Show Job Controls
Bid Cobra

WALKER CR (0917-27-047)

Items: 39

County: WALKER
Length: N/A
Highway: CR
District: BRYAN
Control Number: 0917-27-047
DBE Goal: N/A
Project: BR 2022(283)
Guaranty: N/A
Time: 110 WORKING DAYS
Engineer's Estimate: $645,072.00
Date: 08/02/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
DELMY REYES
MATT HENSARLING
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (5)
E
Engineer's Estimate
$645,072.00
1
$832,940.17
Over/Under Est: 29.12% $187,868.17
Over/Under Est: 45.64% $294,408.20
Amt Left: 12.79% $106,540.03
Over/Under Est: 46.75% $301,575.00
Amt Left: 13.65% $113,706.83
Delta: -0.76% -$7,166.80
Over/Under Est: 65.97% $425,566.32
Amt Left: 28.54% $237,698.15
Delta: -13.10% -$123,991.32
Over/Under Est: 82.74% $533,751.50
Amt Left: 41.53% $345,883.33
Delta: -10.10% -$108,185.18
Subcontractor Percentage Amount
JH CONTRACT FIELD SERVICES, LLC 8.97% $74,804.43
LONESTAR TRAFFIC SAFETY, LLC 0.59% $4,920.25
SUPERIOR TRAFFIC CONTROL, LLC 0.53% $4,419.88
CAP RIVER LLC 0.45% $3,752.73
HOUSTON SAWING & DRILLING 0.42% $3,502.55
A1 EROSION CONTROL 0.24% $2,001.46
Total: 11.20% $93,401.30

Bid Items & Bid Tabulations

39 Total 0 of 39
WALKER  |  CR  |  BRYAN  |  0917-27-047  |  08/02/2023  |  $645,072.00  |  BR 2022(283)  |  BRIDGE REPL  |  110 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TREVWAY, INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
TEXAS MATERIALS GROUP, INC.
FUQUA CONSTRUCTION CO., INC.
KNIFE RIVER CORPORATION - SOUTH
PREPARING ROW
AC 0.490 $50,000.000 $27,311.000 $50,000.000 $90,000.000 $16,917.855 $277,000.000
OBLITERATING ABANDONED ROAD
SY 139.000 $5.000 $150.000 $60.000 $30.000 $64.633 $84.000
EXCAVATION (ROADWAY)
CY 111.000 $30.000 $78.360 $35.000 $83.000 $42.237 $41.300
EXCAVATION (CHANNEL)
CY 199.000 $30.000 $34.970 $30.000 $55.000 $56.491 $55.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 336.000 $30.000 $25.000 $30.000 $72.000 $54.681 $28.900
FURNISHING AND PLACING TOPSOIL (4")
SY 1,220.000 $5.000 $10.750 $5.000 $5.000 $7.612 $6.850
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 1,220.000 $0.750 $2.530 $4.000 $1.250 $1.930 $1.470
CELL FBR MLCH SEED(TEMP)(WARM)
SY 610.000 $0.750 $2.530 $1.000 $1.550 $3.343 $1.820
CELL FBR MLCH SEED(TEMP)(COOL)
SY 610.000 $0.750 $2.530 $1.000 $1.550 $3.846 $1.820
VEGETATIVE WATERING
MG 12.200 $100.000 $500.000 $1.000 $45.000 $156.718 $44.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 1,068.000 $21.000 $82.480 $40.000 $45.000 $36.386 $30.660
REWORK BS MTL (TY D)(SURF)(ORD COMP)
SY 569.000 $4.000 $12.000 $20.000 $16.000 $4.193 $13.850
CEMENT
TON 18.000 $250.000 $189.000 $350.000 $290.000 $404.146 $264.000
CEMENT TREAT (SUBGRADE)(6")
SY 1,250.000 $5.000 $25.000 $20.000 $25.000 $14.350 $7.440
CEM STABIL BKFL
CY 73.000 $220.000 $200.000 $300.000 $325.000 $315.644 $224.000
DRILL SHAFT (42 IN)
LF 270.000 $350.000 $485.550 $410.000 $550.000 $779.274 $525.000
CL C CONC (ABUT)
CY 35.200 $1,775.000 $1,200.000 $2,800.000 $2,200.000 $2,300.668 $1,245.000
REINF CONC SLAB
SF 2,080.000 $40.000 $25.000 $40.000 $67.000 $46.514 $88.280
PRESTR CONC GIRDER (TX34)
LF 318.000 $225.000 $293.810 $510.000 $300.000 $300.210 $432.000
RIPRAP (CONC)(CL B)(RR8&RR9)
CY 56.000 $550.000 $600.000 $800.000 $750.000 $868.523 $887.000
RAIL (TY T631LS)
LF 196.000 $94.000 $147.000 $80.000 $65.000 $128.836 $76.450
ARMOR JOINT (SEALED)
LF 52.000 $120.000 $80.000 $200.000 $220.000 $201.920 $211.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $25,000.000 $50,000.000 $40,000.000 $15,000.000 $56,101.103 $21,950.000
MOBILIZATION
LS 1.000 $64,500.000 $75,000.000 $85,000.000 $90,000.000 $97,330.702 $220,600.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $3,000.000 $1,000.000 $2,500.000 $3,000.000 $11,192.336 $2,300.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 126.000 $40.000 $15.000 $1.000 $38.000 $68.594 $44.700
ROCK FILTER DAMS (REMOVE)
LF 126.000 $11.000 $5.000 $1.000 $10.000 $22.905 $11.800
TEMP SEDMT CONT FENCE (INSTALL)
LF 588.000 $5.000 $4.000 $1.000 $4.500 $10.641 $5.290
TEMP SEDMT CONT FENCE (REMOVE)
LF 588.000 $1.000 $1.000 $1.000 $1.500 $2.239 $1.750
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 120.000 $50.000 $126.000 $130.000 $100.000 $69.557 $51.900
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 40.000 $50.000 $172.000 $130.000 $100.000 $91.507 $19.600
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 120.000 $15.000 $29.000 $80.000 $38.000 $19.855 $62.350
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 40.000 $15.000 $89.000 $80.000 $38.000 $21.351 $24.000
MTL W-BEAM GD FEN (TIM POST)
LF 141.500 $30.000 $45.780 $30.000 $38.000 $40.686 $41.170
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,250.000 $3,488.000 $4,000.000 $3,150.000 $4,847.451 $3,706.000
REMOVE SM RD SN SUP&AM
EA 2.000 $100.000 $100.000 $50.000 $140.000 $267.278 $118.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 6.000 $40.000 $18.000 $50.000 $35.000 $66.656 $41.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $550.000 $600.000 $500.000 $300.000 $1,239.556 $823.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $15,157.000 $20,000.000 $10,000.000 $18,876.890 $14,800.000
Totals: $645,072.000 $832,940.170 $939,480.200 $946,647.000 $1,070,638.464 $1,178,823.505