WALKER SH0030 (6478-26-001)

Items: 46

County: WALKER
Length: 0.0100 MILES
Highway: SH0030
District: BRYAN
Control Number: 6478-26-001
DBE Goal: N/A
Project: RMC - A00213243
Guaranty: $14,000.00
Time: 365 CALENDAR DAYS
Engineer's Estimate: $702,175.00
Date: 01/14/2025 (1 year ago)
Contract Number: 1251702
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00213243
Project Description: REPAIR AND UPGRADE OF METAL BEAM AND CABLE GUARD FENCE FOR LOCATIONS IN WALKER AND MADISON COUNTIES
Mail/Deliver Bids To: N/A
MICHAEL ESTILLETTE
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$702,175.00
$465,520.00
Over/Under Est: -33.7% -$236,655.00
Over/Under Est: -20.93% -$146,950.00
Amt Left: 19.27% $89,705.00
Over/Under Est: -16.75% -$117,605.00
Amt Left: 25.57% $119,050.00
Delta: -5.29% -$29,345.00
Over/Under Est: -14.99% -$105,270.00
Amt Left: 28.22% $131,385.00
Delta: -2.11% -$12,335.00
Subcontractor Percentage Amount
ELITE CASTLE RESOURCES LLC 0.00% $0.00
Total: 0.00% $0.00

Bid Items & Bid Tabulations

46 Total 0 of 46
WALKER  |  SH0030  |  BRYAN  |  6478-26-001  |  01/14/2025  |  $702,175.00  |  RMC - A00213243  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROSS SA ENTERPRISE LLC
HAZMAT INTERNATIONAL, INC.
ABOVE ALL CONTRACTING LLC
AAD CONTRACTING INC.
RIPRAP (MOW STRIP)(4 IN)
CY 15.000 $700.000 $425.000 $400.000 $500.000 $150.000
MOBILIZATION (CALLOUT)
EA 20.000 $1,000.000 $1.000 $50.000 $1.000 $2,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 15.000 $160.000 $100.000 $50.000 $150.000 $100.000
TMA (STATIONARY)
DAY 50.000 $500.000 $1.000 $1,500.000 $600.000 $250.000
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $37.000 $60.000 $100.000 $60.000 $32.000
MTL W-BEAM GD FEN (STEEL POST)
LF 100.000 $45.000 $60.000 $65.000 $50.000 $34.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 5.000 $2,400.000 $1,500.000 $2,500.000 $3,000.000 $500.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 50.000 $50.000 $10.000 $2.000 $20.000 $1.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 5.000 $1,700.000 $2,000.000 $250.000 $1,500.000 $1,600.000
MTL BM GD FEN TRANS (31"-28")
EA 100.000 $850.000 $250.000 $50.000 $100.000 $420.000
REMOVE METAL BEAM GUARD FENCE
LF 175.000 $10.000 $10.000 $5.000 $20.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 5.000 $320.000 $1.000 $25.000 $200.000 $100.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 5.000 $270.000 $1.000 $25.000 $250.000 $100.000
GUARDRAIL END TREATMENT (INSTALL)
EA 20.000 $3,450.000 $2,000.000 $2,500.000 $2,800.000 $4,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 15.000 $370.000 $1.000 $50.000 $200.000 $100.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 3,500.000 $30.000 $20.000 $25.000 $25.000 $18.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 110.000 $70.000 $10.000 $25.000 $50.000 $15.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 30.000 $70.000 $10.000 $50.000 $2,500.000 $150.000
REPLACE TIMBER POST W/O CONC FND
EA 100.000 $35.000 $105.000 $100.000 $100.000 $65.000
REPLACE STEEL POST W/O CONC FND
EA 25.000 $70.000 $85.000 $70.000 $100.000 $90.000
REPLACE TIMBER POST W/ CONC FND
EA 25.000 $90.000 $55.000 $50.000 $100.000 $65.000
REPLACE STEEL POST W/ CONC FND
EA 10.000 $55.000 $80.000 $70.000 $100.000 $90.000
REALIGN POSTS
EA 100.000 $45.000 $10.000 $15.000 $20.000 $20.000
REM OBSOLETE GET & REPL W/ SGT
EA 30.000 $3,900.000 $4,000.000 $4,000.000 $3,000.000 $4,200.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 10.000 $1,000.000 $850.000 $1,000.000 $1,000.000 $1,600.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 300.000 $40.000 $80.000 $65.000 $50.000 $42.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 15.000 $105.000 $100.000 $100.000 $250.000 $65.000
REPLACE BLOCKOUT
EA 300.000 $65.000 $25.000 $100.000 $20.000 $25.000
REPAIR STEEL POST WITH BASE PLATE
EA 5.000 $155.000 $300.000 $50.000 $300.000 $1.000
RESET SGT IMPACT HEAD
EA 10.000 $220.000 $300.000 $200.000 $300.000 $200.000
REPLACE SGT OBJECT MARKER
EA 10.000 $40.000 $1.000 $30.000 $50.000 $20.000
REPLACE SGT CABLE ANCHOR
EA 10.000 $70.000 $1.000 $75.000 $100.000 $70.000
REPLACE SGT CABLE ASSEMBLY
EA 10.000 $70.000 $1.000 $100.000 $100.000 $90.000
REPLACE SGT STRUT
EA 10.000 $70.000 $1.000 $50.000 $100.000 $60.000
RAISE RAIL
LF 500.000 $10.000 $5.000 $0.500 $10.000 $1.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 10.000 $1,200.000 $950.000 $200.000 $1,500.000 $1,600.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 25.000 $32.000 $40.000 $20.000 $100.000 $25.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 75.000 $190.000 $300.000 $150.000 $220.000 $300.000
REPLACE POSTS (TL-4)(NU-CABLE)
EA 75.000 $190.000 $200.000 $150.000 $200.000 $250.000
REPLACE POSTS (TL-4)(TRINITY)
EA 75.000 $190.000 $300.000 $400.000 $220.000 $300.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 10.000 $520.000 $150.000 $150.000 $250.000 $300.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 10.000 $210.000 $1.000 $50.000 $300.000 $25.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $1,700.000 $2,000.000 $2,200.000 $2,250.000 $2,500.000
REPLACE CABLE (TL-4)
LF 400.000 $5.000 $5.000 $5.000 $12.000 $4.000
CHECK / RE-TENSION CABLE (TL-4)
EA 50.000 $450.000 $1.000 $100.000 $50.000 $300.000
REPLACE POST HARDWARE (TL-4)
EA 250.000 $190.000 $50.000 $35.000 $50.000 $40.000
Totals: $702,175.000 $465,520.000 $555,225.000 $584,570.000 $596,905.000