WALLER US 290 (0114-11-076)

Items: 58

County: WALLER
Length: N/A
Highway: US 290
District: HOUSTON
Control Number: 0114-11-076
DBE Goal: N/A
Project: STP 2017(634)HES
Guaranty: N/A
Time: 23 WORKING DAYS
Engineer's Estimate: $163,030.77
Date: 01/05/2017 (9 years ago)
Contract Number: N/A
Type: TRAFFIC SAFETY IMPROVEMENT, CLOSE CROSSOVER
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$163,030.77
$181,056.63
Over/Under Est: 11.06% $18,025.86
Over/Under Est: 15.06% $24,556.37
Amt Left: 3.61% $6,530.51

Bid Items & Bid Tabulations

58 Total 0 of 58
WALLER  |  US 290  |  HOUSTON  |  0114-11-076  |  01/05/2017  |  $163,030.77  |  STP 2017(634)HES  |  TRAF SAFETY IMPRV, CLOSE CROSSOVER  |  23 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MAIN LANE INDUSTRIES LTD.
CORNERSTONE PAVING AND CONSTRUCTION, L.L.C.
REMOVING STAB BASE & ASPH PAV (8")
SY 337.000 $7.500 $15.000 $30.000
SUBGRADE WIDENING (DENS CONT)
STA 6.660 $365.000 $1,600.000 $800.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 108.000 $11.240 $50.000 $50.000
BLOCK SODDING
SY 2,203.000 $2.650 $3.000 $6.500
FERTILIZER
AC 0.460 $700.000 $2,200.000 $800.000
VEGETATIVE WATERING
MG 55.200 $23.000 $80.000 $35.000
ASPHALT STAB BASE (GR 2)(PG 64)
TON 396.000 $110.000 $120.000 $85.000
SLV, HAUL & STKPL RCL APH PV (8 TO 10")
SY 337.000 $5.000 $6.000 $4.000
D-GR HMA(SQ) TY-D SAC-A PG76-22
TON 49.500 $125.000 $195.000 $225.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 40.000 $212.000 $127.000 $275.000
RIPRAP (CONC) (CL B) (4")
CY 1.400 $450.000 $1,380.000 $2,000.000
MOBILIZATION
LS 1.000 $19,819.000 $15,800.000 $10,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $6,800.000 $3,500.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 20.000 $34.690 $55.000 $0.040
ROCK FILTER DAMS (REMOVE)
LF 20.000 $12.250 $30.000 $25.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $33.610 $25.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $12.400 $15.000 $25.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 172.000 $3.090 $3.500 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 172.000 $1.200 $1.000 $2.000
IN RD IL (TY SA) 40T-10-10(250W EQ)LED
EA 4.000 $3,500.000 $3,667.000 $4,000.000
CONDT (PVC) (SCH 40) (2")
LF 915.000 $4.600 $7.800 $7.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 60.000 $17.590 $12.450 $20.000
ELEC CONDR (NO.8) BARE
LF 995.000 $0.850 $1.150 $2.000
ELEC CONDR (NO.8) INSULATED
LF 1,990.000 $1.260 $1.250 $2.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 8.000 $370.000 $590.000 $480.000
REMOVE SM RD SN SUP&AM
EA 4.000 $200.000 $105.000 $60.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,552.000 $0.790 $1.000 $0.800
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 69.000 $4.310 $2.000 $5.300
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 590.000 $0.520 $0.500 $1.400
PAVEMENT SEALER 6"
LF 7,840.000 $0.090 $0.060 $0.080
PAVEMENT SEALER 8"
LF 2,051.000 $0.100 $0.080 $0.140
PAVEMENT SEALER 24"
LF 69.000 $6.950 $0.240 $0.600
PAVEMENT SEALER (ARROW)
EA 13.000 $12.000 $5.000 $47.000
PAVEMENT SEALER (WORD)
EA 13.000 $12.000 $5.000 $47.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 580.000 $0.440 $0.320 $0.850
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 2,595.000 $0.430 $0.300 $0.850
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 2,751.000 $0.440 $0.300 $0.850
PREFAB PAV MRK TY C (W) (ARROW)
EA 13.000 $200.000 $210.000 $230.000
PREFAB PAV MRK TY C (W) (WORD)
EA 13.000 $265.000 $250.000 $270.000
REFL PAV MRKR TY II-A-A
EA 23.000 $3.280 $5.000 $4.000
REFL PAV MRKR TY II-C-R
EA 140.000 $3.100 $4.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 519.000 $0.250 $0.250 $0.350
ELIM EXT PAV MRK & MRKS (6")
LF 6,537.000 $0.360 $0.350 $0.400
ELIM EXT PAV MRK & MRKS (8")
LF 1,345.000 $0.400 $0.500 $0.650
ELIM EXT PAV MRK & MRKS (24")
LF 163.000 $1.910 $2.000 $1.100
ELIM EXT PAV MRK & MRKS (ARROW)
EA 14.000 $34.650 $25.000 $56.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 14.000 $37.570 $25.000 $80.000
PAV SURF PREP FOR MRK (6")
LF 7,840.000 $0.010 $0.010 $0.020
PAV SURF PREP FOR MRK (8")
LF 2,051.000 $0.020 $0.020 $0.050
PAV SURF PREP FOR MRK (24")
LF 69.000 $0.140 $0.080 $0.150
PAV SURF PREP FOR MRK (ARROW)
EA 13.000 $2.640 $3.000 $7.900
PAV SURF PREP FOR MRK (WORD)
EA 13.000 $5.310 $3.000 $7.900
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 60.000 $63.130 $60.000 $50.000
MULTIPOLYMER PAV MRK (W)(6")(SLD)
LF 530.000 $0.520 $0.600 $1.800
MULTIPOLYMER PAV MRK (W)(6")(BRK)
LF 130.000 $0.600 $0.650 $1.800
MULTIPOLYMER PAV MRK (W)(8")(SLD)
LF 499.000 $1.030 $1.300 $2.100
MULTIPOLYMER PAV MRK (Y)(6")(SLD)
LF 544.000 $0.530 $0.650 $1.800
MULTIPOLYMER PAV MRK (BLK)(6")(BRK)
LF 120.000 $0.600 $0.750 $2.500
Totals: $163,030.770 $181,056.630 $187,587.140