Show Job Controls
Bid Cobra

WALKER IH 45 (0675-07-101)

Items: 337

County: WALKER
Length: N/A
Highway: IH 45
District: BRYAN
Control Number: 0675-07-101
DBE Goal: N/A
Project: NH 1702(696)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $118,265,746.28
Date: 08/09/2017 (8 years ago)
Contract Number: N/A
Type: WIDEN FREEWAY (SIX LANES)
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$118,265,746.28
Over/Under Est: 3.2% $3,785,726.61
$123,474,671.97
Over/Under Est: 4.4% $5,208,925.69
Amt Left: 1.17% $1,423,199.08
$126,615,459.18
Over/Under Est: 7.06% $8,349,712.90
Amt Left: 3.74% $4,563,986.29
Delta: -2.54% -$3,140,787.21
Over/Under Est: 14.56% $17,222,042.05
Amt Left: 11.01% $13,436,315.44
Delta: -7.01% -$8,872,329.15
Over/Under Est: 14.89% $17,606,699.91
Amt Left: 11.32% $13,820,973.30
Delta: -0.28% -$384,657.86

Bid Items & Bid Tabulations

337 Total 0 of 337
WALKER  |  IH 45  |  BRYAN  |  0675-07-101  |  08/09/2017  |  $118,265,746.28  |  NH 1702(696)  |  WIDEN FREEWAY (SIX LANES)  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
JOHNSON BROS. CORPORATION, A SOUTHLAND COMPANY
PULICE CONSTRUCTION, INC.
WEBBER, LLC
BALFOUR BEATTY INFRASTRUCTURE, INC.
JAMES CONSTRUCTION GROUP, L.L.C.
PREPARING ROW
STA 301.000 $3,000.000 $14,500.000 $11,890.000 $20,980.040 $8,000.000 $16,207.000
REMOVING CONC (PAV)
SY 164,668.000 $3.650 $9.750 $5.000 $4.060 $5.000 $3.450
REMOVING CONC (CTB)
LF 750.000 $5.250 $25.000 $6.000 $5.250 $8.000 $8.690
REMOVING CONC (APPR SLAB)
SY 621.000 $12.500 $100.000 $6.000 $12.500 $5.000 $15.440
REMOVING STAB BASE & ASPH PAV (4" - 6")
SY 3,509.000 $4.700 $2.500 $2.000 $2.700 $2.220 $7.460
EXCAVATION (ROADWAY)
CY 579,263.000 $7.200 $3.500 $5.000 $6.980 $7.000 $6.130
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 161,535.000 $11.500 $11.000 $8.000 $16.960 $15.000 $14.940
EMBANKMENT (FINAL) (DENS CONT) (TY C2)
CY 452,378.000 $4.500 $5.000 $3.000 $5.070 $7.000 $8.300
BACKFILL (TY B)
STA 630.000 $200.000 $240.000 $300.000 $530.120 $500.000 $297.690
BLADING
HR 120.000 $155.000 $300.000 $130.000 $300.000 $85.000 $90.280
GENERAL USE COMPOST
CY 2,810.000 $23.750 $25.000 $20.000 $23.490 $26.180 $23.490
COMPOST MANUF TOPSOIL (4")
SY 525,601.000 $1.000 $2.000 $0.740 $1.850 $0.730 $0.740
BLOCK SODDING
SY 6,500.000 $3.000 $3.150 $3.180 $3.180 $4.190 $3.180
BROADCAST SEED (TEMP) (WARM)
SY 131,400.000 $0.130 $0.080 $0.080 $0.080 $0.130 $0.080
BROADCAST SEED (TEMP) (COOL)
SY 131,400.000 $0.130 $0.080 $0.080 $0.080 $0.130 $0.080
CELL FBR MLCH SEED(TEMP)(WARM)
SY 131,400.000 $0.250 $0.290 $0.290 $0.290 $0.290 $0.290
CELL FBR MLCH SEED(TEMP)(COOL)
SY 131,400.000 $0.250 $0.290 $0.290 $0.290 $0.290 $0.290
DRILL SEEDING (PERM) (RURAL) (SANDY)
SY 123,951.000 $0.100 $0.120 $0.120 $0.120 $0.150 $0.120
DRILL SEEDING (PERM) (URBAN) (SANDY)
SY 401,650.000 $0.160 $0.100 $0.100 $0.100 $0.150 $0.100
VEGETATIVE WATERING
MG 8,830.000 $17.000 $27.000 $27.000 $28.000 $16.760 $27.000
SOIL RETENTION BLANKETS (CL 1) (TY D)
SY 3,472.000 $0.850 $1.020 $1.020 $1.020 $0.970 $1.020
SOIL RETENTION BLANKETS (CL 2) (TY E)
SY 17,868.000 $1.000 $1.190 $1.190 $1.190 $1.030 $1.190
SOIL RETENTION BLANKETS (CL 2) (TY F)
SY 465.000 $8.000 $10.300 $10.300 $10.300 $9.430 $10.300
WILDFLOWER SEEDING
AC 101.000 $850.000 $904.970 $904.970 $904.970 $2,670.800 $904.970
MULCH
CY 5,620.000 $22.500 $25.000 $25.290 $25.290 $25.140 $25.290
PLANT MATERIAL (15 GAL) (TREE)
EA 786.000 $170.000 $175.000 $177.740 $177.740 $94.260 $177.740
PLANT MATERIAL (3 GAL) (SHRUB)
EA 29.000 $30.000 $63.000 $63.130 $63.130 $12.570 $63.130
PLANT MATERIAL (5 GAL) (SHRUB)
EA 59.000 $50.000 $67.000 $67.120 $67.120 $23.040 $67.120
PLANT BED PREP (TYPE I)
SY 50,578.000 $1.750 $2.500 $2.860 $2.860 $1.930 $2.860
PLANT MATERIAL (7-GAL)
EA 349.000 $60.000 $140.000 $148.900 $148.900 $61.800 $148.900
FL BS (CMP IN PLC)(TY D GR 4) (6")
SY 3,544.000 $12.000 $25.000 $19.500 $14.780 $18.950 $14.460
FL BS(CMP IN PLC)(TY D GR 4)(15")
SY 2,120.000 $15.000 $47.000 $42.710 $39.780 $41.460 $32.200
CEMENT
TON 11,181.000 $115.000 $115.000 $150.000 $117.890 $125.000 $123.590
CEMENT TREAT (EXIST MATL)(12")
SY 483,442.000 $2.500 $3.260 $1.500 $3.170 $3.000 $1.980
CEMENT TREAT(EXIST MATL)(8")
SY 121,931.000 $2.500 $3.280 $2.500 $3.880 $2.500 $1.530
CEM TRT(PLNT MX) (CL N)(TY D)(GR 4)(6")
SY 605,375.000 $10.650 $9.000 $13.000 $10.620 $11.000 $14.730
CEM TRT(PLNT MX)(CL N)(TY D)(GR 4)(8")
SY 2,121.000 $16.000 $24.000 $20.000 $18.510 $16.000 $26.700
PRIME COAT (MULTI OPTION)
GAL 121,964.000 $3.850 $3.100 $3.500 $3.920 $3.670 $3.650
AGGR (TY-PB GR-4 OR TY-PL GR-4 SAC-A)
CY 877.000 $120.000 $128.000 $150.000 $137.410 $115.000 $152.210
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
GAL 41,658.000 $3.500 $3.000 $2.500 $3.210 $3.150 $2.450
SUPERPAVE MIXTURES SP-B PG64-22
TON 642.000 $81.000 $86.000 $105.000 $78.380 $75.000 $105.980
SUPERPAVE MIXTURES SP-C PG64-22
TON 293.000 $90.000 $110.000 $90.000 $101.790 $85.000 $126.560
SUPERPAVE MIXTURES SP-C SAC-A PG76-22
TON 476.000 $100.000 $100.000 $155.000 $101.790 $90.000 $116.270
SUPERPAVE MIXTURES SP-D PG64-22
TON 36,207.000 $86.000 $65.000 $94.000 $78.380 $80.000 $84.370
PLANE ASPH CONC PAV (6")
SY 116,534.000 $2.900 $2.500 $2.020 $2.430 $1.770 $4.870
PLANE ASPH CONC PAV (6"- 7.5")
SY 114,736.000 $3.200 $2.750 $2.330 $2.810 $3.480 $2.650
PLANE ASPH CONC PAV (5")
SY 164,668.000 $2.500 $3.750 $1.240 $2.030 $1.610 $1.990
PLANE ASPH CONC PAV (1" TO 4")
SY 84,336.000 $1.500 $1.750 $0.690 $1.000 $1.830 $1.410
CONC PVMT (CONT REINF - CRCP) (8")
SY 111,823.000 $36.000 $38.000 $44.000 $36.940 $40.000 $46.830
CONC PVMT (CONT REINF - CRCP) (15")
SY 466,012.000 $58.850 $57.750 $55.000 $60.830 $65.000 $70.530
CONC PVMT (CRCP)(JCT TERMINAL)(15")
SY 200.000 $70.000 $150.000 $90.000 $129.280 $125.000 $102.030
CONC PVMT (CRCP)(JCT TERMINAL)(8")
SY 758.000 $60.000 $47.000 $90.000 $86.980 $90.000 $67.810
STRUCT EXCAV
CY 4,900.000 $9.000 $20.000 $2.000 $17.220 $8.000 $6.610
STRUCT EXCAV (BRIDGE)
CY 419.000 $39.000 $35.000 $6.000 $23.970 $15.000 $19.790
CEM STABIL BKFL
CY 14,585.000 $47.000 $68.000 $50.000 $51.520 $45.000 $58.930
TRENCH EXCAVATION PROTECTION
LF 6,803.000 $125.000 $3.000 $5.000 $2.030 $3.000 $1.590
TEMPORARY SPL SHORING
SF 100,153.000 $18.500 $13.000 $8.000 $1.000 $25.000 $25.270
FOUNDATON LOADTEST(D4945)(DRILLD SHAFT)
EA 13.000 $25,000.000 $9,800.000 $40,000.000 $26,699.340 $10,000.000 $24,077.010
SOIL NAIL ANCHORS
LF 21,210.000 $20.000 $14.000 $17.000 $12.220 $14.000 $14.200
DRILL SHAFT (18 IN)
LF 1,220.000 $50.000 $57.500 $52.380 $49.610 $50.000 $44.780
DRILL SHAFT (24 IN)
LF 170.000 $125.000 $107.500 $90.650 $79.660 $85.000 $75.050
DRILL SHAFT (36 IN)
LF 7,002.000 $130.000 $150.000 $190.000 $145.170 $160.000 $145.450
DRILL SHAFT (42 IN)
LF 5,119.000 $205.000 $200.000 $250.000 $202.520 $215.000 $203.220
DRILL SHAFT (54 IN)
LF 530.000 $375.000 $675.000 $555.000 $500.000 $395.000 $346.790
DRILL SHAFT (78 IN)
LF 100.000 $670.000 $1,400.000 $1,283.000 $1,300.000 $800.000 $754.050
DRILL SHAFT (SIGN MTS) (24 IN)
LF 66.000 $140.000 $133.000 $133.000 $76.630 $80.260 $110.000
DRILL SHAFT (HIGH MAST POLE) (60 IN)
LF 264.000 $550.000 $18.000 $518.000 $750.660 $786.220 $518.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 410.000 $180.000 $144.000 $144.000 $183.540 $192.230 $144.000
CL B CONC (FLUME)
CY 48.000 $450.000 $650.000 $500.000 $450.000 $450.000 $394.730
CL C CONC (ABUT)
CY 503.800 $930.000 $1,100.000 $750.000 $1,074.400 $800.000 $788.470
CL C CONC (CAP)
CY 599.300 $800.000 $1,200.000 $800.000 $825.380 $1,000.000 $928.890
CL C CONC (COLUMN)
CY 641.300 $950.000 $1,100.000 $1,000.000 $1,083.010 $1,200.000 $1,031.160
CL C CONC (FOOTING)
CY 196.100 $900.000 $825.000 $500.000 $671.350 $700.000 $627.410
CL C CONC (RAIL FOUNDATION)
CY 247.000 $450.000 $1,000.000 $350.000 $389.540 $350.000 $599.610
CL C CONC (SIGN COLUMN)
CY 392.700 $950.000 $875.000 $1,200.000 $1,385.280 $1,700.000 $1,234.530
REINF CONC SLAB
SF 135,799.000 $14.000 $16.000 $13.000 $16.300 $14.000 $13.050
BRIDGE SIDEWALK
SF 3,900.000 $10.250 $22.000 $10.000 $47.480 $11.000 $17.090
APPROACH SLAB
CY 1,093.000 $410.000 $500.000 $350.000 $433.420 $420.000 $433.590
RETAINING WALL (MSE)
SF 59,816.000 $50.000 $49.000 $50.000 $40.410 $68.000 $25.340
RETAINING WALL (TEMP WALL)
SF 8,822.960 $20.000 $15.000 $14.000 $15.740 $15.000 $9.440
RETAINING WALL (SOIL NAIL)(FACIA)
SF 16,248.000 $60.000 $72.000 $40.000 $49.950 $48.000 $41.260
PRESTR CONC GIRDER (TX54)
LF 16,526.060 $120.000 $120.000 $120.000 $130.500 $140.000 $132.060
PRESTR CONC GIRDER (TX62)
LF 5,182.570 $190.000 $135.000 $130.000 $128.900 $150.000 $135.360
RIPRAP (CONC)(4 IN)
CY 2,602.000 $325.000 $300.000 $350.000 $306.440 $450.000 $311.280
RIPRAP (CONC) (CL A )
CY 16.000 $570.000 $350.000 $550.000 $350.000 $525.000 $661.100
RIPRAP (STONE PROTECTION)(12 IN)
CY 473.000 $120.000 $125.000 $100.000 $118.460 $100.000 $109.040
RIPRAP (MOW STRIP)(4 IN)
CY 339.000 $375.000 $375.000 $320.000 $390.770 $450.000 $609.280
STR STEEL (MISC NON - BRIDGE)
LB 337.000 $10.000 $6.750 $12.000 $19.080 $10.500 $9.380
RAIL (TY SSTR)
LF 5,841.000 $35.000 $45.000 $200.000 $38.400 $48.000 $36.850
RAIL (TY T80SS)
LF 5,105.000 $42.000 $75.000 $66.760 $49.090 $68.000 $42.160
RAIL (TY SSTR) (W/DRAIN SLOTS)
LF 10,060.000 $40.000 $32.000 $40.510 $40.510 $50.000 $36.670
RAIL (TY SSTR)(MOD)
LF 4,394.600 $140.000 $86.000 $102.420 $119.870 $130.000 $54.340
SEALED EXPANSION JOINT (4 IN) (SEJ - A)
LF 643.000 $75.000 $88.000 $100.000 $87.470 $70.000 $71.630
SEALED EXPANSION JOINT (5 IN) (SEJ - A)
LF 237.000 $115.000 $112.000 $200.000 $95.490 $75.000 $73.000
GABION MATTRESSES (PVC)(12 IN)
SY 1,705.000 $40.000 $35.000 $50.000 $151.450 $57.640 $60.820
CONC BOX CULV (4 FT X 3 FT)
LF 187.000 $140.000 $250.000 $250.000 $164.150 $235.000 $138.180
CONC BOX CULV (4 FT X 4 FT)
LF 700.000 $150.000 $275.000 $400.000 $188.470 $340.000 $186.180
CONC BOX CULV (6 FT X 4 FT)
LF 1,367.000 $175.000 $285.000 $420.000 $247.240 $335.000 $264.350
CONC BOX CULV (6 FT X 5 FT)
LF 1,707.000 $400.000 $348.470 $450.000 $335.390 $445.000 $303.670
CONC BOX CULV (6 FT X 6 FT)
LF 306.000 $260.000 $372.640 $600.000 $289.800 $385.000 $312.080
CONC BOX CULV (7 FT X 7 FT)
LF 531.000 $715.000 $437.710 $600.000 $522.850 $485.000 $350.380
CONC BOX CULV (9 FT X 5 FT)
LF 1,448.000 $800.000 $460.500 $700.000 $589.730 $555.000 $422.440
RC PIPE (CL III)(18 IN)
LF 223.000 $60.000 $50.720 $70.000 $77.010 $100.000 $15.880
RC PIPE (CL III)(24 IN)
LF 10,304.000 $60.000 $75.000 $60.000 $78.020 $55.000 $78.470
RC PIPE (CL III)(30 IN)
LF 3,445.000 $70.000 $90.000 $80.000 $90.180 $75.000 $80.880
RC PIPE (CL III)(36 IN)
LF 3,295.000 $120.000 $108.000 $90.000 $104.370 $90.000 $90.650
RC PIPE (CL III)(42 IN)
LF 964.000 $120.000 $125.000 $100.000 $125.650 $110.000 $116.590
RC PIPE (CL V)(18 IN)
LF 37.000 $75.000 $72.000 $90.000 $89.170 $125.000 $21.170
RC PIPE (CL V)(24 IN)
LF 455.000 $90.000 $435.000 $100.000 $98.290 $75.000 $110.010
RC PIPE (60 IN)(CL V)
LF 287.000 $600.000 $160.000 $250.000 $272.570 $365.000 $255.770
MANH (COMPL)(PRM)(48IN)
EA 7.000 $4,100.000 $5,300.000 $6,925.560 $3,210.050 $3,000.000 $3,432.820
MANH (COMPL)(PRM)(72IN)
EA 2.000 $5,125.000 $5,800.000 $10,000.000 $6,085.730 $8,600.000 $4,518.400
JCTBOX(COMPL)(PJB)(3FTX3FT)
EA 26.000 $3,500.000 $1,625.000 $3,000.000 $2,127.880 $2,000.000 $1,973.260
JCTBOX(COMPL)(PJB)(4FTX4FT)
EA 4.000 $4,100.000 $800.000 $3,500.000 $2,933.430 $2,300.000 $2,658.950
JCTBOX(COMPL)(PJB)(5FTX5FT)
EA 1.000 $4,500.000 $2,800.000 $4,200.000 $4,897.150 $3,400.000 $3,457.710
JCTBOX(COMPL)(PJB)(6FTX6FT)
EA 1.000 $5,200.000 $3,400.000 $5,000.000 $6,042.150 $4,700.000 $4,030.190
INLET (COMPL)(PCO)(3FT)(LEFT)
EA 2.000 $4,500.000 $2,800.000 $5,000.000 $4,602.290 $4,500.000 $3,448.030
INLET (COMPL)(PCO)(3FT)(RIGHT)
EA 2.000 $4,500.000 $2,800.000 $4,000.000 $4,602.290 $3,700.000 $4,436.380
INLET (COMPL)(PCO)(5FT)(NONE)
EA 2.000 $5,800.000 $3,300.000 $4,800.000 $3,761.280 $3,900.000 $3,848.700
INLET (COMPL)(PCO)(5FT)(LEFT)
EA 7.000 $5,500.000 $3,300.000 $4,500.000 $5,991.490 $3,300.000 $4,426.570
INLET (COMPL)(PSL)(FG)(5FTX5FT-4FTX4FT)
EA 1.000 $5,300.000 $2,800.000 $4,200.000 $4,738.070 $3,600.000 $5,549.960
INLET (COMPL)(TY AAD)
EA 13.000 $3,600.000 $3,000.000 $4,200.000 $5,246.610 $4,000.000 $3,825.650
INLET (COMPL)(TY AD)
EA 15.000 $3,000.000 $3,000.000 $4,200.000 $3,823.880 $3,200.000 $2,929.170
INLET (COMPL)(TY AZ)
EA 57.000 $3,700.000 $2,475.000 $4,200.000 $4,068.290 $3,700.000 $4,117.350
INLET (COMPL)(TY AZR)
EA 15.000 $4,200.000 $2,475.000 $4,200.000 $3,710.610 $5,700.000 $3,571.870
INLET (COMPL)(TY AZR2G)
EA 11.000 $5,300.000 $2,475.000 $5,600.000 $5,245.720 $6,000.000 $4,711.510
INLET (COMPL)(TY AZ2G)
EA 11.000 $7,200.000 $2,475.000 $6,600.000 $7,204.380 $5,700.000 $6,272.350
INLET (COMPL)(CURB)(TY 1)(10')
EA 1.000 $7,500.000 $5,200.000 $7,000.000 $7,761.680 $5,200.000 $3,727.750
INLET(COMPL)(WALL)(SPL)
EA 9.000 $4,300.000 $2,800.000 $4,200.000 $4,577.970 $5,700.000 $3,571.870
INLET (COMPL)(TY C)
EA 1.000 $2,500.000 $2,200.000 $6,200.000 $7,024.010 $4,200.000 $4,099.590
HEADWALL (CH - FW - 15) (DIA= 30 IN)
EA 2.000 $3,300.000 $4,500.000 $7,000.000 $3,164.460 $5,000.000 $2,386.840
HEADWALL (CH - FW - 15) (DIA= 36 IN)
EA 1.000 $4,500.000 $4,500.000 $7,500.000 $3,719.730 $15,000.000 $2,784.710
HEADWALL (CH - FW - 15) (DIA= 60 IN)
EA 1.000 $12,500.000 $15,000.000 $17,000.000 $5,573.010 $18,000.000 $7,957.330
HEADWALL (CH - FW - 30) (DIA= 42 IN)
EA 2.000 $7,200.000 $7,200.000 $12,000.000 $8,030.200 $9,100.000 $3,978.670
HEADWALL (CH - PW - S) (DIA= 30 IN)
EA 2.000 $8,500.000 $8,800.000 $17,000.000 $4,112.880 $5,500.000 $3,978.670
HEADWALL (CH - PW - S) (DIA= 36 IN)
EA 1.000 $8,000.000 $10,000.000 $9,000.000 $6,245.820 $7,500.000 $11,139.410
HEADWALL (CH - PW - S) (DIA= 60 IN)
EA 1.000 $13,500.000 $13,000.000 $19,000.000 $5,847.600 $7,000.000 $11,934.680
WINGWALL (FW - 0) (HW=8 FT)
EA 2.000 $30,000.000 $15,000.000 $22,000.000 $16,958.150 $19,000.000 $25,970.990
WINGWALL (FW - S) (HW=5 FT)
EA 3.000 $18,000.000 $10,000.000 $16,000.000 $11,270.650 $8,000.000 $16,593.000
WINGWALL (FW - S) (HW=8 FT)
EA 1.000 $20,000.000 $20,000.000 $30,000.000 $22,168.410 $18,000.000 $51,944.720
WINGWALL (PW - 1) (HW=10 FT)
EA 2.000 $30,000.000 $25,000.000 $36,000.000 $35,744.250 $32,000.000 $50,529.560
WINGWALL (PW - 1) (HW=12 FT)
EA 3.000 $50,000.000 $35,000.000 $52,000.000 $54,308.440 $48,000.000 $71,799.470
WINGWALL (PW - 1) (HW=5 FT)
EA 1.000 $18,000.000 $10,500.000 $18,000.000 $12,176.510 $10,000.000 $28,853.330
WINGWALL (PW - 1) (HW=6 FT)
EA 2.000 $35,500.000 $10,000.000 $20,000.000 $24,646.880 $14,000.000 $40,873.540
WINGWALL (PW - 1) (HW=7 FT)
EA 2.000 $22,000.000 $17,500.000 $24,000.000 $23,345.830 $17,000.000 $36,586.080
WINGWALL (PW - 1) (HW=8 FT)
EA 5.000 $39,000.000 $22,500.000 $32,000.000 $32,448.070 $27,000.000 $45,498.990
WINGWALL (PW - 1) (HW=9 FT)
EA 4.000 $54,000.000 $34,000.000 $42,000.000 $32,695.310 $26,000.000 $48,365.590
WINGWALL (SW - 0) (HW=5 FT)
EA 1.000 $15,000.000 $5,000.000 $11,000.000 $6,495.090 $12,000.000 $11,821.010
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 4.000 $1,000.000 $875.000 $3,000.000 $983.890 $1,200.000 $1,563.390
SET (TY II) (24 IN) (RCP) (4: 1) (P)
EA 1.000 $1,100.000 $925.000 $3,000.000 $1,014.290 $1,200.000 $1,562.830
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 11.000 $1,000.000 $950.000 $3,000.000 $1,254.430 $1,400.000 $1,655.460
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 1.000 $1,200.000 $1,000.000 $3,000.000 $1,287.870 $1,400.000 $1,654.650
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 1.000 $1,650.000 $1,100.000 $3,100.000 $1,209.850 $1,300.000 $1,654.650
SET (TY II) (30 IN) (RCP) (4: 1) (C)
EA 2.000 $1,400.000 $1,100.000 $3,100.000 $1,446.960 $1,500.000 $1,709.780
SET (TY II) (30 IN) (RCP) (6: 1) (C)
EA 3.000 $2,700.000 $1,200.000 $3,100.000 $1,896.850 $1,700.000 $2,686.950
SET (TY II) (30 IN) (RCP) (6: 1) (P)
EA 2.000 $1,800.000 $1,300.000 $3,100.000 $1,902.930 $1,700.000 $2,687.320
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 3.000 $3,000.000 $1,950.000 $4,000.000 $3,693.380 $2,800.000 $3,482.240
SET (TY II) (42 IN) (RCP) (4: 1) (C)
EA 1.000 $4,000.000 $2,250.000 $5,000.000 $5,474.720 $3,500.000 $5,086.300
GRATE AND FRAME (BRIDGE DRAIN)
EA 6.000 $2,400.000 $3,200.000 $2,000.000 $1,604.520 $1,400.000 $1,518.900
CAST-IN-PLACE TRENCH DRAIN
LF 370.000 $315.000 $560.000 $150.000 $202.160 $150.000 $335.910
PRE-CAST TRENCH DRAIN (IN CONC PAVEMNT)
LF 81.000 $210.000 $255.000 $150.000 $104.200 $215.000 $107.180
PIPE (PVC) (SCH 40) (12 IN)
LF 204.000 $60.000 $53.000 $100.000 $55.870 $24.060 $40.630
REMOV STR (INLET)
EA 44.000 $600.000 $1,375.000 $300.000 $266.490 $800.000 $514.980
REMOV STR (HEADWALL)
EA 104.000 $1,200.000 $2,350.000 $500.000 $756.920 $900.000 $1,634.450
REMOV STR (PIPE)
LF 5,848.000 $21.500 $20.540 $10.000 $20.270 $20.000 $19.340
REMOV STR (BOX CULVERT)
LF 2,832.000 $52.000 $52.310 $80.000 $39.520 $45.000 $54.390
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 3.000 $90,000.000 $87,308.610 $100,000.000 $88,965.710 $50,000.000 $42,783.440
REMOV STR (BRIDGE 500 - 999 FT LENGTH)
EA 1.000 $100,000.000 $87,837.330 $150,000.000 $86,251.250 $300,000.000 $167,000.000
MOBILIZATION
LS 1.000 $7,100,000.000 $10,000,000.000 $12,000,000.000 $12,000,000.000 $12,300,000.000 $13,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 57.000 $12,000.000 $15,000.000 $35,000.000 $31,662.600 $24,000.000 $1,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 3,075.000 $30.000 $35.270 $35.270 $35.270 $45.000 $35.270
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 870.000 $85.000 $114.850 $114.850 $114.850 $80.000 $114.850
ROCK FILTER DAMS (REMOVE)
LF 3,945.000 $9.000 $12.170 $12.170 $12.170 $10.000 $12.170
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 4,056.000 $35.000 $38.330 $38.330 $38.330 $28.000 $38.330
CONSTRUCTION EXITS (REMOVE)
SY 4,056.000 $8.000 $9.470 $9.470 $9.470 $5.000 $9.470
TEMP SEDMT CONT FENCE (INSTALL)
LF 26,166.000 $2.500 $2.520 $2.520 $2.520 $2.920 $2.520
TEMP SEDMT CONT FENCE (REMOVE)
LF 26,166.000 $0.450 $0.740 $0.740 $0.740 $0.500 $0.740
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 450.000 $4.800 $4.630 $4.630 $4.630 $3.250 $4.630
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 40.000 $6.000 $7.700 $7.700 $7.700 $8.380 $7.700
BIODEG EROSN CONT LOGS (REMOVE)
LF 490.000 $1.000 $0.470 $0.470 $0.470 $1.000 $0.470
CONSTRUCTING DETOURS (TY 1)
SY 114,736.000 $70.000 $40.360 $67.710 $60.000 $66.080 $65.300
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 45.000 $5,000.000 $6,000.000 $2,500.000 $5,000.000 $5,617.250 $1,080.160
PORT CTB (FUR & INST)(SGL SLOPE)(TY 1)
LF 67,770.000 $28.000 $65.150 $40.000 $10.640 $67.610 $35.280
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 4,920.000 $50.000 $66.420 $40.000 $4.920 $44.920 $37.860
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 160.000 $65.000 $71.170 $60.000 $5.390 $45.580 $37.860
PORT CTB (MOVE)(SGL SLP)(TY 1)
LF 173,420.000 $2.150 $9.480 $2.000 $2.560 $2.390 $3.220
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 17,480.000 $4.000 $11.090 $2.000 $4.800 $7.070 $4.830
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 480.000 $7.500 $12.810 $7.000 $6.220 $7.110 $4.840
PORT CTB (REMOVE)(SGL SLP)(TY 1)
LF 67,770.000 $6.750 $8.780 $3.000 $8.530 $6.410 $6.120
PORT CTB (REMOVE)(LOW PROF)(TY 1)
LF 4,920.000 $7.000 $8.700 $3.000 $6.910 $8.160 $5.340
PORT CTB (REMOVE)(LOW PROF)(TY 2)
LF 160.000 $10.000 $24.660 $8.000 $7.730 $8.290 $5.340
PERM CTB (SGL SLOPE) (TY 1) (42 )
LF 26,526.000 $52.000 $75.000 $50.000 $28.020 $69.100 $48.210
PERM CTB (SGL SLOPE) (TY 3) (42 )
LF 228.000 $100.000 $130.000 $90.000 $81.840 $196.420 $122.390
PERM CTB (SGL SLOPE) (TY 3) (54 )
LF 149.000 $260.000 $275.000 $50.000 $141.690 $246.380 $139.240
PERM CONC TRF BARR (SGL SLP) (TY 1 SPL)
LF 200.000 $210.000 $150.000 $200.000 $60.530 $458.390 $130.350
PERM CONC TRF BARR (SGL SLP) (TY 3 SPL)
LF 120.000 $150.000 $150.000 $200.000 $61.140 $366.020 $155.620
LANDSCAPE PAVERS
SY 841.000 $65.000 $84.470 $58.500 $58.500 $125.000 $120.190
CONC CURB (TY I)
LF 4,326.000 $10.000 $22.750 $10.120 $5.000 $8.000 $3.060
CONC CURB (TY II)
LF 859.000 $39.610 $20.750 $31.850 $6.000 $8.000 $3.040
CONC CURB (SLOTTED)
LF 684.000 $22.000 $32.750 $35.960 $15.000 $12.000 $3.040
CONC CURB (TY C1)
LF 30.000 $60.000 $108.000 $50.340 $20.000 $95.000 $111.150
CONC CURB (TY C2)
LF 170.000 $90.000 $200.000 $39.550 $20.000 $125.000 $129.480
DRIVEWAYS (CONC)
SY 264.000 $80.000 $54.000 $65.790 $72.260 $85.000 $60.710
DRIVEWAYS (ACP)
SY 725.000 $28.000 $66.000 $28.090 $44.330 $55.000 $37.730
CURB RAMPS (TY 1)
EA 4.000 $1,650.000 $1,250.000 $1,732.450 $1,200.000 $2,100.000 $1,538.790
CURB RAMPS (TY 22)
EA 4.000 $3,000.000 $1,575.000 $1,732.450 $1,500.000 $2,600.000 $3,165.910
CONC SIDEWALKS (SPECIAL) (TYPE A)
SY 80.000 $125.000 $67.000 $68.900 $64.000 $140.000 $57.670
CONC MEDIAN
SY 5,900.000 $45.000 $51.500 $57.330 $46.810 $65.000 $62.500
CONC DIRECTIONAL ISLAND
SY 466.000 $65.000 $52.500 $60.570 $50.000 $75.000 $84.740
MTL W-BEAM GD FEN (TIM POST)
LF 1,083.000 $21.000 $18.000 $19.500 $19.500 $18.850 $19.500
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,200.000 $890.000 $1,170.000 $1,170.000 $932.170 $1,170.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 270.000 $25.000 $19.500 $21.000 $21.000 $20.420 $21.000
REMOVE METAL BEAM GUARD FENCE
LF 11,984.000 $2.500 $1.500 $2.500 $2.500 $1.570 $2.500
REMOVE CABLE BARRIER
LF 31,095.000 $3.000 $7.100 $3.500 $3.000 $3.030 $2.000
REMOVE CABLE BARRIER TERMINAL SECTION
EA 7.000 $450.000 $1,315.080 $750.000 $200.000 $219.950 $500.000
INSTALL SALVAGE CABLE BARRIER
LF 200.000 $10.000 $54.870 $4.200 $7.000 $7.330 $20.000
INSTALL SALVAGE CABLE BAR TERM SECTION
EA 1.000 $2,500.000 $5,487.080 $1,000.000 $2,340.000 $2,573.390 $1,500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 16.000 $2,300.000 $1,950.000 $2,179.000 $2,179.000 $2,042.380 $2,179.000
CRASH CUSH ATTEN (INSTL)
EA 10.000 $1,100.000 $10,000.000 $9,275.000 $8,225.000 $7,500.000 $8,225.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 31.000 $1,800.000 $1,100.000 $2,300.000 $2,300.000 $1,800.000 $2,300.000
CRASH CUSH ATTEN (REMOVE)
EA 10.000 $1,000.000 $1,000.000 $500.000 $500.000 $500.000 $500.000
CRASH CUSH ATTEN (INSTL)(R)(N)(70)
EA 18.000 $16,000.000 $15,000.000 $16,500.000 $16,500.000 $17,843.700 $16,500.000
WIRE FENCE (TY C)
LF 986.000 $12.500 $10.000 $16.060 $7.000 $13.000 $11.200
MAILBOX INSTALL-S (RR-POST) TY 4
EA 2.000 $230.000 $235.000 $405.000 $405.000 $250.000 $405.000
REMOVE RD IL ASM (TRANS-BASE)
EA 17.000 $600.000 $300.000 $300.000 $425.580 $445.740 $300.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 41.000 $2,400.000 $2,475.000 $2,475.000 $2,859.880 $2,995.360 $2,475.000
HI MST IL POLE (150 FT)( 80 MPH)
EA 8.000 $25,000.000 $24,988.000 $24,988.000 $24,789.790 $25,964.160 $24,988.000
HI MST IL ASM (12-400W)(ASYM)(TY A)
EA 3.000 $27,000.000 $28,645.000 $28,645.000 $28,138.710 $29,471.730 $25,645.000
HI MST IL ASM (12-400W)(ASYM)(TY B)
EA 5.000 $27,500.000 $28,645.000 $28,645.000 $28,138.710 $29,471.730 $25,645.000
CONDT (PVC) (SCH 40) (1")
LF 495.000 $10.000 $10.000 $10.000 $4.270 $4.470 $10.000
CONDT (PVC) (SCH 40) (2")
LF 19,303.000 $8.000 $6.450 $6.450 $4.930 $5.160 $6.450
CONDT (PVC) (SCH 40) (2") (BORE)
LF 1,894.000 $18.000 $11.000 $11.000 $11.310 $11.850 $11.000
ELEC CONDR (NO.8) BARE
LF 18,339.000 $1.000 $0.950 $0.950 $1.130 $1.180 $0.950
ELEC CONDR (NO.8) INSULATED
LF 36,678.000 $1.000 $1.050 $1.050 $1.250 $1.310 $1.050
ELEC CONDR (NO.4) BARE
LF 2,561.000 $1.800 $1.480 $1.480 $1.510 $1.580 $1.480
ELEC CONDR (NO.4) INSULATED
LF 5,122.000 $1.900 $1.550 $1.550 $1.570 $1.640 $1.550
GROUND BOX TY A (122311)W/APRON
EA 43.000 $800.000 $695.000 $695.000 $829.520 $868.820 $695.000
ELC SRV TY A 240/480 060(NS)SS(T)SP(O)
EA 4.000 $5,000.000 $5,509.000 $5,509.000 $5,370.660 $5,625.090 $5,509.000
ELC SRV TY A 240/480 100(NS)SS(T)SP(O)
EA 3.000 $5,000.000 $5,814.000 $5,814.000 $5,696.610 $5,966.480 $5,814.000
ALUMINUM SIGNS (TY A)
SF 27.000 $30.000 $25.440 $25.440 $15.170 $15.890 $25.620
ALUMINUM SIGNS (TY G)
SF 548.000 $22.000 $19.500 $19.500 $16.890 $17.690 $26.500
ALUMINUM SIGNS (TY O)
SF 3,477.000 $20.000 $17.500 $17.500 $15.900 $16.650 $17.500
REPLACE EXISTING ALUMINUM SIGNS(TY O)
SF 668.000 $25.000 $25.750 $25.750 $15.900 $16.650 $25.750
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 100.000 $325.000 $690.000 $311.000 $311.000 $325.730 $311.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 36.000 $450.000 $830.000 $405.000 $405.000 $424.190 $405.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T-2EXT)
EA 2.000 $550.000 $1,100.000 $494.000 $494.000 $517.400 $494.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 12.000 $475.000 $870.000 $415.000 $415.000 $434.660 $415.000
IN SM RD SN SUP&AM TY10BWG(1)SB(P)
EA 19.000 $350.000 $870.000 $299.000 $299.000 $313.160 $299.000
IN SM RD SN SUP&AM TY10BWG(1)SB(T)
EA 5.000 $450.000 $860.000 $401.000 $401.000 $420.000 $401.000
IN SM RD SN SUP&AM TY10BWG(1)SB(U)
EA 1.000 $850.000 $1,000.000 $500.000 $500.000 $523.680 $500.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 2.000 $500.000 $1,000.000 $499.000 $499.000 $522.640 $499.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 10.000 $575.000 $990.000 $532.000 $532.000 $557.200 $532.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 10.000 $575.000 $1,000.000 $574.000 $574.000 $601.190 $574.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 4.000 $675.000 $1,100.000 $647.000 $647.000 $677.650 $647.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 2.000 $1,000.000 $1,100.000 $686.000 $686.000 $718.500 $686.000
IN SM RD SN SUP&AM TYS80(1)SA(U-WC)
EA 3.000 $900.000 $1,000.000 $874.000 $874.000 $915.410 $874.000
IN SM RD SN SUP&AM TYS80(1)SB(T)
EA 2.000 $950.000 $1,100.000 $491.000 $491.000 $514.260 $491.000
IN SM RD SN SUP&AM TYS80(2)SA(P)
EA 3.000 $1,350.000 $1,100.000 $1,286.000 $1,286.000 $1,346.920 $1,286.000
IN SM RD SN SUP&AM TYS80(2)SA(P-EXAL)
EA 3.000 $1,300.000 $1,200.000 $1,220.000 $1,220.000 $1,277.790 $1,220.000
IN SM RD SN SUP&AM TYS80(2)SB(P)
EA 1.000 $1,250.000 $1,300.000 $1,265.000 $1,265.000 $1,324.930 $1,265.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 1.000 $1,700.000 $3,878.680 $1,464.270 $3,000.000 $2,735.740 $1,568.280
IN BRIDGE MNT CLEARANCE SGN ASSM(TY S)
EA 10.000 $2,200.000 $4,217.910 $3,075.000 $3,100.000 $2,392.200 $1,939.320
IN SM RD SN SUP&AM (RAIL MOUNT)
EA 5.000 $1,600.000 $2,100.000 $1,735.000 $4,000.000 $1,817.190 $1,735.000
RELOCATE SM RD SN SUP&AM(HIST MRKR)
EA 1.000 $800.000 $2,000.000 $1,500.000 $1,100.000 $1,571.060 $1,500.000
REMOVE SM RD SN SUP&AM
EA 242.000 $100.000 $120.000 $100.000 $250.000 $104.740 $100.000
INSTALL LRSS (STRUCT STEEL)
LB 2,216.000 $5.000 $5.280 $5.280 $5.200 $5.450 $3.000
REMOVE LRSA
EA 23.000 $600.000 $200.000 $200.000 $680.930 $713.190 $1,100.000
INS OH SN SUP(40 FT CANT)(SPAN ONLY)
EA 11.000 $15,000.000 $12,705.000 $12,705.000 $11,363.970 $11,902.320 $12,705.000
INS OH SN SUP(80 FT BRDG)(SPAN ONLY)
EA 1.000 $31,000.000 $32,351.000 $32,351.000 $26,202.690 $27,443.990 $32,351.000
INS OH SN SUP(110 FT BRDG)(SPAN ONLY)
EA 3.000 $53,500.000 $44,445.000 $44,445.000 $35,897.550 $37,598.130 $44,445.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND
EA 77.000 $80.000 $50.000 $42.000 $43.000 $52.370 $43.000
INSTL DEL ASSM (D-SW)SZ 1(FLX)GND(BI)
EA 15.000 $70.000 $55.000 $42.000 $43.000 $57.610 $43.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB
EA 41.000 $18.000 $18.000 $18.000 $18.000 $18.850 $18.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 24.000 $26.000 $20.000 $18.000 $18.000 $20.950 $18.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 64.000 $25.000 $18.000 $20.000 $20.000 $18.850 $20.000
INSTL DEL ASSM (D-SY)SZ 1(FLX)GND
EA 10.000 $120.000 $50.000 $42.000 $43.000 $52.370 $43.000
INSTL DEL ASSM (D-SY)SZ (BRF)CTB (BI)
EA 132.000 $25.000 $20.000 $18.000 $18.000 $20.950 $43.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 50.000 $25.000 $18.000 $20.000 $20.000 $18.850 $18.000
INSTL DEL ASSM (D-DW)SZ 1(FLX)GND
EA 60.000 $90.000 $50.000 $42.000 $43.000 $52.370 $20.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 164.000 $65.000 $55.000 $42.000 $43.000 $57.610 $165.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 17,030.000 $0.200 $0.400 $0.180 $0.180 $0.190 $0.180
WK ZN PAV MRK NON-REMOV (W)4"(DOT)
LF 1,032.000 $0.500 $1.000 $1.000 $1.000 $1.050 $1.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 77,529.000 $0.130 $0.400 $0.160 $0.160 $0.170 $0.160
WK ZN PAV MRK NON-REMOV (W)(ENTR GORE)
EA 9.000 $130.000 $740.000 $280.000 $280.000 $293.260 $280.000
WK ZN PAV MRK NON-REMOV (W)(EXIT GORE)
EA 6.000 $150.000 $740.000 $280.000 $280.000 $293.260 $280.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 77,755.000 $0.130 $0.400 $0.160 $0.160 $0.170 $0.160
WK ZN PAV MRK REMOV (W)4"(DOT)
LF 393.000 $1.100 $1.800 $1.500 $1.500 $1.570 $1.500
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 103,860.000 $0.500 $0.970 $0.640 $0.640 $0.670 $0.640
WK ZN PAV MRK REMOV (W)8"(SLD)
LF 26.000 $1.500 $2.100 $1.200 $1.200 $1.260 $1.200
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 48.000 $8.500 $8.600 $3.000 $3.000 $3.140 $3.000
WK ZN PAV MRK REMOV (W)4"(BKN W/MRKR)
LF 26,828.000 $0.600 $1.200 $0.700 $0.700 $0.730 $0.700
WK ZN PAV MRK REMOV (W)(ENTR GORE)
EA 4.000 $350.000 $1,600.000 $400.000 $400.000 $418.950 $400.000
WK ZN PAV MRK REMOV (W)(EXIT GORE)
EA 8.000 $360.000 $1,800.000 $400.000 $400.000 $418.950 $400.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 104,177.000 $0.500 $0.980 $0.640 $0.640 $0.670 $0.640
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
LF 70.000 $0.750 $4.700 $1.600 $1.600 $1.680 $1.600
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 15,355.000 $0.800 $1.500 $0.900 $0.900 $0.940 $0.900
REFL PAV MRK TY I (W)12"(LNDP)(100MIL)
LF 1,046.000 $2.000 $4.900 $3.500 $3.500 $3.670 $3.500
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 1,003.000 $3.000 $4.900 $3.000 $3.000 $3.140 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 238.000 $5.800 $9.800 $6.000 $6.000 $6.280 $6.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 9.000 $104.000 $140.000 $120.000 $120.000 $125.680 $120.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 13.000 $130.000 $140.000 $120.000 $120.000 $125.680 $120.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 90.000 $27.500 $57.000 $50.000 $50.000 $52.370 $50.000
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 311.000 $5.800 $9.700 $6.000 $6.000 $6.280 $6.000
RE PV MRK TY I(BLACK)4"(SHADOW)(100MIL)
LF 33,844.000 $1.100 $0.770 $0.600 $0.600 $0.630 $0.600
PAVEMENT SEALER 4"
LF 301,584.000 $0.070 $0.090 $0.080 $0.080 $0.080 $0.080
PAVEMENT SEALER 8"
LF 15,355.000 $0.350 $0.210 $0.120 $0.120 $0.130 $0.120
PAVEMENT SEALER 12"
LF 2,049.000 $1.100 $0.570 $0.250 $0.250 $0.260 $0.250
PAVEMENT SEALER 24"
LF 356.000 $1.750 $0.900 $0.500 $0.500 $0.520 $0.500
PAVEMENT SEALER (ARROW)
EA 9.000 $34.000 $72.000 $10.000 $10.000 $10.470 $10.000
PAVEMENT SEALER (WORD)
EA 13.000 $45.000 $72.000 $10.000 $10.000 $10.470 $10.000
PAVEMENT SEALER (YLD TRI)
EA 90.000 $11.250 $72.000 $5.000 $5.000 $5.240 $5.000
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
LF 33,844.000 $0.300 $0.600 $0.400 $0.400 $0.420 $0.400
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 166,796.000 $0.250 $0.600 $0.360 $0.360 $0.380 $0.360
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 1,686.000 $0.350 $0.750 $0.400 $0.400 $0.420 $0.400
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 163,124.000 $0.250 $0.600 $0.360 $0.360 $0.380 $0.360
REFL PAV MRKR TY II-A-A
EA 1,087.000 $3.500 $5.800 $3.500 $3.500 $3.670 $3.500
REFL PAV MRKR TY II-C-R
EA 2,546.000 $3.000 $5.800 $3.500 $3.500 $3.670 $3.500
ELIM EXT PAV MRK & MRKS (4")
LF 96,200.000 $0.300 $0.730 $0.350 $0.350 $0.370 $0.350
ELIM EXT PAV MRK & MRKS (8")
LF 990.000 $1.000 $1.200 $0.700 $0.700 $0.730 $0.700
ELIM EXT PAV MRK & MRKS (ARROW)
EA 8.000 $45.000 $97.000 $60.000 $60.000 $62.840 $60.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 8.000 $55.000 $97.000 $60.000 $60.000 $62.840 $0.600
PAV SURF PREP FOR MRK (4")
LF 301,584.000 $0.060 $0.020 $0.020 $0.020 $0.020 $0.020
PAV SURF PREP FOR MRK (8")
LF 15,355.000 $0.250 $0.070 $0.050 $0.050 $0.050 $0.050
PAV SURF PREP FOR MRK (12")
LF 2,049.000 $0.600 $0.090 $0.150 $0.150 $0.160 $0.150
PAV SURF PREP FOR MRK (24")
LF 356.000 $0.750 $0.190 $0.250 $0.250 $0.260 $0.250
PAV SURF PREP FOR MRK (ARROW)
EA 9.000 $17.000 $15.000 $15.000 $15.000 $15.710 $15.000
PAV SURF PREP FOR MRK (WORD)
EA 13.000 $22.000 $15.000 $15.000 $15.000 $15.710 $15.000
PAV SURF PREP FOR MRK (36")(YLD TRI)
EA 90.000 $15.000 $15.000 $10.000 $10.000 $10.470 $10.000
NO. OF WORKING DAYS
$/D 6,270.000 $1,130.000 $825.000 $950.000 $1,130.000 $1,130.000 $1,130.000
LANDSCAPE AMENITY
EA 2.000 $206,500.000 $5,000.000 $10,000.000 $77,539.400 $5,498.710 $174,882.430
TREE PROTECTION
AC 11.830 $20,000.000 $23,684.470 $23,684.470 $23,684.470 $4,538.420 $5,424.410
LANDSCAPE SOIL AMENDMENT (TYPE I)
SY 50,578.000 $0.200 $0.960 $0.960 $0.960 $0.220 $0.960
TIP TESTING(DRILL SHAFT)
EA 13.000 $8,500.000 $16,550.000 $7,863.460 $5,750.000 $2,200.000 $5,891.180
PORTABLE CHANGEABLE MESSAGE SIGN
EA 8.000 $13,000.000 $14,120.590 $23,007.320 $37,938.000 $10,000.000 $16,202.440
AUTO PORT SMRT TRF MONITOR SYS
DAY 2,000.000 $242.000 $250.000 $350.000 $189.440 $674.600 $644.000
TMSP RADAR SPEED CONTROL MONITOR
EA 8.000 $7,385.000 $8,060.300 $10,000.000 $7,469.250 $6,598.450 $51,418.000
WATER FILLED BARRIER (350)(TL-3)
LF 1,250.000 $220.000 $243.560 $4.840 $201.750 $60.000 $57.790
Totals: $118,265,746.280 $122,051,472.890 $123,474,671.972 $126,615,459.204 $135,487,788.339 $135,872,446.228