Items: 47

County: WALLER
Length: 0.0000 MILES
Highway: US 290
District: HOUSTON
Control Number: 0114-11-090
DBE Goal: 0.0%
Project: CM 2025(680)
Guaranty: $100,000.00
Time: 270 WORKING DAYS
Engineer's Estimate: $16,225,543.36
Date: 04/04/2025 (1 year ago)
Contract Number: 4253205
Type: ADVANCED TRAFFIC MANAGEMENT SYSTEM
Project ID: A00140450
Contract Type: Federal
Project Description: INSTALL NEW ITS EQUIPMENT AND INFRASTRUCTURE
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$16,225,543.36
$11,686,063.92
Over/Under Est: -27.98% -$4,539,479.44
Over/Under Est: -18.53% -$3,006,202.00
Amt Left: 13.12% $1,533,277.44
$14,299,429.34
Over/Under Est: -11.87% -$1,926,114.02
Amt Left: 22.36% $2,613,365.42
Delta: -8.17% -$1,080,087.98
Subcontractor Percentage Amount
BAY CITY TRAFFIC 3.27% $376,489.29
Total: 3.27% $376,489.29

Bid Items & Bid Tabulations

47 Total 0 of 47
WALLER  |  US 290  |  HOUSTON  |  0114-11-090  |  04/04/2025  |  $16,225,543.36  |  CM 2025(680)  |  ADVANCED TRAF MGT SYSTEM  |  270 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALLSTATE SIGNAL & CONSTRUCTION, LLC
THIRD COAST SERVICES LLC
SICE, INC.
DRILL SHAFT (42 IN)
LF 360.000 $450.000 $384.270 $290.030 $707.978
DRILL SHAFT (SIGN MTS) (54 IN)
LF 255.000 $700.000 $691.780 $976.850 $1,041.350
RIPRAP (MOW STRIP)(4 IN)
CY 136.000 $800.000 $586.690 $548.970 $989.142
MOBILIZATION
LS 1.000 $1,180,000.000 $100,000.000 $1,321,934.130 $859,875.598
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 18.000 $16,389.000 $7,994.440 $5,177.380 $5,541.348
TMA (STATIONARY)
DAY 270.000 $285.580 $535.000 $575.270 $367.221
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,000.000 $4.500 $2.500 $3.990 $2.784
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,000.000 $1.000 $1.000 $1.760 $0.615
MTL W-BEAM GD FEN (TIM POST)
LF 4,200.000 $29.000 $25.730 $13.300 $31.043
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 19.000 $2,000.000 $1,522.500 $831.040 $1,480.602
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 19.000 $3,100.000 $3,255.000 $886.440 $3,608.189
CONDT (PVC) (SCH 40) (3") (CONC ENCSE)
LF 163,435.000 $20.000 $12.150 $11.530 $13.344
CONDT (PVC) (SCH 80) (2")
LF 11,660.000 $17.000 $8.090 $7.960 $9.049
CONDT (PVC) (SCH 80) (2") (BORE)
LF 5,540.000 $28.000 $32.290 $38.760 $24.652
CONDT (PVC) (SCH 80) (3")
LF 2,120.000 $21.000 $15.260 $9.420 $9.915
CONDT (PVC) (SCH 80) (3") (BORE)
LF 15,580.000 $30.000 $24.480 $31.140 $28.753
CONDT (RM) (3")
LF 4,850.000 $70.000 $49.870 $47.750 $112.765
CONDUIT (PREPARE)
LF 2,320.000 $1.500 $1.000 $3.520 $1.229
ITS MULTI-DUCT CND (PVC-40)(CONC ENCSE)
LF 163,435.000 $27.000 $21.460 $18.050 $20.016
ITS MULTI-DUCT CND (PVC-80)(BORE)
LF 17,740.000 $45.000 $30.940 $48.480 $29.828
ITS MULTI-DUCT CND (RMC)
LF 4,850.000 $97.400 $91.200 $189.340 $152.773
ELEC CONDR (NO.14) INSULATED
LF 122,160.000 $1.000 $0.980 $1.220 $1.478
ELEC CONDR (NO.8) BARE
LF 4,475.000 $1.820 $2.140 $1.620 $1.236
ELEC CONDR (NO.8) INSULATED
LF 9,000.000 $1.880 $2.370 $1.620 $1.407
ELEC CONDR (NO.6) BARE
LF 2,260.000 $1.930 $2.470 $1.960 $1.082
ELEC CONDR (NO.6) INSULATED
LF 6,780.000 $2.500 $2.710 $2.210 $1.871
ELEC CONDR (NO.4) BARE
LF 2,500.000 $3.650 $3.340 $2.490 $2.829
ELEC CONDR (NO.4) INSULATED
LF 5,725.000 $3.960 $3.610 $2.770 $2.563
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 180.000 $4,500.000 $4,492.000 $4,260.990 $3,900.787
GROUND BOX TY A (122311)
EA 58.000 $1,000.000 $720.000 $817.920 $681.861
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 26.000 $8,000.000 $7,045.000 $6,239.600 $7,647.322
INS OH SN SUP(35 FT BAL TEE)
EA 5.000 $62,000.000 $45,650.000 $54,971.520 $70,346.974
SIGN WALKWAY (36 IN) WITH HNDRL
LF 125.000 $400.000 $338.000 $471.070 $597.161
INSTALL DMS (FOUNDATION MTD CABINET)
EA 5.000 $15,000.000 $11,400.000 $4,021.780 $13,230.043
SYSTEM INTEGRATION
LS 1.000 $40,000.000 $7,500.000 $16,450.660 $44,378.054
ITS RVSD SYSTEM (DATA COLLECTION ONLY)
EA 15.000 $10,000.000 $10,100.000 $12,134.100 $13,696.856
ITS POLE (55 FT)(110 MPH)
EA 24.000 $22,000.000 $19,631.000 $17,611.650 $24,048.303
ITS POLE MNTD CAB (TY 2)(CONF 1)
EA 24.000 $5,500.000 $6,160.000 $7,304.560 $4,562.769
CCTV FIELD EQUIPMENT (DIGITAL)
EA 24.000 $7,000.000 $7,425.000 $7,248.830 $7,555.267
FIBER OPTIC CBL (SINGLE-MODE)(12 FIBER)
LF 75,410.000 $2.570 $1.670 $2.000 $4.556
FIBER OPTIC FUSION SPLICE
EA 2,124.000 $39.540 $23.070 $80.440 $53.004
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 17.000 $1,200.000 $3,679.390 $2,862.740 $2,963.893
FIBER OPTIC CBL(SINGLE-MODE)(144 FIBER)
LF 113,515.000 $4.840 $2.290 $2.690 $5.217
FIBER OPTIC PATCH PANEL (144 POSITIONS)
EA 10.000 $3,272.500 $4,474.560 $3,252.810 $13,424.048
FIBER OPTIC CBL (SINGLE-MODE)(6 FIBER)
LF 48,040.000 $1.580 $1.700 $1.300 $3.744
ITS GRND MNT CAB (TY 6)(CONF 2)
EA 3.000 $14,500.000 $14,025.000 $15,723.570 $16,782.624
COMMUNICATIONS HUB BUILDING
EA 3.000 $35,000.000 $31,750.000 $41,477.240 $39,679.996
Totals: $16,225,543.360 $11,686,063.920 $13,219,341.360 $14,299,429.320
INCLUDES FORCE ACCOUNT WORK AMOUNTS AS FOLLOWS:
Description Amount
MATERIAL FURNISHED BY THE STATE (PART) $798,000.00
EROSION CONTROL MAINTENANCE: CONTRACTOR FORCE ACCOUNT WORK (PART) $8,000.00
CONTRACTOR FORCE ACCOUNT WORK (PART) $40,000.00
SAFETY CONTINGENCY: CONTRACTOR FORCE ACCOUNT WORK (PART) $6,020.00
LAW ENFORCEMENT: CONTRACTOR FORCE ACCOUNT WORK (PART) $80,000.00
PUBLIC UTILITY FORCE ACCT WORK (PART) $20,000.00
Total: $952,020.00