VICTORIA CR (0913-27-078)

Items: 31

County: VICTORIA
Length: N/A
Highway: CR
District: YOAKUM
Control Number: 0913-27-078
DBE Goal: N/A
Project: BR 2B20(083)
Guaranty: N/A
Time: 86 WORKING DAYS
Engineer's Estimate: $785,144.00
Date: 06/30/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
MICHAEL BRZOZOWSKI
JAMES JANAK
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$785,144.00
Over/Under Est: 25.94% $203,688.25
Over/Under Est: 36.91% $289,800.34
Amt Left: 8.71% $86,112.09
$1,099,324.13
Over/Under Est: 40.02% $314,180.13
Amt Left: 11.17% $110,491.88
Delta: -2.27% -$24,379.79
$1,888,243.50
Over/Under Est: 140.5% $1,103,099.50
Amt Left: 90.96% $899,411.25
Delta: -71.76% -$788,919.37

Bid Items & Bid Tabulations

31 Total 0 of 31
VICTORIA  |  CR  |  YOAKUM  |  0913-27-078  |  06/30/2022  |  $785,144.00  |  BR 2B20(083)  |  BRIDGE REPL  |  86 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS STEEL INDUSTRIAL PLACING, LLC
HILL COUNTRY BRIDGE, INC.
SB CONTRACTORS LLC
CK NEWBERRY, LLC
PREPARING ROW
STA 9.250 $3,000.000 $1,150.000 $1,675.000 $4,500.000 $2,500.000
EXCAVATION (ROADWAY)
CY 280.000 $22.000 $20.000 $22.950 $20.210 $50.000
EXCAVATION (CHANNEL)
CY 635.000 $25.000 $25.000 $20.850 $17.820 $60.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 1,725.000 $25.000 $20.000 $21.900 $17.490 $60.000
BLADING
HR 20.000 $125.000 $100.000 $67.850 $80.000 $225.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 1,395.000 $2.000 $1.250 $0.800 $1.200 $1.500
BROADCAST SEED (TEMP) (WARM)
SY 349.000 $2.000 $4.300 $1.000 $2.410 $1.000
BROADCAST SEED (TEMP) (COOL)
SY 349.000 $2.000 $4.300 $1.000 $2.410 $1.000
VEGETATIVE WATERING
MG 11.800 $50.000 $75.000 $140.000 $69.000 $100.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 742.000 $125.000 $105.000 $141.900 $182.000 $225.000
CEM STABIL BKFL
CY 60.000 $150.000 $150.000 $241.500 $174.390 $350.000
DRILL SHAFT (36 IN)
LF 354.000 $250.000 $725.000 $679.000 $346.780 $550.000
CL C CONC (ABUT)
CY 36.400 $1,200.000 $1,100.000 $1,045.000 $1,335.760 $3,250.000
CL C CONC (CAP)
CY 23.000 $1,200.000 $1,250.000 $1,075.000 $1,971.380 $4,000.000
CL C CONC (COLUMN)
CY 15.700 $1,200.000 $1,300.000 $1,240.000 $1,739.190 $3,500.000
REINF CONC SLAB
SF 4,290.000 $20.000 $22.000 $27.100 $32.410 $50.000
PRESTR CONC GIRDER (TX34)
LF 653.920 $150.000 $255.000 $214.500 $230.460 $400.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 228.000 $160.000 $165.000 $203.000 $376.700 $325.000
RAIL (TY T223)
LF 366.000 $120.000 $125.000 $124.700 $124.950 $300.000
ARMOR JOINT (SEALED)
LF 46.000 $90.000 $150.000 $134.000 $278.330 $200.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $25,000.000 $20,000.000 $37,000.000 $31,329.920 $50,000.000
MOBILIZATION
LS 1.000 $70,000.000 $60,000.000 $107,500.000 $100,000.000 $275,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $1,500.000 $2,000.000 $3,085.000 $2,500.000 $2,500.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,330.000 $3.000 $4.000 $6.100 $3.900 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,330.000 $1.000 $2.000 $0.750 $1.800 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 50.000 $40.000 $55.000 $28.200 $32.460 $60.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,100.000 $2,350.000 $2,400.000 $1,984.080 $3,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,500.000 $2,925.000 $3,366.920 $4,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $40.000 $30.000 $26.000 $30.060 $30.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 4.000 $50.000 $30.000 $52.000 $54.110 $60.000
TMA (STATIONARY)
DAY 10.000 $200.000 $400.000 $500.000 $374.930 $325.000
Totals: $785,144.000 $988,832.250 $1,074,944.340 $1,099,324.140 $1,888,243.500