Show Job Controls
Bid Cobra

WALLER BU 290H (0050-05-067)

Items: 88

County: WALLER
Length: N/A
Highway: BU 290H
District: HOUSTON
Control Number: 0050-05-067
DBE Goal: N/A
Project: STP 2020(593)
Guaranty: N/A
Time: 135 WORKING DAYS
Engineer's Estimate: $5,691,831.59
Date: 02/06/2020 (6 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$5,691,831.59
$5,433,536.70
Over/Under Est: -4.54% -$258,294.89
Over/Under Est: 1.23% $69,846.87
Amt Left: 6.04% $328,141.76
$5,873,459.85
Over/Under Est: 3.19% $181,628.26
Amt Left: 8.1% $439,923.15
Delta: -1.94% -$111,781.39
Over/Under Est: 5.93% $337,385.39
Amt Left: 10.96% $595,680.28
Delta: -2.65% -$155,757.13
Over/Under Est: 6.97% $396,496.50
Amt Left: 12.05% $654,791.39
Delta: -0.98% -$59,111.11
Subcontractor Percentage Amount
WILLOW CITY SIGN & RAIL, INC. 5.71% $329,307.41
THIRD COAST SERVICES LLC 3.82% $220,307.23
TEXOP CONSTRUCTION 3.17% $182,820.40
R & A TRANSPORT, INC. 2.01% $115,920.82
AVILES CONSTRUCTION SERVICE, INC 1.17% $67,476.30
BATTERSON, LLP 0.29% $16,724.89
LONESTAR TRAFFIC SAFETY, LLC 0.25% $14,418.01
Total: 16.42% $946,975.06

Bid Items & Bid Tabulations

88 Total 0 of 88
WALLER  |  BU 290H  |  HOUSTON  |  0050-05-067  |  02/06/2020  |  $5,691,831.59  |  STP 2020(593)  |  SURF/ROADWAY RESTOR  |  135 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
JAMES CONSTRUCTION GROUP, L.L.C.
DURWOOD GREENE CONSTRUCTION CO.
SMITH & COMPANY
KNIFE RIVER CORPORATION - SOUTH
ANGEL BROTHERS HOLDINGS CORP.
REMOVING CONC (CURB)
LF 20.000 $10.000 $37.000 $50.000 $30.000 $45.000 $12.000
REMOVING CONCRETE(MOW STRIP)
LF 1,400.000 $5.000 $6.000 $7.000 $4.000 $12.810 $10.500
BACKFILL (TY A OR B)
STA 385.000 $100.000 $77.000 $325.000 $215.000 $141.000 $241.000
SALV,HAUL & STKPL RCL APH PV (2")
SY 380,914.000 $1.000 $1.250 $0.500 $1.250 $0.910 $0.890
ASPH (MULTI OPTION)
GAL 152,366.000 $3.000 $2.800 $2.600 $3.000 $3.340 $2.900
AGGR(TY-PB GR-4 SAC-B)
CY 3,809.000 $100.000 $109.000 $95.000 $110.000 $146.000 $106.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(13")
SY 2,300.000 $85.000 $64.000 $40.000 $65.000 $69.000 $63.000
RIPRAP (MOW STRIP)(4 IN)
CY 325.000 $400.000 $415.000 $725.000 $650.000 $700.000 $630.000
MOBILIZATION
LS 1.000 $425,000.000 $330,000.000 $100,000.000 $300,000.000 $270,000.000 $393,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $5,000.000 $13,000.000 $3,500.000 $8,000.000 $8,100.000 $1,100.000
CONC CURB (DOWEL)
LF 86.000 $60.000 $14.000 $100.000 $50.000 $52.000 $23.000
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 20,578.000 $0.350 $0.350 $0.360 $0.300 $0.260 $0.400
MTL W-BEAM GD FEN (TIM POST)
LF 3,600.000 $20.000 $18.000 $22.000 $18.000 $18.950 $19.000
MTL W-BEAM GD FEN (STEEL POST)
LF 38.000 $217.000 $25.000 $50.000 $25.000 $26.300 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,000.000 $1,795.000 $2,100.000 $1,800.000 $2,200.000 $1,900.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $2,000.000 $1,150.000 $1,100.000 $1,150.000 $1,200.000 $1,250.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 100.000 $65.000 $75.000 $63.000 $75.000 $79.000 $81.000
REMOVE METAL BEAM GUARD FENCE
LF 3,075.000 $3.000 $3.000 $2.500 $3.000 $3.160 $3.250
REMOVE TERMINAL ANCHOR SECTION
EA 2.000 $430.000 $350.000 $200.000 $350.000 $368.000 $377.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $300.000 $300.000 $250.000 $300.000 $316.000 $323.000
GUARDRAIL END TREATMENT (INSTALL)
EA 39.000 $2,650.000 $2,515.000 $2,800.000 $2,515.000 $2,647.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 33.000 $225.000 $250.000 $350.000 $250.000 $263.000 $269.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 53.000 $250.000 $147.150 $180.000 $295.000 $200.000 $317.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 7.000 $320.000 $149.710 $250.000 $355.000 $263.000 $382.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 17.000 $575.000 $458.760 $550.000 $665.000 $525.000 $715.000
CONDT (PVC) (SCH 80) (2")
LF 2,535.000 $7.500 $7.500 $8.000 $7.250 $7.590 $7.750
CONDT (PVC) (SCH 80) (2") (BORE)
LF 2,395.000 $15.000 $12.000 $12.500 $11.000 $11.470 $11.750
CONDT (PVC) (SCH 80) (3")
LF 15.000 $25.000 $8.750 $10.000 $9.000 $9.520 $9.750
CONDT (PVC) (SCH 80) (3") (BORE)
LF 95.000 $30.000 $13.000 $17.000 $14.000 $14.690 $15.000
ELEC CONDR (NO.6) BARE
LF 5,025.000 $1.250 $1.100 $1.200 $1.500 $1.540 $1.600
GROUND BOX TY D (162922)W/APRON
EA 62.000 $1,000.000 $950.000 $1,000.000 $870.000 $914.000 $935.000
REPLACE EXISTING ALUMINUM SIGNS(TY A)
SF 139.000 $25.000 $23.550 $25.000 $24.000 $24.790 $25.500
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 164.000 $400.000 $330.000 $320.000 $280.000 $347.000 $355.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 42.000 $475.000 $440.000 $400.000 $360.000 $463.000 $473.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 2.000 $760.000 $485.000 $475.000 $425.000 $510.000 $522.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 3.000 $600.000 $490.000 $570.000 $490.000 $516.000 $527.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 27.000 $730.000 $620.000 $590.000 $510.000 $653.000 $667.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 7.000 $800.000 $805.000 $800.000 $710.000 $847.000 $866.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 3.000 $850.000 $715.000 $750.000 $655.000 $753.000 $769.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 5.000 $900.000 $765.000 $800.000 $685.000 $805.000 $823.000
IN SM RD SN SUP&AM TYS80(1)SA(U-BM)
EA 5.000 $800.000 $830.000 $725.000 $625.000 $874.000 $893.000
REMOVE SM RD SN SUP&AM
EA 239.000 $60.000 $50.000 $110.000 $95.000 $53.000 $54.000
REMOVE SM RD SN SUP&AM (SIGN ONLY)
EA 11.000 $75.000 $35.000 $90.000 $55.000 $37.000 $37.000
REMOVE LRSA
EA 1.000 $1,750.000 $1,850.000 $1,500.000 $1,500.000 $1,578.000 $1,615.000
INSTL OM ASSM (OM-2Y)(WC)GND
EA 40.000 $55.000 $48.000 $70.000 $48.000 $51.000 $52.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 101.000 $30.000 $25.000 $40.000 $25.000 $26.000 $27.000
WK ZN PAV MRK NON-REMOV (W)6"(BRK)
LF 50,254.000 $0.360 $0.310 $0.280 $0.250 $0.260 $0.330
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 221,229.000 $0.270 $0.220 $0.280 $0.220 $0.190 $0.300
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 7,366.000 $0.550 $0.310 $0.350 $0.450 $0.260 $0.540
WK ZN PAV MRK NON-REMOV (W)12"(SLD)
LF 5,540.000 $1.750 $0.920 $1.000 $1.500 $0.790 $2.150
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 3,370.000 $2.750 $1.220 $2.000 $2.000 $1.050 $3.750
WK ZN PAV MRK NON-REMOV (W)(ARROW)
EA 118.000 $65.000 $61.000 $55.000 $75.000 $53.000 $64.500
WK ZN PAV MRK NON-REMOV (W)(RR XING)
EA 6.000 $180.000 $128.100 $125.000 $225.000 $110.500 $269.000
WK ZN PAV MRK NON-REMOV(W)(WORD)
EA 58.000 $80.000 $61.000 $55.000 $75.000 $53.000 $70.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 23,489.000 $0.250 $0.240 $0.280 $0.250 $0.210 $0.320
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 226,456.000 $0.280 $0.220 $0.280 $0.220 $0.190 $0.300
WK ZN PAV MRK REMOV (W)(DBL ARROW)
EA 2.000 $250.000 $366.010 $300.000 $285.000 $316.000 $323.000
WK ZN PAV MRK REMOV (W)(TPL ARROW)
EA 6.000 $185.000 $366.010 $300.000 $285.000 $316.000 $377.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,683.000 $0.900 $1.220 $1.000 $1.350 $1.050 $0.730
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 2,770.000 $3.000 $3.600 $3.000 $2.250 $3.110 $3.250
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 1,685.000 $6.500 $7.260 $6.000 $8.000 $6.260 $6.450
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 105.000 $120.000 $128.100 $110.000 $125.000 $110.500 $140.000
REFL PAV MRK TY I(W)(DBL ARROW)(100MIL)
EA 1.000 $250.000 $183.000 $155.000 $200.000 $158.000 $188.000
REFL PAV MRK TY I(W)(TPL ARRW)(100MIL)
EA 3.000 $325.000 $286.710 $225.000 $200.000 $247.000 $215.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 29.000 $150.000 $152.500 $110.000 $170.000 $131.500 $161.000
REFL PAV MRK TY I (W)(RR XING)(100MIL)
EA 3.000 $575.000 $591.710 $500.000 $350.000 $510.500 $645.000
RE PV MRK TY I(BLACK)6"(SHADOW)(100MIL)
LF 27,577.000 $0.700 $0.610 $0.550 $0.650 $0.530 $0.540
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 27,577.000 $0.500 $0.540 $0.420 $0.600 $0.460 $0.460
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 25,468.000 $0.500 $0.490 $0.420 $0.600 $0.420 $0.460
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 11,745.000 $0.500 $0.540 $0.420 $0.750 $0.460 $0.460
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 118,400.000 $0.500 $0.490 $0.420 $0.600 $0.420 $0.460
REF PROF PAV MRK TY I(W)6"(SLD)(100MIL)
LF 85,146.000 $0.750 $0.940 $0.800 $0.900 $0.810 $0.860
REFL PAV MRKR TY I-C
EA 1,495.000 $4.000 $3.660 $4.000 $4.000 $3.160 $4.300
REFL PAV MRKR TY II-A-A
EA 2,873.000 $4.000 $3.600 $3.000 $4.000 $3.110 $4.300
PAV SURF PREP FOR MRK (6")
LF 295,913.000 $0.030 $0.010 $0.010 $0.010 $0.010 $0.010
PAV SURF PREP FOR MRK (8")
LF 3,683.000 $0.100 $0.020 $0.020 $0.050 $0.020 $0.020
PAV SURF PREP FOR MRK (12")
LF 2,770.000 $0.150 $0.040 $0.030 $0.100 $0.030 $0.270
PAV SURF PREP FOR MRK (24")
LF 1,685.000 $0.250 $0.060 $0.400 $0.200 $0.050 $0.540
PAV SURF PREP FOR MRK (ARROW)
EA 210.000 $15.000 $6.100 $1.000 $1.500 $5.260 $10.750
PAV SURF PREP FOR MRK (DBL ARROW)
EA 1.000 $40.000 $6.100 $1.000 $25.000 $5.260 $16.000
PAV SURF PREP FOR MRK (TPL ARROW)
EA 3.000 $50.000 $6.100 $1.000 $25.000 $5.260 $16.000
PAV SURF PREP FOR MRK (WORD)
EA 29.000 $20.000 $6.100 $1.000 $16.000 $5.260 $10.750
PAV SURF PREP FOR MRK (RR XING)
EA 3.000 $20.000 $18.300 $1.000 $35.000 $15.790 $54.000
TRF SIG CBL (TY C)(14 AWG)(2 CONDR)
LF 16,030.000 $2.350 $2.150 $2.400 $1.200 $1.260 $1.300
VEH LP DETECT (SAWCUT)
LF 8,033.500 $10.000 $9.000 $10.000 $9.150 $9.630 $9.850
D-GR HMA TY-D SAC-B PG70-22
TON 31,425.000 $80.000 $74.000 $100.000 $85.000 $89.860 $93.600
TMA (STATIONARY)
DAY 60.000 $175.000 $238.000 $450.000 $425.000 $340.000 $350.000
TMA (MOBILE OPERATION)
HR 560.000 $35.000 $55.000 $20.000 $25.000 $63.000 $44.000
Totals: $5,691,831.590 $5,433,536.700 $5,761,678.460 $5,873,459.855 $6,029,216.985 $6,088,328.095