WALKER IH0045 (6493-39-001)

Items: 44

County: WALKER
Length: 0.0100 MILES
Highway: IH0045
District: BRYAN
Control Number: 6493-39-001
DBE Goal: 0.0%
Project: RMC - A00218315
Guaranty: $8,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $389,575.00
Date: 12/10/2025 (6 months ago)
Contract Number: 12251709
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00218315
Project Description: METAL BEAM GUARD FENCE REPAIR FOR LOCATIONS IN WALKER AND MADISON COUNTIES.
Mail/Deliver Bids To: N/A
MICHAEL ESTILLETTE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$389,575.00
$268,385.00
Over/Under Est: -31.11% -$121,190.00
Over/Under Est: -16.83% -$65,575.00
Amt Left: 20.72% $55,615.00
Over/Under Est: -16.69% -$65,030.00
Amt Left: 20.93% $56,160.00
Delta: -0.17% -$545.00
Over/Under Est: -9.01% -$35,118.00
Amt Left: 32.07% $86,072.00
Delta: -9.22% -$29,912.00
Over/Under Est: 18.62% $72,525.00
Amt Left: 72.18% $193,715.00
Delta: -30.37% -$107,643.00

Bid Items & Bid Tabulations

44 Total 0 of 44
WALKER  |  IH0045  |  BRYAN  |  6493-39-001  |  12/10/2025  |  $389,575.00  |  RMC - A00218315  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
RHINO EQUITY, LLC
ROY JORGENSEN ASSOCIATES, INC.
ABOVE ALL CONTRACTING LLC
T&L CLEANING SERVICES LLC
HAZMAT INTERNATIONAL, INC.
RIPRAP (MOW STRIP)(4 IN)
CY 10.000 $700.000 $200.000 $650.000 $600.000 $500.000 $10.000
MOBILIZATION (CALLOUT)
EA 20.000 $1,000.000 $1.000 $2,000.000 $1.000 $1.000 $250.000
TMA (STATIONARY)
DAY 50.000 $500.000 $1.000 $500.000 $1.000 $1,000.000 $2,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 500.000 $35.000 $50.000 $30.000 $30.000 $40.000 $20.000
MTL W-BEAM GD FEN (STEEL POST)
LF 200.000 $40.000 $30.000 $32.000 $50.000 $1.000 $55.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,200.000 $1,600.000 $1,800.000 $2,200.000 $1.000 $2,200.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 25.000 $20.000 $1.000 $10.000 $20.000 $1.000 $25.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,700.000 $2,000.000 $1,150.000 $1,800.000 $1,500.000 $3,500.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $6.000 $1.000 $2.000 $5.000 $0.010 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $300.000 $1.000 $100.000 $300.000 $1.000 $25.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $260.000 $1.000 $200.000 $200.000 $1.000 $25.000
GUARDRAIL END TREATMENT (INSTALL)
EA 5.000 $3,400.000 $2,000.000 $3,000.000 $3,000.000 $3,000.000 $3,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 5.000 $470.000 $1.000 $250.000 $200.000 $1.000 $25.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 1,500.000 $25.000 $14.000 $15.000 $25.000 $20.000 $10.500
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 50.000 $50.000 $10.000 $25.000 $75.000 $20.000 $25.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 20.000 $80.000 $10.000 $200.000 $500.000 $20.000 $250.000
REPLACE TIMBER POST W/O CONC FND
EA 100.000 $60.000 $50.000 $80.000 $50.000 $1.000 $100.000
REPLACE STEEL POST W/O CONC FND
EA 25.000 $80.000 $55.000 $40.000 $75.000 $1.000 $100.000
REPLACE TIMBER POST W/ CONC FND
EA 50.000 $85.000 $50.000 $40.000 $50.000 $1.000 $100.000
REPLACE STEEL POST W/ CONC FND
EA 10.000 $95.000 $100.000 $250.000 $100.000 $1.000 $150.000
REALIGN POSTS
EA 100.000 $35.000 $5.000 $5.000 $20.000 $1.000 $50.000
REM OBSOLETE GET & REPL W/ SGT
EA 25.000 $4,400.000 $4,000.000 $2,800.000 $3,300.000 $6,500.000 $3,500.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 5.000 $1,000.000 $800.000 $1,100.000 $900.000 $1,000.000 $750.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 500.000 $50.000 $40.000 $25.000 $30.000 $50.000 $55.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 10.000 $150.000 $100.000 $70.000 $120.000 $100.000 $40.000
REPLACE BLOCKOUT
EA 100.000 $40.000 $30.000 $20.000 $30.000 $1.000 $65.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $150.000 $1.000 $150.000 $250.000 $200.000 $350.000
RESET SGT IMPACT HEAD
EA 5.000 $240.000 $200.000 $150.000 $100.000 $1.000 $125.000
REPLACE SGT OBJECT MARKER
EA 5.000 $20.000 $1.000 $40.000 $30.000 $1.000 $25.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $20.000 $1.000 $40.000 $100.000 $1.000 $75.000
REPLACE SGT CABLE ASSEMBLY
EA 5.000 $40.000 $1.000 $60.000 $100.000 $1.000 $100.000
REPLACE SGT STRUT
EA 5.000 $70.000 $1.000 $60.000 $100.000 $1.000 $75.000
RAISE RAIL
LF 100.000 $10.000 $1.000 $10.000 $10.000 $0.010 $25.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $1,000.000 $200.000 $1,000.000 $1,700.000 $1,200.000 $2,500.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 20.000 $35.000 $20.000 $30.000 $75.000 $50.000 $55.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 50.000 $190.000 $150.000 $120.000 $200.000 $150.000 $500.000
REPLACE POSTS (TL-4)(NU-CABLE)
EA 50.000 $190.000 $1.000 $180.000 $125.000 $1.000 $25.000
REPLACE POSTS (TL-4)(TRINITY)
EA 50.000 $190.000 $350.000 $400.000 $200.000 $200.000 $500.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 5.000 $95.000 $300.000 $150.000 $300.000 $150.000 $25.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 5.000 $130.000 $1.000 $250.000 $500.000 $1.000 $25.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,500.000 $1,500.000 $1,500.000 $3,000.000 $500.000 $3,500.000
REPLACE CABLE (TL-4)
LF 100.000 $10.000 $1.000 $3.000 $10.000 $0.010 $15.000
CHECK / RE-TENSION CABLE (TL-4)
EA 20.000 $230.000 $1.000 $100.000 $200.000 $1.000 $200.000
REPLACE POST HARDWARE (TL-4)
EA 50.000 $70.000 $50.000 $30.000 $50.000 $1.000 $100.000
Totals: $389,575.000 $268,385.000 $324,000.000 $324,545.000 $354,457.000 $462,100.000