PREPARING ROW
|
STA
|
301.000
|
$3,000.000
|
$14,500.000
|
$11,890.000
|
$20,980.040
|
$8,000.000
|
$16,207.000
|
|
|
REMOVING CONC (PAV)
|
SY
|
164,668.000
|
$3.650
|
$9.750
|
$5.000
|
$4.060
|
$5.000
|
$3.450
|
|
|
REMOVING CONC (CTB)
|
LF
|
750.000
|
$5.250
|
$25.000
|
$6.000
|
$5.250
|
$8.000
|
$8.690
|
|
|
REMOVING CONC (APPR SLAB)
|
SY
|
621.000
|
$12.500
|
$100.000
|
$6.000
|
$12.500
|
$5.000
|
$15.440
|
|
|
REMOVING STAB BASE & ASPH PAV (4" - 6")
|
SY
|
3,509.000
|
$4.700
|
$2.500
|
$2.000
|
$2.700
|
$2.220
|
$7.460
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
579,263.000
|
$7.200
|
$3.500
|
$5.000
|
$6.980
|
$7.000
|
$6.130
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
|
CY
|
161,535.000
|
$11.500
|
$11.000
|
$8.000
|
$16.960
|
$15.000
|
$14.940
|
|
|
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
|
CY
|
452,378.000
|
$4.500
|
$5.000
|
$3.000
|
$5.070
|
$7.000
|
$8.300
|
|
|
BACKFILL (TY B)
|
STA
|
630.000
|
$200.000
|
$240.000
|
$300.000
|
$530.120
|
$500.000
|
$297.690
|
|
|
BLADING
|
HR
|
120.000
|
$155.000
|
$300.000
|
$130.000
|
$300.000
|
$85.000
|
$90.280
|
|
|
GENERAL USE COMPOST
|
CY
|
2,810.000
|
$23.750
|
$25.000
|
$20.000
|
$23.490
|
$26.180
|
$23.490
|
|
|
COMPOST MANUF TOPSOIL (4")
|
SY
|
525,601.000
|
$1.000
|
$2.000
|
$0.740
|
$1.850
|
$0.730
|
$0.740
|
|
|
BLOCK SODDING
|
SY
|
6,500.000
|
$3.000
|
$3.150
|
$3.180
|
$3.180
|
$4.190
|
$3.180
|
|
|
BROADCAST SEED (TEMP) (WARM)
|
SY
|
131,400.000
|
$0.130
|
$0.080
|
$0.080
|
$0.080
|
$0.130
|
$0.080
|
|
|
BROADCAST SEED (TEMP) (COOL)
|
SY
|
131,400.000
|
$0.130
|
$0.080
|
$0.080
|
$0.080
|
$0.130
|
$0.080
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
131,400.000
|
$0.250
|
$0.290
|
$0.290
|
$0.290
|
$0.290
|
$0.290
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
131,400.000
|
$0.250
|
$0.290
|
$0.290
|
$0.290
|
$0.290
|
$0.290
|
|
|
DRILL SEEDING (PERM) (RURAL) (SANDY)
|
SY
|
123,951.000
|
$0.100
|
$0.120
|
$0.120
|
$0.120
|
$0.150
|
$0.120
|
|
|
DRILL SEEDING (PERM) (URBAN) (SANDY)
|
SY
|
401,650.000
|
$0.160
|
$0.100
|
$0.100
|
$0.100
|
$0.150
|
$0.100
|
|
|
VEGETATIVE WATERING
|
MG
|
8,830.000
|
$17.000
|
$27.000
|
$27.000
|
$28.000
|
$16.760
|
$27.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY D)
|
SY
|
3,472.000
|
$0.850
|
$1.020
|
$1.020
|
$1.020
|
$0.970
|
$1.020
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY E)
|
SY
|
17,868.000
|
$1.000
|
$1.190
|
$1.190
|
$1.190
|
$1.030
|
$1.190
|
|
|
SOIL RETENTION BLANKETS (CL 2) (TY F)
|
SY
|
465.000
|
$8.000
|
$10.300
|
$10.300
|
$10.300
|
$9.430
|
$10.300
|
|
|
WILDFLOWER SEEDING
|
AC
|
101.000
|
$850.000
|
$904.970
|
$904.970
|
$904.970
|
$2,670.800
|
$904.970
|
|
|
MULCH
|
CY
|
5,620.000
|
$22.500
|
$25.000
|
$25.290
|
$25.290
|
$25.140
|
$25.290
|
|
|
PLANT MATERIAL (15 GAL) (TREE)
|
EA
|
786.000
|
$170.000
|
$175.000
|
$177.740
|
$177.740
|
$94.260
|
$177.740
|
|
|
PLANT MATERIAL (3 GAL) (SHRUB)
|
EA
|
29.000
|
$30.000
|
$63.000
|
$63.130
|
$63.130
|
$12.570
|
$63.130
|
|
|
PLANT MATERIAL (5 GAL) (SHRUB)
|
EA
|
59.000
|
$50.000
|
$67.000
|
$67.120
|
$67.120
|
$23.040
|
$67.120
|
|
|
PLANT BED PREP (TYPE I)
|
SY
|
50,578.000
|
$1.750
|
$2.500
|
$2.860
|
$2.860
|
$1.930
|
$2.860
|
|
|
PLANT MATERIAL (7-GAL)
|
EA
|
349.000
|
$60.000
|
$140.000
|
$148.900
|
$148.900
|
$61.800
|
$148.900
|
|
|
FL BS (CMP IN PLC)(TY D GR 4) (6")
|
SY
|
3,544.000
|
$12.000
|
$25.000
|
$19.500
|
$14.780
|
$18.950
|
$14.460
|
|
|
FL BS(CMP IN PLC)(TY D GR 4)(15")
|
SY
|
2,120.000
|
$15.000
|
$47.000
|
$42.710
|
$39.780
|
$41.460
|
$32.200
|
|
|
CEMENT
|
TON
|
11,181.000
|
$115.000
|
$115.000
|
$150.000
|
$117.890
|
$125.000
|
$123.590
|
|
|
CEMENT TREAT (EXIST MATL)(12")
|
SY
|
483,442.000
|
$2.500
|
$3.260
|
$1.500
|
$3.170
|
$3.000
|
$1.980
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
121,931.000
|
$2.500
|
$3.280
|
$2.500
|
$3.880
|
$2.500
|
$1.530
|
|
|
CEM TRT(PLNT MX) (CL N)(TY D)(GR 4)(6")
|
SY
|
605,375.000
|
$10.650
|
$9.000
|
$13.000
|
$10.620
|
$11.000
|
$14.730
|
|
|
CEM TRT(PLNT MX)(CL N)(TY D)(GR 4)(8")
|
SY
|
2,121.000
|
$16.000
|
$24.000
|
$20.000
|
$18.510
|
$16.000
|
$26.700
|
|
|
PRIME COAT (MULTI OPTION)
|
GAL
|
121,964.000
|
$3.850
|
$3.100
|
$3.500
|
$3.920
|
$3.670
|
$3.650
|
|
|
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
|
CY
|
877.000
|
$120.000
|
$128.000
|
$150.000
|
$137.410
|
$115.000
|
$152.210
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
41,658.000
|
$3.500
|
$3.000
|
$2.500
|
$3.210
|
$3.150
|
$2.450
|
|
|
SUPERPAVE MIXTURES SP-B PG64-22
|
TON
|
642.000
|
$81.000
|
$86.000
|
$105.000
|
$78.380
|
$75.000
|
$105.980
|
|
|
SUPERPAVE MIXTURES SP-C PG64-22
|
TON
|
293.000
|
$90.000
|
$110.000
|
$90.000
|
$101.790
|
$85.000
|
$126.560
|
|
|
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
|
TON
|
476.000
|
$100.000
|
$100.000
|
$155.000
|
$101.790
|
$90.000
|
$116.270
|
|
|
SUPERPAVE MIXTURES SP-D PG64-22
|
TON
|
36,207.000
|
$86.000
|
$65.000
|
$94.000
|
$78.380
|
$80.000
|
$84.370
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
116,534.000
|
$2.900
|
$2.500
|
$2.020
|
$2.430
|
$1.770
|
$4.870
|
|
|
PLANE ASPH CONC PAV (6"- 7.5")
|
SY
|
114,736.000
|
$3.200
|
$2.750
|
$2.330
|
$2.810
|
$3.480
|
$2.650
|
|
|
PLANE ASPH CONC PAV (5")
|
SY
|
164,668.000
|
$2.500
|
$3.750
|
$1.240
|
$2.030
|
$1.610
|
$1.990
|
|
|
PLANE ASPH CONC PAV (1" TO 4")
|
SY
|
84,336.000
|
$1.500
|
$1.750
|
$0.690
|
$1.000
|
$1.830
|
$1.410
|
|
|
CONC PVMT (CONT REINF - CRCP) (8")
|
SY
|
111,823.000
|
$36.000
|
$38.000
|
$44.000
|
$36.940
|
$40.000
|
$46.830
|
|
|
CONC PVMT (CONT REINF - CRCP) (15")
|
SY
|
466,012.000
|
$58.850
|
$57.750
|
$55.000
|
$60.830
|
$65.000
|
$70.530
|
|
|
CONC PVMT (CRCP)(JCT TERMINAL)(15")
|
SY
|
200.000
|
$70.000
|
$150.000
|
$90.000
|
$129.280
|
$125.000
|
$102.030
|
|
|
CONC PVMT (CRCP)(JCT TERMINAL)(8")
|
SY
|
758.000
|
$60.000
|
$47.000
|
$90.000
|
$86.980
|
$90.000
|
$67.810
|
|
|
STRUCT EXCAV
|
CY
|
4,900.000
|
$9.000
|
$20.000
|
$2.000
|
$17.220
|
$8.000
|
$6.610
|
|
|
STRUCT EXCAV (BRIDGE)
|
CY
|
419.000
|
$39.000
|
$35.000
|
$6.000
|
$23.970
|
$15.000
|
$19.790
|
|
|
CEM STABIL BKFL
|
CY
|
14,585.000
|
$47.000
|
$68.000
|
$50.000
|
$51.520
|
$45.000
|
$58.930
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
6,803.000
|
$125.000
|
$3.000
|
$5.000
|
$2.030
|
$3.000
|
$1.590
|
|
|
TEMPORARY SPL SHORING
|
SF
|
100,153.000
|
$18.500
|
$13.000
|
$8.000
|
$1.000
|
$25.000
|
$25.270
|
|
|
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
|
EA
|
13.000
|
$25,000.000
|
$9,800.000
|
$40,000.000
|
$26,699.340
|
$10,000.000
|
$24,077.010
|
|
|
SOIL NAIL ANCHORS
|
LF
|
21,210.000
|
$20.000
|
$14.000
|
$17.000
|
$12.220
|
$14.000
|
$14.200
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
1,220.000
|
$50.000
|
$57.500
|
$52.380
|
$49.610
|
$50.000
|
$44.780
|
|
|
DRILL SHAFT (24 IN)
|
LF
|
170.000
|
$125.000
|
$107.500
|
$90.650
|
$79.660
|
$85.000
|
$75.050
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
7,002.000
|
$130.000
|
$150.000
|
$190.000
|
$145.170
|
$160.000
|
$145.450
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
5,119.000
|
$205.000
|
$200.000
|
$250.000
|
$202.520
|
$215.000
|
$203.220
|
|
|
DRILL SHAFT (54 IN)
|
LF
|
530.000
|
$375.000
|
$675.000
|
$555.000
|
$500.000
|
$395.000
|
$346.790
|
|
|
DRILL SHAFT (78 IN)
|
LF
|
100.000
|
$670.000
|
$1,400.000
|
$1,283.000
|
$1,300.000
|
$800.000
|
$754.050
|
|
|
DRILL SHAFT (SIGN MTS) (24 IN)
|
LF
|
66.000
|
$140.000
|
$133.000
|
$133.000
|
$76.630
|
$80.260
|
$110.000
|
|
|
DRILL SHAFT (HIGH MAST POLE) (60 IN)
|
LF
|
264.000
|
$550.000
|
$18.000
|
$518.000
|
$750.660
|
$786.220
|
$518.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
410.000
|
$180.000
|
$144.000
|
$144.000
|
$183.540
|
$192.230
|
$144.000
|
|
|
CL B CONC (FLUME)
|
CY
|
48.000
|
$450.000
|
$650.000
|
$500.000
|
$450.000
|
$450.000
|
$394.730
|
|
|
CL C CONC (ABUT)
|
CY
|
503.800
|
$930.000
|
$1,100.000
|
$750.000
|
$1,074.400
|
$800.000
|
$788.470
|
|
|
CL C CONC (CAP)
|
CY
|
599.300
|
$800.000
|
$1,200.000
|
$800.000
|
$825.380
|
$1,000.000
|
$928.890
|
|
|
CL C CONC (COLUMN)
|
CY
|
641.300
|
$950.000
|
$1,100.000
|
$1,000.000
|
$1,083.010
|
$1,200.000
|
$1,031.160
|
|
|
CL C CONC (FOOTING)
|
CY
|
196.100
|
$900.000
|
$825.000
|
$500.000
|
$671.350
|
$700.000
|
$627.410
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
247.000
|
$450.000
|
$1,000.000
|
$350.000
|
$389.540
|
$350.000
|
$599.610
|
|
|
CL C CONC (SIGN COLUMN)
|
CY
|
392.700
|
$950.000
|
$875.000
|
$1,200.000
|
$1,385.280
|
$1,700.000
|
$1,234.530
|
|
|
REINF CONC SLAB
|
SF
|
135,799.000
|
$14.000
|
$16.000
|
$13.000
|
$16.300
|
$14.000
|
$13.050
|
|
|
BRIDGE SIDEWALK
|
SF
|
3,900.000
|
$10.250
|
$22.000
|
$10.000
|
$47.480
|
$11.000
|
$17.090
|
|
|
APPROACH SLAB
|
CY
|
1,093.000
|
$410.000
|
$500.000
|
$350.000
|
$433.420
|
$420.000
|
$433.590
|
|
|
RETAINING WALL (MSE)
|
SF
|
59,816.000
|
$50.000
|
$49.000
|
$50.000
|
$40.410
|
$68.000
|
$25.340
|
|
|
RETAINING WALL (TEMP WALL)
|
SF
|
8,822.960
|
$20.000
|
$15.000
|
$14.000
|
$15.740
|
$15.000
|
$9.440
|
|
|
RETAINING WALL (SOIL NAIL)(FACIA)
|
SF
|
16,248.000
|
$60.000
|
$72.000
|
$40.000
|
$49.950
|
$48.000
|
$41.260
|
|
|
PRESTR CONC GIRDER (TX54)
|
LF
|
16,526.060
|
$120.000
|
$120.000
|
$120.000
|
$130.500
|
$140.000
|
$132.060
|
|
|
PRESTR CONC GIRDER (TX62)
|
LF
|
5,182.570
|
$190.000
|
$135.000
|
$130.000
|
$128.900
|
$150.000
|
$135.360
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
2,602.000
|
$325.000
|
$300.000
|
$350.000
|
$306.440
|
$450.000
|
$311.280
|
|
|
RIPRAP (CONC) (CL A )
|
CY
|
16.000
|
$570.000
|
$350.000
|
$550.000
|
$350.000
|
$525.000
|
$661.100
|
|
|
RIPRAP (STONE PROTECTION)(12 IN)
|
CY
|
473.000
|
$120.000
|
$125.000
|
$100.000
|
$118.460
|
$100.000
|
$109.040
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
339.000
|
$375.000
|
$375.000
|
$320.000
|
$390.770
|
$450.000
|
$609.280
|
|
|
STR STEEL (MISC NON - BRIDGE)
|
LB
|
337.000
|
$10.000
|
$6.750
|
$12.000
|
$19.080
|
$10.500
|
$9.380
|
|
|
RAIL (TY SSTR)
|
LF
|
5,841.000
|
$35.000
|
$45.000
|
$200.000
|
$38.400
|
$48.000
|
$36.850
|
|
|
RAIL (TY T80SS)
|
LF
|
5,105.000
|
$42.000
|
$75.000
|
$66.760
|
$49.090
|
$68.000
|
$42.160
|
|
|
RAIL (TY SSTR) (W/DRAIN SLOTS)
|
LF
|
10,060.000
|
$40.000
|
$32.000
|
$40.510
|
$40.510
|
$50.000
|
$36.670
|
|
|
RAIL (TY SSTR)(MOD)
|
LF
|
4,394.600
|
$140.000
|
$86.000
|
$102.420
|
$119.870
|
$130.000
|
$54.340
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
|
LF
|
643.000
|
$75.000
|
$88.000
|
$100.000
|
$87.470
|
$70.000
|
$71.630
|
|
|
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
|
LF
|
237.000
|
$115.000
|
$112.000
|
$200.000
|
$95.490
|
$75.000
|
$73.000
|
|
|
GABION MATTRESSES (PVC)(12 IN)
|
SY
|
1,705.000
|
$40.000
|
$35.000
|
$50.000
|
$151.450
|
$57.640
|
$60.820
|
|
|
CONC BOX CULV (4 FT X 3 FT)
|
LF
|
187.000
|
$140.000
|
$250.000
|
$250.000
|
$164.150
|
$235.000
|
$138.180
|
|
|
CONC BOX CULV (4 FT X 4 FT)
|
LF
|
700.000
|
$150.000
|
$275.000
|
$400.000
|
$188.470
|
$340.000
|
$186.180
|
|
|
CONC BOX CULV (6 FT X 4 FT)
|
LF
|
1,367.000
|
$175.000
|
$285.000
|
$420.000
|
$247.240
|
$335.000
|
$264.350
|
|
|
CONC BOX CULV (6 FT X 5 FT)
|
LF
|
1,707.000
|
$400.000
|
$348.470
|
$450.000
|
$335.390
|
$445.000
|
$303.670
|
|
|
CONC BOX CULV (6 FT X 6 FT)
|
LF
|
306.000
|
$260.000
|
$372.640
|
$600.000
|
$289.800
|
$385.000
|
$312.080
|
|
|
CONC BOX CULV (7 FT X 7 FT)
|
LF
|
531.000
|
$715.000
|
$437.710
|
$600.000
|
$522.850
|
$485.000
|
$350.380
|
|
|
CONC BOX CULV (9 FT X 5 FT)
|
LF
|
1,448.000
|
$800.000
|
$460.500
|
$700.000
|
$589.730
|
$555.000
|
$422.440
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
223.000
|
$60.000
|
$50.720
|
$70.000
|
$77.010
|
$100.000
|
$15.880
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
10,304.000
|
$60.000
|
$75.000
|
$60.000
|
$78.020
|
$55.000
|
$78.470
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
3,445.000
|
$70.000
|
$90.000
|
$80.000
|
$90.180
|
$75.000
|
$80.880
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
3,295.000
|
$120.000
|
$108.000
|
$90.000
|
$104.370
|
$90.000
|
$90.650
|
|
|
RC PIPE (CL III)(42 IN)
|
LF
|
964.000
|
$120.000
|
$125.000
|
$100.000
|
$125.650
|
$110.000
|
$116.590
|
|
|
RC PIPE (CL V)(18 IN)
|
LF
|
37.000
|
$75.000
|
$72.000
|
$90.000
|
$89.170
|
$125.000
|
$21.170
|
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
455.000
|
$90.000
|
$435.000
|
$100.000
|
$98.290
|
$75.000
|
$110.010
|
|
|
RC PIPE (60 IN)(CL V)
|
LF
|
287.000
|
$600.000
|
$160.000
|
$250.000
|
$272.570
|
$365.000
|
$255.770
|
|
|
MANH (COMPL)(PRM)(48IN)
|
EA
|
7.000
|
$4,100.000
|
$5,300.000
|
$6,925.560
|
$3,210.050
|
$3,000.000
|
$3,432.820
|
|
|
MANH (COMPL)(PRM)(72IN)
|
EA
|
2.000
|
$5,125.000
|
$5,800.000
|
$10,000.000
|
$6,085.730
|
$8,600.000
|
$4,518.400
|
|
|
JCTBOX(COMPL)(PJB)(3FTX3FT)
|
EA
|
26.000
|
$3,500.000
|
$1,625.000
|
$3,000.000
|
$2,127.880
|
$2,000.000
|
$1,973.260
|
|
|
JCTBOX(COMPL)(PJB)(4FTX4FT)
|
EA
|
4.000
|
$4,100.000
|
$800.000
|
$3,500.000
|
$2,933.430
|
$2,300.000
|
$2,658.950
|
|
|
JCTBOX(COMPL)(PJB)(5FTX5FT)
|
EA
|
1.000
|
$4,500.000
|
$2,800.000
|
$4,200.000
|
$4,897.150
|
$3,400.000
|
$3,457.710
|
|
|
JCTBOX(COMPL)(PJB)(6FTX6FT)
|
EA
|
1.000
|
$5,200.000
|
$3,400.000
|
$5,000.000
|
$6,042.150
|
$4,700.000
|
$4,030.190
|
|
|
INLET (COMPL)(PCO)(3FT)(LEFT)
|
EA
|
2.000
|
$4,500.000
|
$2,800.000
|
$5,000.000
|
$4,602.290
|
$4,500.000
|
$3,448.030
|
|
|
INLET (COMPL)(PCO)(3FT)(RIGHT)
|
EA
|
2.000
|
$4,500.000
|
$2,800.000
|
$4,000.000
|
$4,602.290
|
$3,700.000
|
$4,436.380
|
|
|
INLET (COMPL)(PCO)(5FT)(NONE)
|
EA
|
2.000
|
$5,800.000
|
$3,300.000
|
$4,800.000
|
$3,761.280
|
$3,900.000
|
$3,848.700
|
|
|
INLET (COMPL)(PCO)(5FT)(LEFT)
|
EA
|
7.000
|
$5,500.000
|
$3,300.000
|
$4,500.000
|
$5,991.490
|
$3,300.000
|
$4,426.570
|
|
|
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
|
EA
|
1.000
|
$5,300.000
|
$2,800.000
|
$4,200.000
|
$4,738.070
|
$3,600.000
|
$5,549.960
|
|
|
INLET (COMPL)(TY AAD)
|
EA
|
13.000
|
$3,600.000
|
$3,000.000
|
$4,200.000
|
$5,246.610
|
$4,000.000
|
$3,825.650
|
|
|
INLET (COMPL)(TY AD)
|
EA
|
15.000
|
$3,000.000
|
$3,000.000
|
$4,200.000
|
$3,823.880
|
$3,200.000
|
$2,929.170
|
|
|
INLET (COMPL)(TY AZ)
|
EA
|
57.000
|
$3,700.000
|
$2,475.000
|
$4,200.000
|
$4,068.290
|
$3,700.000
|
$4,117.350
|
|
|
INLET (COMPL)(TY AZR)
|
EA
|
15.000
|
$4,200.000
|
$2,475.000
|
$4,200.000
|
$3,710.610
|
$5,700.000
|
$3,571.870
|
|
|
INLET (COMPL)(TY AZR2G)
|
EA
|
11.000
|
$5,300.000
|
$2,475.000
|
$5,600.000
|
$5,245.720
|
$6,000.000
|
$4,711.510
|
|
|
INLET (COMPL)(TY AZ2G)
|
EA
|
11.000
|
$7,200.000
|
$2,475.000
|
$6,600.000
|
$7,204.380
|
$5,700.000
|
$6,272.350
|
|
|
INLET (COMPL)(CURB)(TY 1)(10')
|
EA
|
1.000
|
$7,500.000
|
$5,200.000
|
$7,000.000
|
$7,761.680
|
$5,200.000
|
$3,727.750
|
|
|
INLET(COMPL)(WALL)(SPL)
|
EA
|
9.000
|
$4,300.000
|
$2,800.000
|
$4,200.000
|
$4,577.970
|
$5,700.000
|
$3,571.870
|
|
|
INLET (COMPL)(TY C)
|
EA
|
1.000
|
$2,500.000
|
$2,200.000
|
$6,200.000
|
$7,024.010
|
$4,200.000
|
$4,099.590
|
|
|
HEADWALL (CH - FW - 15) (DIA= 30 IN)
|
EA
|
2.000
|
$3,300.000
|
$4,500.000
|
$7,000.000
|
$3,164.460
|
$5,000.000
|
$2,386.840
|
|
|
HEADWALL (CH - FW - 15) (DIA= 36 IN)
|
EA
|
1.000
|
$4,500.000
|
$4,500.000
|
$7,500.000
|
$3,719.730
|
$15,000.000
|
$2,784.710
|
|
|
HEADWALL (CH - FW - 15) (DIA= 60 IN)
|
EA
|
1.000
|
$12,500.000
|
$15,000.000
|
$17,000.000
|
$5,573.010
|
$18,000.000
|
$7,957.330
|
|
|
HEADWALL (CH - FW - 30) (DIA= 42 IN)
|
EA
|
2.000
|
$7,200.000
|
$7,200.000
|
$12,000.000
|
$8,030.200
|
$9,100.000
|
$3,978.670
|
|
|
HEADWALL (CH - PW - S) (DIA= 30 IN)
|
EA
|
2.000
|
$8,500.000
|
$8,800.000
|
$17,000.000
|
$4,112.880
|
$5,500.000
|
$3,978.670
|
|
|
HEADWALL (CH - PW - S) (DIA= 36 IN)
|
EA
|
1.000
|
$8,000.000
|
$10,000.000
|
$9,000.000
|
$6,245.820
|
$7,500.000
|
$11,139.410
|
|
|
HEADWALL (CH - PW - S) (DIA= 60 IN)
|
EA
|
1.000
|
$13,500.000
|
$13,000.000
|
$19,000.000
|
$5,847.600
|
$7,000.000
|
$11,934.680
|
|
|
WINGWALL (FW - 0) (HW=8 FT)
|
EA
|
2.000
|
$30,000.000
|
$15,000.000
|
$22,000.000
|
$16,958.150
|
$19,000.000
|
$25,970.990
|
|
|
WINGWALL (FW - S) (HW=5 FT)
|
EA
|
3.000
|
$18,000.000
|
$10,000.000
|
$16,000.000
|
$11,270.650
|
$8,000.000
|
$16,593.000
|
|
|
WINGWALL (FW - S) (HW=8 FT)
|
EA
|
1.000
|
$20,000.000
|
$20,000.000
|
$30,000.000
|
$22,168.410
|
$18,000.000
|
$51,944.720
|
|
|
WINGWALL (PW - 1) (HW=10 FT)
|
EA
|
2.000
|
$30,000.000
|
$25,000.000
|
$36,000.000
|
$35,744.250
|
$32,000.000
|
$50,529.560
|
|
|
WINGWALL (PW - 1) (HW=12 FT)
|
EA
|
3.000
|
$50,000.000
|
$35,000.000
|
$52,000.000
|
$54,308.440
|
$48,000.000
|
$71,799.470
|
|
|
WINGWALL (PW - 1) (HW=5 FT)
|
EA
|
1.000
|
$18,000.000
|
$10,500.000
|
$18,000.000
|
$12,176.510
|
$10,000.000
|
$28,853.330
|
|
|
WINGWALL (PW - 1) (HW=6 FT)
|
EA
|
2.000
|
$35,500.000
|
$10,000.000
|
$20,000.000
|
$24,646.880
|
$14,000.000
|
$40,873.540
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
2.000
|
$22,000.000
|
$17,500.000
|
$24,000.000
|
$23,345.830
|
$17,000.000
|
$36,586.080
|
|
|
WINGWALL (PW - 1) (HW=8 FT)
|
EA
|
5.000
|
$39,000.000
|
$22,500.000
|
$32,000.000
|
$32,448.070
|
$27,000.000
|
$45,498.990
|
|
|
WINGWALL (PW - 1) (HW=9 FT)
|
EA
|
4.000
|
$54,000.000
|
$34,000.000
|
$42,000.000
|
$32,695.310
|
$26,000.000
|
$48,365.590
|
|
|
WINGWALL (SW - 0) (HW=5 FT)
|
EA
|
1.000
|
$15,000.000
|
$5,000.000
|
$11,000.000
|
$6,495.090
|
$12,000.000
|
$11,821.010
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
4.000
|
$1,000.000
|
$875.000
|
$3,000.000
|
$983.890
|
$1,200.000
|
$1,563.390
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (P)
|
EA
|
1.000
|
$1,100.000
|
$925.000
|
$3,000.000
|
$1,014.290
|
$1,200.000
|
$1,562.830
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
11.000
|
$1,000.000
|
$950.000
|
$3,000.000
|
$1,254.430
|
$1,400.000
|
$1,655.460
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
1.000
|
$1,200.000
|
$1,000.000
|
$3,000.000
|
$1,287.870
|
$1,400.000
|
$1,654.650
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,650.000
|
$1,100.000
|
$3,100.000
|
$1,209.850
|
$1,300.000
|
$1,654.650
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,400.000
|
$1,100.000
|
$3,100.000
|
$1,446.960
|
$1,500.000
|
$1,709.780
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (C)
|
EA
|
3.000
|
$2,700.000
|
$1,200.000
|
$3,100.000
|
$1,896.850
|
$1,700.000
|
$2,686.950
|
|
|
SET (TY II) (30 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$1,800.000
|
$1,300.000
|
$3,100.000
|
$1,902.930
|
$1,700.000
|
$2,687.320
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
3.000
|
$3,000.000
|
$1,950.000
|
$4,000.000
|
$3,693.380
|
$2,800.000
|
$3,482.240
|
|
|
SET (TY II) (42 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$4,000.000
|
$2,250.000
|
$5,000.000
|
$5,474.720
|
$3,500.000
|
$5,086.300
|
|
|
GRATE AND FRAME (BRIDGE DRAIN)
|
EA
|
6.000
|
$2,400.000
|
$3,200.000
|
$2,000.000
|
$1,604.520
|
$1,400.000
|
$1,518.900
|
|
|
CAST-IN-PLACE TRENCH DRAIN
|
LF
|
370.000
|
$315.000
|
$560.000
|
$150.000
|
$202.160
|
$150.000
|
$335.910
|
|
|
PRE-CAST TRENCH DRAIN (IN CONC PAVEMNT)
|
LF
|
81.000
|
$210.000
|
$255.000
|
$150.000
|
$104.200
|
$215.000
|
$107.180
|
|
|
PIPE (PVC) (SCH 40) (12 IN)
|
LF
|
204.000
|
$60.000
|
$53.000
|
$100.000
|
$55.870
|
$24.060
|
$40.630
|
|
|
REMOV STR (INLET)
|
EA
|
44.000
|
$600.000
|
$1,375.000
|
$300.000
|
$266.490
|
$800.000
|
$514.980
|
|
|
REMOV STR (HEADWALL)
|
EA
|
104.000
|
$1,200.000
|
$2,350.000
|
$500.000
|
$756.920
|
$900.000
|
$1,634.450
|
|
|
REMOV STR (PIPE)
|
LF
|
5,848.000
|
$21.500
|
$20.540
|
$10.000
|
$20.270
|
$20.000
|
$19.340
|
|
|
REMOV STR (BOX CULVERT)
|
LF
|
2,832.000
|
$52.000
|
$52.310
|
$80.000
|
$39.520
|
$45.000
|
$54.390
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
3.000
|
$90,000.000
|
$87,308.610
|
$100,000.000
|
$88,965.710
|
$50,000.000
|
$42,783.440
|
|
|
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
|
EA
|
1.000
|
$100,000.000
|
$87,837.330
|
$150,000.000
|
$86,251.250
|
$300,000.000
|
$167,000.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$7,100,000.000
|
$10,000,000.000
|
$12,000,000.000
|
$12,000,000.000
|
$12,300,000.000
|
$13,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
57.000
|
$12,000.000
|
$15,000.000
|
$35,000.000
|
$31,662.600
|
$24,000.000
|
$1,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
3,075.000
|
$30.000
|
$35.270
|
$35.270
|
$35.270
|
$45.000
|
$35.270
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 3)
|
LF
|
870.000
|
$85.000
|
$114.850
|
$114.850
|
$114.850
|
$80.000
|
$114.850
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
3,945.000
|
$9.000
|
$12.170
|
$12.170
|
$12.170
|
$10.000
|
$12.170
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
4,056.000
|
$35.000
|
$38.330
|
$38.330
|
$38.330
|
$28.000
|
$38.330
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
4,056.000
|
$8.000
|
$9.470
|
$9.470
|
$9.470
|
$5.000
|
$9.470
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
26,166.000
|
$2.500
|
$2.520
|
$2.520
|
$2.520
|
$2.920
|
$2.520
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
26,166.000
|
$0.450
|
$0.740
|
$0.740
|
$0.740
|
$0.500
|
$0.740
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
450.000
|
$4.800
|
$4.630
|
$4.630
|
$4.630
|
$3.250
|
$4.630
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (18")
|
LF
|
40.000
|
$6.000
|
$7.700
|
$7.700
|
$7.700
|
$8.380
|
$7.700
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
490.000
|
$1.000
|
$0.470
|
$0.470
|
$0.470
|
$1.000
|
$0.470
|
|
|
CONSTRUCTING DETOURS (TY 1)
|
SY
|
114,736.000
|
$70.000
|
$40.360
|
$67.710
|
$60.000
|
$66.080
|
$65.300
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
45.000
|
$5,000.000
|
$6,000.000
|
$2,500.000
|
$5,000.000
|
$5,617.250
|
$1,080.160
|
|
|
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
|
LF
|
67,770.000
|
$28.000
|
$65.150
|
$40.000
|
$10.640
|
$67.610
|
$35.280
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
4,920.000
|
$50.000
|
$66.420
|
$40.000
|
$4.920
|
$44.920
|
$37.860
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$65.000
|
$71.170
|
$60.000
|
$5.390
|
$45.580
|
$37.860
|
|
|
PORT CTB (MOVE)(SGL SLP)(TY 1)
|
LF
|
173,420.000
|
$2.150
|
$9.480
|
$2.000
|
$2.560
|
$2.390
|
$3.220
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
17,480.000
|
$4.000
|
$11.090
|
$2.000
|
$4.800
|
$7.070
|
$4.830
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
480.000
|
$7.500
|
$12.810
|
$7.000
|
$6.220
|
$7.110
|
$4.840
|
|
|
PORT CTB (REMOVE)(SGL SLP)(TY 1)
|
LF
|
67,770.000
|
$6.750
|
$8.780
|
$3.000
|
$8.530
|
$6.410
|
$6.120
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 1)
|
LF
|
4,920.000
|
$7.000
|
$8.700
|
$3.000
|
$6.910
|
$8.160
|
$5.340
|
|
|
PORT CTB (REMOVE)(LOW PROF)(TY 2)
|
LF
|
160.000
|
$10.000
|
$24.660
|
$8.000
|
$7.730
|
$8.290
|
$5.340
|
|
|
PERM CTB (SGL SLOPE) (TY 1) (42 )
|
LF
|
26,526.000
|
$52.000
|
$75.000
|
$50.000
|
$28.020
|
$69.100
|
$48.210
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (42 )
|
LF
|
228.000
|
$100.000
|
$130.000
|
$90.000
|
$81.840
|
$196.420
|
$122.390
|
|
|
PERM CTB (SGL SLOPE) (TY 3) (54 )
|
LF
|
149.000
|
$260.000
|
$275.000
|
$50.000
|
$141.690
|
$246.380
|
$139.240
|
|
|
PERM CONC TRF BARR (SGL SLP) (TY 1 SPL)
|
LF
|
200.000
|
$210.000
|
$150.000
|
$200.000
|
$60.530
|
$458.390
|
$130.350
|
|
|
PERM CONC TRF BARR (SGL SLP) (TY 3 SPL)
|
LF
|
120.000
|
$150.000
|
$150.000
|
$200.000
|
$61.140
|
$366.020
|
$155.620
|
|
|
LANDSCAPE PAVERS
|
SY
|
841.000
|
$65.000
|
$84.470
|
$58.500
|
$58.500
|
$125.000
|
$120.190
|
|
|
CONC CURB (TY I)
|
LF
|
4,326.000
|
$10.000
|
$22.750
|
$10.120
|
$5.000
|
$8.000
|
$3.060
|
|
|
CONC CURB (TY II)
|
LF
|
859.000
|
$39.610
|
$20.750
|
$31.850
|
$6.000
|
$8.000
|
$3.040
|
|
|
CONC CURB (SLOTTED)
|
LF
|
684.000
|
$22.000
|
$32.750
|
$35.960
|
$15.000
|
$12.000
|
$3.040
|
|
|
CONC CURB (TY C1)
|
LF
|
30.000
|
$60.000
|
$108.000
|
$50.340
|
$20.000
|
$95.000
|
$111.150
|
|
|
CONC CURB (TY C2)
|
LF
|
170.000
|
$90.000
|
$200.000
|
$39.550
|
$20.000
|
$125.000
|
$129.480
|
|
|
DRIVEWAYS (CONC)
|
SY
|
264.000
|
$80.000
|
$54.000
|
$65.790
|
$72.260
|
$85.000
|
$60.710
|
|
|
DRIVEWAYS (ACP)
|
SY
|
725.000
|
$28.000
|
$66.000
|
$28.090
|
$44.330
|
$55.000
|
$37.730
|
|
|
CURB RAMPS (TY 1)
|
EA
|
4.000
|
$1,650.000
|
$1,250.000
|
$1,732.450
|
$1,200.000
|
$2,100.000
|
$1,538.790
|
|
|
CURB RAMPS (TY 22)
|
EA
|
4.000
|
$3,000.000
|
$1,575.000
|
$1,732.450
|
$1,500.000
|
$2,600.000
|
$3,165.910
|
|
|
CONC SIDEWALKS (SPECIAL) (TYPE A)
|
SY
|
80.000
|
$125.000
|
$67.000
|
$68.900
|
$64.000
|
$140.000
|
$57.670
|
|
|
CONC MEDIAN
|
SY
|
5,900.000
|
$45.000
|
$51.500
|
$57.330
|
$46.810
|
$65.000
|
$62.500
|
|
|
CONC DIRECTIONAL ISLAND
|
SY
|
466.000
|
$65.000
|
$52.500
|
$60.570
|
$50.000
|
$75.000
|
$84.740
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,083.000
|
$21.000
|
$18.000
|
$19.500
|
$19.500
|
$18.850
|
$19.500
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
2.000
|
$1,200.000
|
$890.000
|
$1,170.000
|
$1,170.000
|
$932.170
|
$1,170.000
|
|
|
MTL BM GD FEN (LONG SPAN SYSTEM)
|
LF
|
270.000
|
$25.000
|
$19.500
|
$21.000
|
$21.000
|
$20.420
|
$21.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
11,984.000
|
$2.500
|
$1.500
|
$2.500
|
$2.500
|
$1.570
|
$2.500
|
|
|
REMOVE CABLE BARRIER
|
LF
|
31,095.000
|
$3.000
|
$7.100
|
$3.500
|
$3.000
|
$3.030
|
$2.000
|
|
|
REMOVE CABLE BARRIER TERMINAL SECTION
|
EA
|
7.000
|
$450.000
|
$1,315.080
|
$750.000
|
$200.000
|
$219.950
|
$500.000
|
|
|
INSTALL SALVAGE CABLE BARRIER
|
LF
|
200.000
|
$10.000
|
$54.870
|
$4.200
|
$7.000
|
$7.330
|
$20.000
|
|
|
INSTALL SALVAGE CABLE BAR TERM SECTION
|
EA
|
1.000
|
$2,500.000
|
$5,487.080
|
$1,000.000
|
$2,340.000
|
$2,573.390
|
$1,500.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
16.000
|
$2,300.000
|
$1,950.000
|
$2,179.000
|
$2,179.000
|
$2,042.380
|
$2,179.000
|
|
|
CRASH CUSH ATTEN (INSTL)
|
EA
|
10.000
|
$1,100.000
|
$10,000.000
|
$9,275.000
|
$8,225.000
|
$7,500.000
|
$8,225.000
|
|
|
CRASH CUSH ATTEN (MOVE & RESET)
|
EA
|
31.000
|
$1,800.000
|
$1,100.000
|
$2,300.000
|
$2,300.000
|
$1,800.000
|
$2,300.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
10.000
|
$1,000.000
|
$1,000.000
|
$500.000
|
$500.000
|
$500.000
|
$500.000
|
|
|
CRASH CUSH ATTEN (INSTL)(R)(N)(70)
|
EA
|
18.000
|
$16,000.000
|
$15,000.000
|
$16,500.000
|
$16,500.000
|
$17,843.700
|
$16,500.000
|
|
|
WIRE FENCE (TY C)
|
LF
|
986.000
|
$12.500
|
$10.000
|
$16.060
|
$7.000
|
$13.000
|
$11.200
|
|
|
MAILBOX INSTALL-S (RR-POST) TY 4
|
EA
|
2.000
|
$230.000
|
$235.000
|
$405.000
|
$405.000
|
$250.000
|
$405.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
17.000
|
$600.000
|
$300.000
|
$300.000
|
$425.580
|
$445.740
|
$300.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
41.000
|
$2,400.000
|
$2,475.000
|
$2,475.000
|
$2,859.880
|
$2,995.360
|
$2,475.000
|
|
|
HI MST IL POLE (150 FT)( 80 MPH)
|
EA
|
8.000
|
$25,000.000
|
$24,988.000
|
$24,988.000
|
$24,789.790
|
$25,964.160
|
$24,988.000
|
|
|
HI MST IL ASM (12-400W)(ASYM)(TY A)
|
EA
|
3.000
|
$27,000.000
|
$28,645.000
|
$28,645.000
|
$28,138.710
|
$29,471.730
|
$25,645.000
|
|
|
HI MST IL ASM (12-400W)(ASYM)(TY B)
|
EA
|
5.000
|
$27,500.000
|
$28,645.000
|
$28,645.000
|
$28,138.710
|
$29,471.730
|
$25,645.000
|
|
|
CONDT (PVC) (SCH 40) (1")
|
LF
|
495.000
|
$10.000
|
$10.000
|
$10.000
|
$4.270
|
$4.470
|
$10.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
19,303.000
|
$8.000
|
$6.450
|
$6.450
|
$4.930
|
$5.160
|
$6.450
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
1,894.000
|
$18.000
|
$11.000
|
$11.000
|
$11.310
|
$11.850
|
$11.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
18,339.000
|
$1.000
|
$0.950
|
$0.950
|
$1.130
|
$1.180
|
$0.950
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
36,678.000
|
$1.000
|
$1.050
|
$1.050
|
$1.250
|
$1.310
|
$1.050
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
2,561.000
|
$1.800
|
$1.480
|
$1.480
|
$1.510
|
$1.580
|
$1.480
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
5,122.000
|
$1.900
|
$1.550
|
$1.550
|
$1.570
|
$1.640
|
$1.550
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
43.000
|
$800.000
|
$695.000
|
$695.000
|
$829.520
|
$868.820
|
$695.000
|
|
|
ELC SRV TY A 240/480 060(NS)SS(T)SP(O)
|
EA
|
4.000
|
$5,000.000
|
$5,509.000
|
$5,509.000
|
$5,370.660
|
$5,625.090
|
$5,509.000
|
|
|
ELC SRV TY A 240/480 100(NS)SS(T)SP(O)
|
EA
|
3.000
|
$5,000.000
|
$5,814.000
|
$5,814.000
|
$5,696.610
|
$5,966.480
|
$5,814.000
|
|
|
ALUMINUM SIGNS (TY A)
|
SF
|
27.000
|
$30.000
|
$25.440
|
$25.440
|
$15.170
|
$15.890
|
$25.620
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
548.000
|
$22.000
|
$19.500
|
$19.500
|
$16.890
|
$17.690
|
$26.500
|
|
|
ALUMINUM SIGNS (TY O)
|
SF
|
3,477.000
|
$20.000
|
$17.500
|
$17.500
|
$15.900
|
$16.650
|
$17.500
|
|
|
REPLACE EXISTING ALUMINUM SIGNS(TY O)
|
SF
|
668.000
|
$25.000
|
$25.750
|
$25.750
|
$15.900
|
$16.650
|
$25.750
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
100.000
|
$325.000
|
$690.000
|
$311.000
|
$311.000
|
$325.730
|
$311.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
36.000
|
$450.000
|
$830.000
|
$405.000
|
$405.000
|
$424.190
|
$405.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
|
EA
|
2.000
|
$550.000
|
$1,100.000
|
$494.000
|
$494.000
|
$517.400
|
$494.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
12.000
|
$475.000
|
$870.000
|
$415.000
|
$415.000
|
$434.660
|
$415.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
|
EA
|
19.000
|
$350.000
|
$870.000
|
$299.000
|
$299.000
|
$313.160
|
$299.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
|
EA
|
5.000
|
$450.000
|
$860.000
|
$401.000
|
$401.000
|
$420.000
|
$401.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
|
EA
|
1.000
|
$850.000
|
$1,000.000
|
$500.000
|
$500.000
|
$523.680
|
$500.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
2.000
|
$500.000
|
$1,000.000
|
$499.000
|
$499.000
|
$522.640
|
$499.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
10.000
|
$575.000
|
$990.000
|
$532.000
|
$532.000
|
$557.200
|
$532.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
10.000
|
$575.000
|
$1,000.000
|
$574.000
|
$574.000
|
$601.190
|
$574.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
4.000
|
$675.000
|
$1,100.000
|
$647.000
|
$647.000
|
$677.650
|
$647.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
2.000
|
$1,000.000
|
$1,100.000
|
$686.000
|
$686.000
|
$718.500
|
$686.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
|
EA
|
3.000
|
$900.000
|
$1,000.000
|
$874.000
|
$874.000
|
$915.410
|
$874.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SB(T)
|
EA
|
2.000
|
$950.000
|
$1,100.000
|
$491.000
|
$491.000
|
$514.260
|
$491.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P)
|
EA
|
3.000
|
$1,350.000
|
$1,100.000
|
$1,286.000
|
$1,286.000
|
$1,346.920
|
$1,286.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
|
EA
|
3.000
|
$1,300.000
|
$1,200.000
|
$1,220.000
|
$1,220.000
|
$1,277.790
|
$1,220.000
|
|
|
IN SM RD SN SUP&AM TYS80(2)SB(P)
|
EA
|
1.000
|
$1,250.000
|
$1,300.000
|
$1,265.000
|
$1,265.000
|
$1,324.930
|
$1,265.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
1.000
|
$1,700.000
|
$3,878.680
|
$1,464.270
|
$3,000.000
|
$2,735.740
|
$1,568.280
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
|
EA
|
10.000
|
$2,200.000
|
$4,217.910
|
$3,075.000
|
$3,100.000
|
$2,392.200
|
$1,939.320
|
|
|
IN SM RD SN SUP&AM (RAIL MOUNT)
|
EA
|
5.000
|
$1,600.000
|
$2,100.000
|
$1,735.000
|
$4,000.000
|
$1,817.190
|
$1,735.000
|
|
|
RELOCATE SM RD SN SUP&AM(HIST MRKR)
|
EA
|
1.000
|
$800.000
|
$2,000.000
|
$1,500.000
|
$1,100.000
|
$1,571.060
|
$1,500.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
242.000
|
$100.000
|
$120.000
|
$100.000
|
$250.000
|
$104.740
|
$100.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
2,216.000
|
$5.000
|
$5.280
|
$5.280
|
$5.200
|
$5.450
|
$3.000
|
|
|
REMOVE LRSA
|
EA
|
23.000
|
$600.000
|
$200.000
|
$200.000
|
$680.930
|
$713.190
|
$1,100.000
|
|
|
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
|
EA
|
11.000
|
$15,000.000
|
$12,705.000
|
$12,705.000
|
$11,363.970
|
$11,902.320
|
$12,705.000
|
|
|
INS OH SN SUP(80 FT BRDG)(SPAN ONLY)
|
EA
|
1.000
|
$31,000.000
|
$32,351.000
|
$32,351.000
|
$26,202.690
|
$27,443.990
|
$32,351.000
|
|
|
INS OH SN SUP(110 FT BRDG)(SPAN ONLY)
|
EA
|
3.000
|
$53,500.000
|
$44,445.000
|
$44,445.000
|
$35,897.550
|
$37,598.130
|
$44,445.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
|
EA
|
77.000
|
$80.000
|
$50.000
|
$42.000
|
$43.000
|
$52.370
|
$43.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
|
EA
|
15.000
|
$70.000
|
$55.000
|
$42.000
|
$43.000
|
$57.610
|
$43.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
|
EA
|
41.000
|
$18.000
|
$18.000
|
$18.000
|
$18.000
|
$18.850
|
$18.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
24.000
|
$26.000
|
$20.000
|
$18.000
|
$18.000
|
$20.950
|
$18.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
|
EA
|
64.000
|
$25.000
|
$18.000
|
$20.000
|
$20.000
|
$18.850
|
$20.000
|
|
|
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
|
EA
|
10.000
|
$120.000
|
$50.000
|
$42.000
|
$43.000
|
$52.370
|
$43.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
|
EA
|
132.000
|
$25.000
|
$20.000
|
$18.000
|
$18.000
|
$20.950
|
$43.000
|
|
|
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
|
EA
|
50.000
|
$25.000
|
$18.000
|
$20.000
|
$20.000
|
$18.850
|
$18.000
|
|
|
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
|
EA
|
60.000
|
$90.000
|
$50.000
|
$42.000
|
$43.000
|
$52.370
|
$20.000
|
|
|
INSTL OM ASSM (OM-2Z)(FLX)GND
|
EA
|
164.000
|
$65.000
|
$55.000
|
$42.000
|
$43.000
|
$57.610
|
$165.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
|
LF
|
17,030.000
|
$0.200
|
$0.400
|
$0.180
|
$0.180
|
$0.190
|
$0.180
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
|
LF
|
1,032.000
|
$0.500
|
$1.000
|
$1.000
|
$1.000
|
$1.050
|
$1.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
77,529.000
|
$0.130
|
$0.400
|
$0.160
|
$0.160
|
$0.170
|
$0.160
|
|
|
WK ZN PAV MRK NON-REMOV (W)(ENTR GORE)
|
EA
|
9.000
|
$130.000
|
$740.000
|
$280.000
|
$280.000
|
$293.260
|
$280.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)(EXIT GORE)
|
EA
|
6.000
|
$150.000
|
$740.000
|
$280.000
|
$280.000
|
$293.260
|
$280.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
77,755.000
|
$0.130
|
$0.400
|
$0.160
|
$0.160
|
$0.170
|
$0.160
|
|
|
WK ZN PAV MRK REMOV (W)4"(DOT)
|
LF
|
393.000
|
$1.100
|
$1.800
|
$1.500
|
$1.500
|
$1.570
|
$1.500
|
|
|
WK ZN PAV MRK REMOV (W)4"(SLD)
|
LF
|
103,860.000
|
$0.500
|
$0.970
|
$0.640
|
$0.640
|
$0.670
|
$0.640
|
|
|
WK ZN PAV MRK REMOV (W)8"(SLD)
|
LF
|
26.000
|
$1.500
|
$2.100
|
$1.200
|
$1.200
|
$1.260
|
$1.200
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
48.000
|
$8.500
|
$8.600
|
$3.000
|
$3.000
|
$3.140
|
$3.000
|
|
|
WK ZN PAV MRK REMOV (W)4"(BKN W/MRKR)
|
LF
|
26,828.000
|
$0.600
|
$1.200
|
$0.700
|
$0.700
|
$0.730
|
$0.700
|
|
|
WK ZN PAV MRK REMOV (W)(ENTR GORE)
|
EA
|
4.000
|
$350.000
|
$1,600.000
|
$400.000
|
$400.000
|
$418.950
|
$400.000
|
|
|
WK ZN PAV MRK REMOV (W)(EXIT GORE)
|
EA
|
8.000
|
$360.000
|
$1,800.000
|
$400.000
|
$400.000
|
$418.950
|
$400.000
|
|
|
WK ZN PAV MRK REMOV (Y)4"(SLD)
|
LF
|
104,177.000
|
$0.500
|
$0.980
|
$0.640
|
$0.640
|
$0.670
|
$0.640
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
70.000
|
$0.750
|
$4.700
|
$1.600
|
$1.600
|
$1.680
|
$1.600
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
15,355.000
|
$0.800
|
$1.500
|
$0.900
|
$0.900
|
$0.940
|
$0.900
|
|
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
|
LF
|
1,046.000
|
$2.000
|
$4.900
|
$3.500
|
$3.500
|
$3.670
|
$3.500
|
|
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
|
LF
|
1,003.000
|
$3.000
|
$4.900
|
$3.000
|
$3.000
|
$3.140
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
238.000
|
$5.800
|
$9.800
|
$6.000
|
$6.000
|
$6.280
|
$6.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
9.000
|
$104.000
|
$140.000
|
$120.000
|
$120.000
|
$125.680
|
$120.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
13.000
|
$130.000
|
$140.000
|
$120.000
|
$120.000
|
$125.680
|
$120.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
90.000
|
$27.500
|
$57.000
|
$50.000
|
$50.000
|
$52.370
|
$50.000
|
|
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
|
LF
|
311.000
|
$5.800
|
$9.700
|
$6.000
|
$6.000
|
$6.280
|
$6.000
|
|
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
|
LF
|
33,844.000
|
$1.100
|
$0.770
|
$0.600
|
$0.600
|
$0.630
|
$0.600
|
|
|
PAVEMENT SEALER 4"
|
LF
|
301,584.000
|
$0.070
|
$0.090
|
$0.080
|
$0.080
|
$0.080
|
$0.080
|
|
|
PAVEMENT SEALER 8"
|
LF
|
15,355.000
|
$0.350
|
$0.210
|
$0.120
|
$0.120
|
$0.130
|
$0.120
|
|
|
PAVEMENT SEALER 12"
|
LF
|
2,049.000
|
$1.100
|
$0.570
|
$0.250
|
$0.250
|
$0.260
|
$0.250
|
|
|
PAVEMENT SEALER 24"
|
LF
|
356.000
|
$1.750
|
$0.900
|
$0.500
|
$0.500
|
$0.520
|
$0.500
|
|
|
PAVEMENT SEALER (ARROW)
|
EA
|
9.000
|
$34.000
|
$72.000
|
$10.000
|
$10.000
|
$10.470
|
$10.000
|
|
|
PAVEMENT SEALER (WORD)
|
EA
|
13.000
|
$45.000
|
$72.000
|
$10.000
|
$10.000
|
$10.470
|
$10.000
|
|
|
PAVEMENT SEALER (YLD TRI)
|
EA
|
90.000
|
$11.250
|
$72.000
|
$5.000
|
$5.000
|
$5.240
|
$5.000
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
33,844.000
|
$0.300
|
$0.600
|
$0.400
|
$0.400
|
$0.420
|
$0.400
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
166,796.000
|
$0.250
|
$0.600
|
$0.360
|
$0.360
|
$0.380
|
$0.360
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
1,686.000
|
$0.350
|
$0.750
|
$0.400
|
$0.400
|
$0.420
|
$0.400
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
163,124.000
|
$0.250
|
$0.600
|
$0.360
|
$0.360
|
$0.380
|
$0.360
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,087.000
|
$3.500
|
$5.800
|
$3.500
|
$3.500
|
$3.670
|
$3.500
|
|
REFL PAV MRKR TY II-C-R
|
EA
|
2,546.000
|
$3.000
|
$5.800
|
$3.500
|
$3.500
|
$3.670
|
$3.500
|
|
|
ELIM EXT PAV MRK & MRKS (4")
|
LF
|
96,200.000
|
$0.300
|
$0.730
|
$0.350
|
$0.350
|
$0.370
|
$0.350
|
|
|
ELIM EXT PAV MRK & MRKS (8")
|
LF
|
990.000
|
$1.000
|
$1.200
|
$0.700
|
$0.700
|
$0.730
|
$0.700
|
|
|
ELIM EXT PAV MRK & MRKS (ARROW)
|
EA
|
8.000
|
$45.000
|
$97.000
|
$60.000
|
$60.000
|
$62.840
|
$60.000
|
|
|
ELIM EXT PAV MRK & MRKS (WORD)
|
EA
|
8.000
|
$55.000
|
$97.000
|
$60.000
|
$60.000
|
$62.840
|
$0.600
|
|
|
PAV SURF PREP FOR MRK (4")
|
LF
|
301,584.000
|
$0.060
|
$0.020
|
$0.020
|
$0.020
|
$0.020
|
$0.020
|
|
|
PAV SURF PREP FOR MRK (8")
|
LF
|
15,355.000
|
$0.250
|
$0.070
|
$0.050
|
$0.050
|
$0.050
|
$0.050
|
|
|
PAV SURF PREP FOR MRK (12")
|
LF
|
2,049.000
|
$0.600
|
$0.090
|
$0.150
|
$0.150
|
$0.160
|
$0.150
|
|
|
PAV SURF PREP FOR MRK (24")
|
LF
|
356.000
|
$0.750
|
$0.190
|
$0.250
|
$0.250
|
$0.260
|
$0.250
|
|
|
PAV SURF PREP FOR MRK (ARROW)
|
EA
|
9.000
|
$17.000
|
$15.000
|
$15.000
|
$15.000
|
$15.710
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (WORD)
|
EA
|
13.000
|
$22.000
|
$15.000
|
$15.000
|
$15.000
|
$15.710
|
$15.000
|
|
|
PAV SURF PREP FOR MRK (36")(YLD TRI)
|
EA
|
90.000
|
$15.000
|
$15.000
|
$10.000
|
$10.000
|
$10.470
|
$10.000
|
|
|
NO. OF WORKING DAYS
|
$/D
|
6,270.000
|
$1,130.000
|
$825.000
|
$950.000
|
$1,130.000
|
$1,130.000
|
$1,130.000
|
|
|
LANDSCAPE AMENITY
|
EA
|
2.000
|
$206,500.000
|
$5,000.000
|
$10,000.000
|
$77,539.400
|
$5,498.710
|
$174,882.430
|
|
|
TREE PROTECTION
|
AC
|
11.830
|
$20,000.000
|
$23,684.470
|
$23,684.470
|
$23,684.470
|
$4,538.420
|
$5,424.410
|
|
|
LANDSCAPE SOIL AMENDMENT (TYPE I)
|
SY
|
50,578.000
|
$0.200
|
$0.960
|
$0.960
|
$0.960
|
$0.220
|
$0.960
|
|
|
TIP TESTING(DRILL SHAFT)
|
EA
|
13.000
|
$8,500.000
|
$16,550.000
|
$7,863.460
|
$5,750.000
|
$2,200.000
|
$5,891.180
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
8.000
|
$13,000.000
|
$14,120.590
|
$23,007.320
|
$37,938.000
|
$10,000.000
|
$16,202.440
|
|
|
AUTO PORT SMRT TRF MONITOR SYS
|
DAY
|
2,000.000
|
$242.000
|
$250.000
|
$350.000
|
$189.440
|
$674.600
|
$644.000
|
|
|
TMSP RADAR SPEED CONTROL MONITOR
|
EA
|
8.000
|
$7,385.000
|
$8,060.300
|
$10,000.000
|
$7,469.250
|
$6,598.450
|
$51,418.000
|
|
|
WATER FILLED BARRIER (350)(TL-3)
|
LF
|
1,250.000
|
$220.000
|
$243.560
|
$4.840
|
$201.750
|
$60.000
|
$57.790
|
|
Totals: |
$118,265,746.280
|
$122,051,472.890
|
$123,474,671.972
|
$126,615,459.204
|
$135,487,788.339
|
$135,872,446.228
|