WALKER CR (0917-27-046)

Items: 47

County: WALKER
Length: N/A
Highway: CR
District: BRYAN
Control Number: 0917-27-046
DBE Goal: N/A
Project: BR 2023(082)
Guaranty: N/A
Time: 201 WORKING DAYS
Engineer's Estimate: $1,770,438.00
Date: 05/04/2023 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
DELMY REYES
MATT HENSARLING
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$1,770,438.00
$1,498,226.55
Over/Under Est: -15.38% -$272,211.45
Over/Under Est: -0.54% -$9,538.05
Amt Left: 17.53% $262,673.40
Over/Under Est: -0.13% -$2,323.75
Amt Left: 18.01% $269,887.70
Delta: -0.41% -$7,214.30
Over/Under Est: 11.38% $201,389.62
Amt Left: 31.61% $473,601.07
Delta: -11.52% -$203,713.37
Subcontractor Percentage Amount
TRAFFIC SIGNS & LINES, LLC 4.26% $66,338.05
WILLOW CITY SIGN & RAIL, INC. 3.17% $49,364.23
GMJ PAVING CO. 2.00% $31,144.62
HIGHWAY 1 LLC 0.63% $9,810.56
QUALITY TURF FARMS, L.C. 0.45% $7,007.54
SEMARCK LANDSCAPE SERVICES, INC. 0.42% $6,540.37
HOUSTON SAWING & DRILLING 0.18% $2,803.02
Total: 11.11% $173,008.39

Bid Items & Bid Tabulations

47 Total 0 of 47
WALKER  |  CR  |  BRYAN  |  0917-27-046  |  05/04/2023  |  $1,770,438.00  |  BR 2023(082)  |  BRIDGE REPL  |  201 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
R CONSTRUCTION CIVIL, LLC
FUQUA CONSTRUCTION CO., INC.
TEXAS MATERIALS GROUP, INC.
PROJECT ALLIED RESOURCES, LLC
PREPARING ROW
STA 4.400 $7,700.000 $7,137.000 $5,757.500 $40,000.000 $24,800.000
EXCAVATION (ROADWAY)
CY 230.000 $35.000 $5.000 $40.000 $75.000 $30.000
EXCAVATION (CHANNEL)
CY 225.000 $70.000 $6.500 $40.000 $50.000 $37.300
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 120.000 $50.000 $2.000 $40.000 $62.000 $43.500
FURNISHING AND PLACING TOPSOIL (4")
SY 2,229.000 $6.000 $4.000 $1.140 $4.000 $3.420
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 2,229.000 $1.500 $0.950 $1.000 $1.000 $1.100
CELL FBR MLCH SEED(TEMP)(WARM)
SY 1,115.000 $1.700 $3.000 $1.000 $1.000 $1.100
CELL FBR MLCH SEED(TEMP)(COOL)
SY 1,115.000 $2.000 $4.000 $1.000 $1.000 $1.100
VEGETATIVE WATERING
MG 22.300 $200.000 $45.000 $10.410 $30.000 $130.000
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
SY 788.000 $45.000 $30.000 $14.510 $50.000 $32.400
ASPH (RC-250)
GAL 181.000 $15.000 $14.000 $4.700 $27.000 $25.300
AGGR (TY-B GR-5 OR TY-L GR-5)
CY 6.000 $690.000 $492.000 $145.450 $2,000.000 $604.000
CEM STABIL BKFL
CY 53.000 $250.000 $58.000 $200.000 $260.000 $374.000
TRENCH EXCAVATION PROTECTION
LF 180.000 $60.000 $2.500 $4.000 $20.000 $9.300
DRILL SHAFT (24 IN)
LF 660.000 $260.000 $208.000 $220.000 $275.000 $324.000
CL C CONC (ABUT)
CY 20.400 $1,710.000 $2,391.000 $2,200.000 $2,600.000 $1,940.000
CL C CONC (CAP)
CY 13.200 $2,040.000 $3,537.000 $2,200.000 $3,600.000 $2,660.000
CL C CONC (COLUMN)
CY 5.300 $2,140.000 $7,990.000 $2,200.000 $3,300.000 $2,540.000
REINF CONC SLAB (SLAB BEAM)
SF 3,640.000 $30.000 $91.000 $30.000 $35.000 $30.400
PRESTR CONC SLAB BEAM (5SB15)
LF 692.500 $285.000 $298.000 $271.910 $330.000 $277.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 401.000 $255.000 $217.000 $330.000 $220.000 $273.000
RAIL (TY T631)
LF 304.000 $95.000 $94.000 $123.080 $83.000 $132.000
ARMOR JOINT (SEALED)
LF 51.000 $180.000 $101.000 $112.580 $160.000 $179.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $165,000.000 $9,838.000 $80,966.980 $100,000.000 $59,000.000
REMOV STR (SMALL FENCE)
LF 732.000 $10.000 $1.700 $5.000 $3.000 $4.900
MOBILIZATION
LS 1.000 $150,000.000 $120,000.000 $270,000.000 $170,000.000 $212,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 14.000 $10,800.000 $3,835.000 $8,838.770 $1,000.000 $2,890.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 94.000 $45.000 $40.000 $42.000 $35.000 $60.000
ROCK FILTER DAMS (REMOVE)
LF 94.000 $20.000 $1.700 $12.000 $10.000 $18.300
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,047.000 $6.000 $4.000 $4.750 $5.000 $5.800
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,047.000 $2.000 $1.100 $1.750 $1.750 $1.820
CONSTRUCTING DETOURS
SY 935.000 $105.000 $26.000 $89.000 $115.000 $144.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 5.000 $5,250.000 $5,311.000 $700.000 $5,000.000 $6,490.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 660.000 $60.000 $31.000 $65.000 $35.000 $93.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 80.000 $65.000 $32.000 $62.000 $35.000 $90.000
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 660.000 $20.000 $7.500 $7.950 $18.000 $10.100
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 80.000 $25.000 $8.000 $11.260 $18.000 $10.100
MTL W-BEAM GD FEN (TIM POST)
LF 137.500 $35.000 $30.000 $27.000 $26.000 $29.200
MTL BEAM GD FEN TRANS (TL2)
EA 4.000 $1,550.000 $1,536.000 $1,409.000 $1,300.000 $1,130.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,400.000 $3,496.000 $3,138.140 $3,000.000 $3,160.000
WIRE FENCE (TY A)
LF 703.000 $45.000 $2.500 $15.430 $15.000 $37.800
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 8.000 $580.000 $320.000 $420.000 $420.000 $609.000
REMOVE SM RD SN SUP&AM
EA 2.000 $145.000 $112.000 $112.810 $100.000 $133.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 9.000 $50.000 $39.000 $35.000 $32.000 $49.500
SP MIXES SP-C PG64-22
TON 117.000 $200.000 $177.000 $105.150 $310.000 $214.000
TEMPORARY DETOUR BRIDGE
EA 1.000 $165,000.000 $153,577.000 $296,500.000 $150,000.000 $355,000.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $500.000 $550.000 $333.160 $350.000 $720.000
Totals: $1,770,438.000 $1,498,226.550 $1,760,899.958 $1,768,114.250 $1,971,827.620