Show Job Controls
Bid Cobra

VICTORIA US 59 (0089-01-099)

Items: 33

County: VICTORIA
Length: N/A
Highway: US 59
District: YOAKUM
Control Number: 0089-01-099
DBE Goal: 0.0%
Project: C 89-1-99
Guaranty: N/A
Time: 117 WORKING DAYS
Engineer's Estimate: $2,709,350.00
Date: 05/02/2024 (2 years ago)
Contract Number: N/A
Type: UPGRADE DYNAMIC MESSAGE SIGN BOARDS
Mail/Deliver Bids To: N/A
CLAYTON HARRIS
JAMES JANAK
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (6)
E
Engineer's Estimate
$2,709,350.00
Over/Under Est: -31.02% -$840,388.83
Over/Under Est: -21.65% -$586,598.36
Amt Left: 13.58% $253,790.47
$2,186,489.12
Over/Under Est: -19.3% -$522,860.88
Amt Left: 16.99% $317,527.95
Delta: -3.00% -$63,737.48
$2,334,386.85
Over/Under Est: -13.84% -$374,963.15
Amt Left: 24.9% $465,425.68
Delta: -6.76% -$147,897.73
Over/Under Est: -4.13% -$111,881.72
Amt Left: 38.98% $728,507.11
Delta: -11.27% -$263,081.43
$2,820,175.25
Over/Under Est: 4.09% $110,825.25
Amt Left: 50.9% $951,214.08
Delta: -8.57% -$222,706.97
Subcontractor Percentage Amount
BATTEN DRILLING, INC. 5.68% $106,156.99
CHIRON COMMUNICATION SERVICES, LLC 1.05% $19,624.09
BUYERS BARRICADES HOUSTON, LLC 0.83% $15,512.38
Total: 7.56% $141,293.46

Bid Items & Bid Tabulations

33 Total 0 of 33
VICTORIA  |  US 59  |  YOAKUM  |  0089-01-099  |  05/02/2024  |  $2,709,350.00  |  C 89-1-99  |  UPGRADE DYNAMIC MESSAGE SIGN BOARDS  |  117 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ALLSTATE SIGNAL & CONSTRUCTION, LLC
THIRD COAST SERVICES LLC
SICE, INC.
TRAF-TEX, INC.
FLORIDA TRAFFIC CONTROL DEVICES, INC.
THE LEVY COMPANY, INC.
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 3.000 $20.000 $1,750.000 $1,143.870 $794.228 $256.000 $108.950 $130.000
BLADING
HR 28.000 $300.000 $263.970 $183.840 $648.281 $167.000 $160.220 $400.000
FL BS (CMP IN PLC)(TY A GR 5)(FNAL POS)
CY 96.000 $300.000 $220.000 $187.890 $451.245 $274.000 $307.620 $290.000
DRILL SHAFT (42 IN)
LF 189.000 $500.000 $539.480 $402.540 $677.699 $492.000 $798.190 $1,300.000
DRILL SHAFT (48 IN)
LF 270.000 $600.000 $551.360 $392.470 $798.561 $596.000 $890.780 $1,300.000
RIPRAP (CONC)(4 IN)
CY 9.000 $600.000 $640.000 $623.440 $1,640.873 $1,740.000 $1,903.400 $1,100.000
MOBILIZATION
LS 1.000 $250,000.000 $25,000.000 $212,275.160 $128,326.850 $58,375.000 $258,579.660 $282,300.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $2,500.000 $1,945.000 $2,624.220 $12,328.547 $5,942.000 $1,140.820 $11,170.000
CONSTRUCTION EXITS (INSTALL) (TY 3)
SY 546.000 $50.000 $39.000 $6.280 $83.907 $27.150 $128.170 $65.000
CONSTRUCTION EXITS (REMOVE)
SY 546.000 $20.000 $11.540 $6.280 $41.162 $7.900 $64.090 $17.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 900.000 $10.000 $8.500 $5.470 $6.251 $6.100 $13.670 $5.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 900.000 $2.500 $4.000 $3.280 $0.634 $1.610 $7.510 $1.800
CONDT (HDPE) (2") (STL ENCSE)
LF 1,120.000 $60.000 $50.000 $32.620 $27.309 $72.500 $41.420 $90.000
CONDT (HDPE) (3")
LF 7,205.000 $50.000 $15.850 $6.570 $14.721 $24.000 $15.060 $12.500
CONDT (RM) (2")
LF 1,080.000 $60.000 $26.000 $28.710 $33.416 $34.000 $33.030 $5.000
ELEC CONDR (NO.2) BARE
LF 8,725.000 $5.000 $4.150 $3.350 $2.408 $3.610 $2.920 $3.350
ELEC CONDR (NO.2) INSULATED
LF 19,205.000 $5.000 $4.250 $3.970 $2.729 $4.660 $4.120 $3.600
GROUND BOX TY A (122311)W/APRON
EA 30.000 $1,400.000 $1,160.000 $1,340.130 $1,784.283 $1,368.000 $1,332.190 $1,300.000
ELC SRV TY D 120/240 100(NS)SS(N)SP(O)
EA 7.000 $7,500.000 $7,720.000 $6,318.020 $5,991.551 $8,989.000 $6,892.190 $8,100.000
INS OH SN SUP(25 FT BAL TEE)
EA 9.000 $45,000.000 $46,150.000 $69,625.390 $49,364.817 $68,919.000 $68,752.890 $76,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 21.000 $8,500.000 $235.000 $1,634.090 $4,151.430 $3,158.000 $366.230 $690.000
FIBER OPTIC CBL (SNGLE-MODE)(6 FIBER)
LF 2,180.000 $4.000 $4.850 $7.450 $8.415 $12.500 $11.450 $7.500
FIBER OPTIC SPLICE ENCLOSURE
EA 19.000 $3,200.000 $2,505.000 $3,908.710 $1,929.626 $1,678.000 $832.400 $250.000
FIBER OPTIC PATCH PANEL (12 POSITION)
EA 18.000 $1,600.000 $1,710.000 $3,996.610 $1,770.859 $836.000 $2,641.640 $1,200.000
CCTV FIELD EQUIPMENT (DIGITAL)
EA 9.000 $9,700.000 $9,637.000 $8,998.110 $7,392.690 $7,026.000 $8,234.370 $9,600.000
CCTV FIELD CONTROLLER
EA 9.000 $900.000 $755.000 $1,776.270 $612.205 $2,241.000 $656.460 $1.000
INSTALL DMS (FOUNDATION MTD CABINET)
EA 9.000 $15,000.000 $13,205.000 $4,687.170 $11,044.352 $16,613.000 $13,831.790 $13,800.000
ITS POLE (55 FT)(90 MPH)
EA 9.000 $28,000.000 $19,621.000 $20,059.030 $20,906.957 $20,223.000 $20,856.450 $23,800.000
ITS POLE MNT CAB (TY 2)(CONF 1)
EA 9.000 $6,200.000 $5,445.000 $6,130.380 $3,741.326 $7,649.000 $8,149.780 $5,500.000
ETHERNET SWITCH (INSTALL ONLY)
EA 18.000 $550.000 $500.000 $1,143.850 $142.479 $348.000 $1,156.080 $370.000
TMA (STATIONARY)
DAY 21.000 $400.000 $229.000 $875.950 $508.750 $332.000 $398.280 $130.000
ITS GND BOX(PCAST) TY 1 (243636)W/APRN
EA 19.000 $5,600.000 $5,427.000 $5,602.710 $4,696.128 $5,007.000 $4,600.150 $6,500.000
BLUETOOTH DETECTION SYSTEM (INSTALL)
EA 7.000 $2,800.000 $4,305.000 $1,715.790 $1,000.361 $4,626.000 $11,795.850 $1,100.000
Totals: $2,709,350.000 $1,868,961.170 $2,122,751.640 $2,186,489.207 $2,334,386.850 $2,597,468.280 $2,820,175.250