WALKER SH0030 (6282-02-001)

Items: 32

County: WALKER
Length: N/A
Highway: SH0030
District: BRYAN
Control Number: 6282-02-001
DBE Goal: N/A
Project: RMC - 628202001
Guaranty: N/A
Time: 730 CALENDAR DAYS
Engineer's Estimate: $172,663.00
Date: 06/01/2021 (5 years ago)
Contract Number: N/A
Type: MBGF & CABLE BARRIER REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$172,663.00
$198,527.00
Over/Under Est: 14.98% $25,864.00
Over/Under Est: 36.89% $63,699.00
Amt Left: 19.06% $37,835.00
Over/Under Est: 68.93% $119,012.00
Amt Left: 46.92% $93,148.00
Delta: -23.40% -$55,313.00

Bid Items & Bid Tabulations

32 Total 0 of 32
WALKER  |  SH0030  |  BRYAN  |  6282-02-001  |  06/01/2021  |  $172,663.00  |  RMC - 628202001  |  MBGF & CABLE BARRIER REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ROY LEE WALKER
T & L CLEANING SERVICES
SHORT-LINE CORPORATION
RIPRAP (MOW STRIP)(4 IN)
CY 30.000 $200.000 $80.000 $300.000 $100.000
MOBILIZATION (CALLOUT)
EA 100.000 $150.000 $1.000 $100.000 $100.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 9.000 $10.000 $100.000 $1,600.000 $1,500.000
MTL W-BEAM GD FEN ADJUSTMENT
LF 150.000 $2.500 $1.000 $2.000 $5.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 3,000.000 $10.000 $10.000 $13.000 $20.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 75.000 $6.000 $1.000 $20.000 $25.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 40.000 $5.000 $1.000 $22.000 $25.000
RAISE RAIL ELEMENT
LF 75.000 $5.000 $1.000 $2.000 $5.000
REM / REPL TIMBER/STL POST W/O CONC FND
EA 225.000 $20.000 $45.000 $30.000 $40.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 10.000 $20.000 $45.000 $35.000 $40.000
REALIGN POSTS
EA 225.000 $5.000 $20.000 $10.000 $15.000
REMOVE & REPLACE BLOCKOUT
EA 15.000 $10.000 $10.000 $10.000 $65.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 450.000 $20.000 $16.000 $20.000 $25.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $100.000 $45.000 $35.000 $50.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 10.000 $56.000 $1.000 $1.000 $5.000
REPLACE TERMINAL ANCHOR POSTS
EA 10.000 $50.000 $1.000 $1.000 $5.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 25.000 $1,850.000 $2,200.000 $2,000.000 $3,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 15.000 $785.000 $1,000.000 $750.000 $700.000
REPLACE SGT CABLE ASSEMBLY
EA 6.000 $35.000 $1.000 $1.000 $100.000
REPLACE SGT CABLE ANCHOR
EA 5.000 $20.000 $1.000 $1.000 $100.000
REPLACE SGT STRUT
EA 6.000 $18.000 $1.000 $1.000 $100.000
REPLACE SGT OBJECT MARKER
EA 5.000 $14.000 $1.000 $25.000 $100.000
REPAIR RAIL ELEMENT (CURVED RAIL)(FURN)
LF 75.000 $10.000 $10.000 $10.000 $25.000
REM & RESET SGT IMPACT HEAD (FURNISHED)
EA 25.000 $500.000 $100.000 $50.000 $100.000
REPAIR STEEL POST WITH BASE PLATE
EA 10.000 $50.000 $1.000 $1.000 $150.000
REPLACE POSTS (TL-4)
EA 800.000 $20.000 $78.000 $70.000 $75.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 15.000 $50.000 $10.000 $100.000 $100.000
REPAIR CONCRETE FOUNDATION (TL-4)
EA 125.000 $25.000 $10.000 $100.000 $50.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 10.000 $200.000 $100.000 $500.000 $300.000
REPLACE CABLE (TL-4)
LF 500.000 $2.000 $1.000 $1.000 $1.000
REPLACE POST HARDWARE (TL-4)
EA 150.000 $20.000 $10.000 $13.000 $25.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 10.000 $100.000 $1.000 $1.000 $500.000
Totals: $172,663.000 $198,527.000 $236,362.000 $291,675.000