $165.000 $200.000
WK ZN PAV MRK REMOV (W)18"(YLD TRI)
EA 61.000 $23.210 $25.000 $25.000 $25.260 $25.000 $25.000
WK ZN PAV MRK REMOV (Y)4"(BRK)
LF 368.000 $0.820 $0.650 $0.650 $0.660 $0.650 $0.450
WK ZN PAV MRK REMOV (Y)4"(DOT)
LF 469.000 $1.120 $1.500 $1.500 $1.520 $1.500 $0.750
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 561,339.000 $0.700 $0.550 $0.550 $0.560 $0.550 $0.400
WK ZN PAV MRK REMOV (Y)24"(SLD)
LF 10,161.000 $3.630 $3.000 $3.000 $3.030 $3.000 $3.250
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 36.000 $4.970 $8.000 $8.000 $8.080 $8.000 $12.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 5,308.000 $0.550 $0.650 $0.650 $0.660 $0.650 $1.200
REFL PAV MRK TY II (Y) 12" (SLD)
LF 115.000 $0.810 $0.750 $0.760 $0.760 $0.750 $1.500
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 5,308.000 $0.430 $0.350 $0.350 $0.350 $0.350 $1.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 20,648.000 $0.410 $0.330 $0.330 $0.330 $0.330 $1.000
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 24,300.000 $0.440 $0.330 $0.330 $0.330 $0.330 $1.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 24.000 $221.970 $225.000 $0.330 $0.330 $0.330 $250.000
PREFAB PAV MRK TY C (W) (DBL ARROW)
EA 8.000 $332.160 $450.000 $225.000 $227.340 $225.000 $400.000
PREFAB PAV MRK TY C (W) (UTURN ARROW)
EA 4.000 $365.940 $450.000 $450.000 $454.680 $450.000 $425.000
PREFAB PAV MRK TY C (W) (WORD)
EA 28.000 $294.490 $275.000 $450.000 $454.680 $450.000 $300.000
REFL PAV MRKR TY I-A
EA 62.000 $4.950 $3.950 $275.000 $277.860 $275.000 $3.500
REFL PAV MRKR TY I-C
EA 230.000 $3.630 $3.950 $3.950 $3.990 $3.950 $3.500
REFL PAV MRKR TY II-A-A
EA 570.000 $3.280 $3.950 $3.950 $3.990 $3.950 $3.750
REFL PAV MRKR TY II-C-R
EA 2,813.000 $3.660 $3.950 $3.950 $3.990 $3.950 $3.750
ELIM EXT PAV MRK & MRKS (4")
LF 1,096,296.000 $0.370 $0.250 $0.250 $0.250 $0.250 $0.330
ELIM EXT PAV MRK & MRKS (12")
LF 544.000 $1.580 $0.750 $0.750 $0.760 $0.750 $1.000
ELIM EXT PAV MRK & MRKS (24")
LF 13,014.000 $2.430 $1.500 $1.500 $1.520 $1.500 $1.980
ELIM EXT PAV MRK & MRKS (ARROW)
EA 40.000 $39.920 $25.000 $25.000 $25.260 $25.000 $35.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 40.000 $43.810 $30.000 $30.000 $30.310 $30.000 $35.000
ELIM EXT PAV MRK & MRKS (ENTR GORE)
EA 55.000 $280.190 $150.000 $150.000 $151.560 $150.000 $50.000
ELIM EXT PAV MRK & MRKS (EXIT GORE)
EA 45.000 $262.570 $150.000 $150.000 $151.560 $150.000 $50.000
ELIM EXT PAV MRK & MRKS (18")(YLD TRI)
EA 61.000 $22.220 $5.000 $5.000 $5.050 $5.000 $5.000
PAV SURF PREP FOR MRK (4")
LF 1,217,143.000 $0.020 $0.010 $0.010 $0.010 $0.010 $0.020
PAV SURF PREP FOR MRK (6")
LF 256,781.000 $0.020 $0.020 $0.020 $0.020 $0.020 $0.030
PAV SURF PREP FOR MRK (8")
LF 22,562.000 $0.030 $0.030 $0.030 $0.030 $0.030 $0.040
PAV SURF PREP FOR MRK (12")
LF 2,570.000 $0.330 $0.040 $0.040 $0.040 $0.040 $0.060
PAV SURF PREP FOR MRK (24")
LF 21,672.000 $0.340 $0.060 $0.060 $0.060 $0.060 $0.100
PAV SURF PREP FOR MRK (ARROW)
EA 64.000 $7.810 $3.000 $3.000 $3.030 $3.000 $10.000
PAV SURF PREP FOR MRK (DBL ARROW)
EA 8.000 $15.700 $5.000 $5.000 $5.050 $5.000 $10.000
PAV SURF PREP FOR MRK (UTURN ARR)
EA 4.000 $10.780 $5.000 $5.000 $5.050 $5.000 $10.000
PAV SURF PREP FOR MRK (WORD)
EA 68.000 $8.210 $5.000 $5.000 $5.050 $5.000 $10.000
PAV SURF PREP FOR MRK (ENTR GORE)
EA 55.000 $29.650 $20.000 $20.000 $20.210 $20.000 $20.000
PAV SURF PREP FOR MRK (EXIT GORE)
EA 45.000 $27.500 $20.000 $20.000 $20.210 $20.000 $20.000
PAV SURF PREP FOR MRK (18")(YLD TRI)
EA 61.000 $5.500 $2.000 $2.000 $2.020 $0.200 $5.000
INSTALL HWY TRF SIG (SYSTEM)
EA 1.000 $31,444.140 $28,750.000 $29,362.510 $29,049.280 $29,326.820 $28,750.000
REMOVING TRAFFIC SIGNALS
EA 1.000 $3,080.440 $4,500.000 $3,574.570 $3,536.430 $3,570.220 $3,500.000
TEMP TRAF SIGNALS
EA 1.000 $33,136.420 $32,642.000 $33,337.420 $32,981.790 $33,296.910 $32,642.000
VEH SIG SEC (12")LED(GRN)
EA 16.000 $203.500 $185.000 $188.940 $186.930 $188.710 $185.000
VEH SIG SEC (12")LED(GRN ARW)
EA 2.000 $203.500 $185.000 $188.940 $186.930 $188.710 $185.000
VEH SIG SEC (12")LED(YEL)
EA 24.000 $203.500 $185.000 $188.940 $186.930 $188.710 $185.000
VEH SIG SEC (12")LED(YEL ARW)
EA 2.000 $203.500 $185.000 $188.940 $186.930 $188.710 $185.000
VEH SIG SEC (12")LED(RED)
EA 16.000 $203.500 $185.000 $188.940 $186.930 $188.710 $185.000
VEH SIG SEC (12")LED(RED ARW)
EA 4.000 $203.500 $185.000 $188.940 $186.930 $188.710 $185.000
PED SIG SEC (LED)(COUNTDOWN)
EA 12.000 $379.160 $675.000 $689.380 $682.030 $688.540 $675.000
BACK PLATE (12")(1 SEC)
EA 12.000 $58.180 $55.000 $56.170 $55.570 $56.100 $55.000
BACK PLATE (12")(3 SEC)
EA 16.000 $101.300 $65.000 $66.380 $65.680 $66.300 $65.000
BACK PLATE (12")(4 SEC)
EA 2.000 $104.290 $75.000 $76.600 $75.780 $76.510 $75.000
TRF SIG CBL (TY A)(12 AWG)(2 CONDR)
LF 3,540.000 $1.470 $1.100 $1.130 $1.110 $1.120 $1.100
TRF SIG CBL (TY A)(12 AWG)(4 CONDR)
LF 3,580.000 $1.840 $1.480 $1.510 $1.500 $1.510 $1.480
TRF SIG CBL (TY A)(12 AWG)(7 CONDR)
LF 5,850.000 $2.230 $1.890 $1.930 $1.910 $1.930 $1.890
INSTL RDSD FLSH BCN ASSM (SOLAR PWRD)
EA 4.000 $4,917.530 $5,789.000 $5,912.330 $5,849.260 $5,905.150 $5,789.000
INS TRF SIG PL AM(S)1 ARM(44')LUM
EA 1.000 $9,356.880 $7,806.000 $7,972.300 $7,887.260 $7,962.610 $7,806.000
INS TRF SIG PL AM(S)1 ARM(50')LUM
EA 1.000 $16,737.050 $13,027.000 $13,304.540 $13,162.610 $13,288.370 $13,027.000
INS TRF SIG PL AM(S)2 ARM(50-44')LUM
EA 2.000 $16,650.230 $15,700.000 $16,034.480 $15,863.440 $16,015.000 $15,700.000
PED POLE ASSEMBLY
EA 8.000 $1,728.840 $997.000 $1,018.240 $1,007.380 $1,017.000 $997.000
PED DETECT PUSH BUTTON (APS)
EA 12.000 $875.710 $978.000 $998.840 $988.180 $997.620 $978.000
PED DETECTOR CONTROLLER UNIT
EA 2.000 $3,868.680 $3,255.000 $3,324.350 $3,288.890 $3,320.310 $3,255.000
REMOVAL OF GROUND BOXES
EA 4.000 $453.270 $50.000 $51.070 $50.520 $51.000 $50.000
FULL - WIDTH MOWING
CYC 12.000 $1,700.000 $2,300.000 $6,000.000 $2,500.000 $3,500.000 $2,011.430
LITTER REMOVAL
CYC 12.000 $1,400.000 $1,900.000 $600.000 $3,200.000 $2,156.890 $1,193.000
CLEANING / SWEEPING (OUTSIDE MAIN LANE)
CYC 50.000 $900.000 $2,200.000 $500.000 $2,200.000 $1,200.000 $1,951.550
CLEANING / SWEEPING (FRONTAGE ROAD)
CYC 50.000 $850.000 $2,200.000 $500.000 $1,900.000 $1,200.000 $1,940.410
CLEANING / SWEEPING(ENTRANCE/EXIT RAMP)
CYC 50.000 $1,100.000 $1,200.000 $2,000.000 $1,700.000 $1,200.000 $1,051.550
WIDE FLANGE PAVEMENT TERMINALS
LF 3,446.580 $233.900 $200.000 $400.000 $450.000 $470.240 $360.340
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 6,000.000 $70.000 $10.000 $17.670 $30.000 $15.960 $18.040
VIVDS TEMPORARY
EA 1.000 $13,973.220 $13,426.000 $13,712.030 $13,565.760 $13,695.370 $13,426.000
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 9,225.000 $2.330 $1.550 $1.590 $1.570 $1.580 $1.550
FIBER OPTIC CBL (SNGLE-MODE)(12 FIBER)
LF 185.000 $19.290 $2.850 $2.910 $2.880 $2.910 $2.850
FIBER OPTIC CBL (SNGLE-MODE)(36 FIBER)
LF 10,725.000 $2.040 $3.450 $3.530 $3.490 $3.520 $3.450
FIBER OPTIC CBL (SNGLE-MODE)(144 FIBER)
LF 10,820.000 $5.040 $4.030 $4.120 $4.070 $4.110 $4.030
ITS GRND MNT CAB (TY 6) (CONF 2)
EA 2.000 $20,000.000 $8,350.000 $8,527.900 $8,436.920 $8,517.530 $8,350.000
ITS GRND MNT CAB (TY 6) (CONF 2) (REM)
EA 2.000 $20,000.000 $500.000 $510.650 $505.210 $510.030 $500.000
FIBER OPTIC RS-232 DATA MODEM(S/M)
EA 1.000 $2,177.090 $1,500.000 $1,531.960 $1,515.610 $1,530.100 $1,500.000
MULTI-DUCT CONDUIT (PVC)
LF 32,750.000 $11.370 $9.310 $9.500 $9.410 $9.500 $9.310
MULTI-DUCT CONDUIT (PVC)(BORED)
LF 6,205.000 $30.570 $26.100 $26.660 $26.370 $26.620 $26.100
MULTI-DUCT CONDUIT (RMC)
LF 980.000 $60.650 $52.150 $53.260 $52.690 $53.200 $52.150
RADAR PRESENCE DETECTOR
EA 6.000 $7,826.610 $5,895.000 $6,020.590 $5,956.370 $6,013.270 $5,895.000
RADAR PRESENCE DETECTOR COMM CABLE
LF 1,800.000 $3.920 $3.050 $3.110 $3.080 $3.110 $3.050
CONDUIT (PREPARE)
LF 20,750.000 $1.440 $0.750 $0.760 $0.760 $0.770 $0.750
CTMS RELOCATION (CCTV)
EA 6.000 $6,168.800 $5,017.000 $4,613.230 $4,564.020 $4,607.630 $4,517.000
CTMS RELOCATION (HUB BLDG)
EA 2.000 $17,484.500 $7,678.000 $7,535.190 $7,454.810 $7,526.030 $7,378.000
CTMS RELOCATION (FIBER OPTIC CABLE)
LF 17,300.000 $4.950 $3.200 $3.270 $3.230 $3.260 $3.200
CTMS RELOCATION (MVD)
EA 1.000 $6,297.500 $2,750.000 $2,808.590 $2,778.630 $2,805.170 $2,750.000
CTMS RELOCATION (DMS)
EA 1.000 $12,474.000 $13,750.000 $13,532.290 $13,387.930 $13,515.840 $13,250.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 91,561.000 $0.590 $0.550 $0.550 $0.560 $0.550 $0.600
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 39,256.000 $0.690 $0.600 $0.600 $0.610 $0.600 $0.620
MULTIPOLYMER PAV MRK (W)(6")(DOT)
LF 321.000 $2.050 $1.250 $1.250 $1.260 $1.250 $2.000
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 20,909.000 $1.130 $1.000 $1.000 $1.010 $1.000 $0.800
MULTIPOLYMER PAV MRK (W)(12")(SLD)
LF 1,555.000 $4.170 $2.250 $2.250 $2.270 $2.250 $1.500
MULTIPOLYMER PAV MRK (W)(24")(SLD)
LF 429.000 $6.150 $5.000 $5.000 $5.050 $5.000 $6.000
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 101,000.000 $0.620 $0.520 $0.520 $0.530 $0.520 $0.600
MULTIPOLYMER PAV MRK (Y)(8")(SLD)
LF 1,653.000 $1.210 $1.000 $1.000 $1.010 $1.000 $0.800
MULTIPOLYMER PAV MRK (Y)(12")(SLD)
LF 356.000 $3.370 $2.500 $2.500 $2.530 $2.500 $1.500
MULTIPOLYMER PAV MRK (Y)(24")(SLD)
LF 1,860.000 $6.600 $5.000 $5.000 $5.050 $5.000 $6.000
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 38,326.000 $0.680 $0.650 $0.650 $0.660 $0.650 $1.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 160.000 $3.410 $17.000 $17.000 $18.190 $13.180 $17.000
RADAR ADVANCED DETECTION DEVICE
EA 2.000 $7,964.780 $6,540.000 $6,679.330 $6,608.080 $6,671.220 $6,540.000
BBU SYSTEM (EXTERNAL BATT CABINET)
EA 1.000 $7,139.560 $5,789.000 $5,912.330 $5,849.260 $5,905.150 $5,789.000
GPS COMMUNICATIONS UNIT
EA 1.000 $857.160 $985.000 $1,005.980 $995.260 $1,004.760 $985.000
ITS RADIO (DUAL)(5 GHZ/5 GHZ)-I-U
EA 2.000 $5,964.000 $2,542.000 $2,596.160 $2,568.460 $2,593.000 $2,542.000
LED HI MST IL ASM (6 FIXT)(ASYM)(TY A)
EA 42.000 $34,000.000 $28,219.000 $28,820.190 $28,512.750 $28,785.170 $28,219.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 59.000 $1,924.420 $2,785.000 $2,844.330 $2,813.990 $2,840.880 $2,785.000
WORK ZONE INTELLIGENT TRNSPRTN SYSTEM
LS 1.000 $300,000.000 $1,574,058.000 $1,287,744.980 $1,301,150.090 $1,189,602.750 $1,287,744.980
AUTO PORT SMRT TRF MONITOR SYS(PLAN 1)
DAY 70.000 $1,500.000 $1,488.000 $1,487.380 $1,626.850 $1,487.380 $1,610.080
AUTO PORT SMRT TRF MONITOR SYS(PLAN 2)
DAY 30.000 $2,000.000 $2,220.000 $2,219.750 $2,427.890 $2,219.750 $2,402.880
SANITARY SEWER (8 IN) (DI)
LF 256.000 $71.500 $140.000 $111.280 $141.460 $119.990 $142.800
SAN SEWER (10 IN) (DI) (CL 2)
LF 2,708.000 $85.000 $140.000 $121.830 $141.460 $120.730 $142.800
MANHOLES (SAN SEWER) (TY 1)
EA 12.000 $5,000.000 $5,000.000 $4,795.970 $5,052.050 $7,748.500 $5,100.000
ADJUSTING MANHOLE (SANITARY SEWER)
EA 7.000 $1,750.000 $350.000 $1,132.840 $353.640 $635.560 $357.000
JCK BOR OR TUN CSNG(STL)(SAN SWR)(22IN)
LF 335.000 $600.000 $500.000 $410.720 $505.200 $669.960 $510.000
SERVICE CONNECTION (SANITARY SEWER)
EA 15.000 $2,500.000 $1,200.000 $956.960 $1,212.490 $4,080.970 $1,224.000
ABANDON SANITARY SEWER (8IN)
EA 2.000 $3,000.000 $300.000 $1,152.180 $303.120 $4,863.180 $306.000
ABANDON SANITARY SEWER (10IN)
EA 1.000 $3,500.000 $300.000 $1,446.680 $303.120 $4,993.660 $306.000
CUT AND RESTORE PAVEMENT
SY 360.000 $100.000 $108.000 $98.930 $109.120 $99.820 $110.160
REMOVE EXISTING MANHOLE(SANITARY SEWER)
EA 5.000 $1,400.000 $500.000 $862.540 $505.200 $893.990 $510.000
WATER MAIN PIPE (DI) (6IN)
LF 60.000 $100.000 $120.000 $151.330 $121.250 $519.050 $122.400
WATER MAIN PIPE (DI) (8IN) LF
LF 1,641.000 $130.000 $120.000 $73.010 $121.250 $116.740 $122.400
WATER MAIN PIPE (DI) (12IN) LF
LF 832.000 $165.000 $160.000 $86.340 $161.670 $152.320 $163.200
FIRE HYDRANT BRANCH (LEAD) (6IN)
LF 15.000 $90.000 $600.000 $156.570 $606.250 $2,105.360 $612.000
ADJUST WATER VALVE BOX
EA 1.000 $80.000 $100.000 $479.500 $101.040 $635.580 $102.000
JCK TUN BOR OR AUG CSG (STL) (18IN)
LF 752.000 $425.000 $550.000 $397.840 $555.730 $755.480 $561.000
JCK TUN BOR OR AUG CSG (STL) (22IN)
LF 428.000 $450.000 $550.000 $355.970 $555.730 $723.930 $561.000
SERVICE LINE (SHORT SIDE) (5/8" TO 1")
EA 7.000 $1,000.000 $1,200.000 $594.920 $1,212.490 $1,754.840 $1,224.000
FIRE HYDRANT ASSEMBLY
EA 5.000 $5,500.000 $6,000.000 $4,230.750 $6,062.460 $5,557.650 $6,120.000
REMOVING FIRE HYDRANT
EA 4.000 $350.000 $100.000 $687.290 $101.040 $682.640 $102.000
REMOVING WATER VALVE AND BOX
EA 2.000 $300.000 $100.000 $687.300 $101.040 $578.500 $102.000
CUT AND PLUG WATER MAIN (6IN)
EA 7.000 $1,100.000 $1,500.000 $975.480 $1,515.610 $1,336.170 $1,530.000
CUT AND PLUG WATER MAIN (12IN)
EA 2.000 $1,750.000 $1,400.000 $1,152.180 $1,414.570 $1,339.760 $1,428.000
WET CONNECTION (6IN)
EA 7.000 $1,550.000 $3,200.000 $746.900 $3,233.310 $2,840.490 $3,264.000
WET CONNECTION (12IN)
EA 2.000 $3,000.000 $2,800.000 $1,398.380 $2,829.150 $4,635.480 $2,856.000
Totals: $142,378,747.023 $141,496,478.112 $142,921,883.902 $146,660,739.250 $149,830,396.292 $152,474,810.740