VAN ZANDT IH 20 (0495-03-063)

Items: 55

County: VAN ZANDT
Length: N/A
Highway: IH 20
District: TYLER
Control Number: 0495-03-063
DBE Goal: N/A
Project: NH 2020(301)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $6,817,961.90
Date: 02/07/2020 (6 years ago)
Contract Number: N/A
Type: PLANING, PAVEMENT REPAIR, OCST, OV, MBGF, PV MK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$6,817,961.90
$6,622,008.83
Over/Under Est: -2.87% -$195,953.07
Over/Under Est: 7.26% $495,257.45
Amt Left: 10.44% $691,210.52

Bid Items & Bid Tabulations

55 Total 0 of 55
VAN ZANDT  |  IH 20  |  TYLER  |  0495-03-063  |  02/07/2020  |  $6,817,961.90  |  NH 2020(301)  |  PLANING, PAVMT REPAIR, OCST, OV, MBG...  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
AUSTIN BRIDGE & ROAD SERVICES, LP
EAST TEXAS BRIDGE, INC.
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 172.000 $16.000 $100.000 $40.000
BACKFILL (TY A)
STA 931.000 $250.000 $160.000 $300.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 52,709.000 $1.000 $0.880 $0.750
VEGETATIVE WATERING
MG 580.000 $15.000 $45.000 $20.000
ASPH (AC-20-5TR)
GAL 16,820.000 $5.000 $4.000 $5.000
AGGR (TY-PD GR-3 OR TY-PL GR-3)
CY 400.000 $125.000 $214.350 $145.000
TBPFC (MEMBRANE)
GAL 69,601.000 $3.000 $2.800 $3.000
TBPFC (ASPHALT)(PG 76-22)
TON 964.000 $75.000 $149.000 $165.000
TBPFC (AGGREGATE) (SAC-A)
TON 15,098.000 $175.000 $149.000 $165.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 6,000.000 $50.000 $48.500 $50.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(4")
SY 6,000.000 $40.000 $32.500 $40.000
PLANE ASPH CONC PAV (1.5")
SY 2,793.000 $2.500 $4.000 $4.000
PLANE ASPH CONC PAV (2")
SY 4,833.000 $2.000 $7.500 $4.000
PLANE ASPH CONC PAV (0" TO 1 1/2")
SY 12,006.000 $5.000 $3.500 $4.000
RIPRAP (CONC)(4 IN)
CY 115.000 $400.000 $715.000 $700.000
RIPRAP (MOW STRIP)(4 IN)
CY 259.000 $480.000 $600.000 $600.000
HEADER TYPE EXPANSION JOINT
CF 304.000 $400.000 $340.000 $400.000
JOINT SEALANT
LF 1,810.000 $20.000 $9.000 $15.000
MOBILIZATION
LS 1.000 $457,000.000 $510,000.000 $700,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $5,000.000 $30,250.000 $90,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 150.000 $33.000 $29.300 $40.000
ROCK FILTER DAMS (REMOVE)
LF 150.000 $10.000 $14.640 $8.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 40.000 $19.900 $90.000 $40.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 30.000 $90.000 $155.000 $125.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 5,460.000 $2.600 $2.880 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 5,460.000 $1.000 $0.570 $0.750
RUMBLE STRIPS (SHOULDER)
LF 107,934.000 $0.250 $0.230 $0.250
MTL W-BEAM GD FEN (TIM POST)
LF 3,350.000 $20.500 $19.600 $21.000
SHORT RADIUS
LF 162.500 $35.000 $20.500 $45.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 12.000 $1,100.000 $1,000.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 1,550.000 $2.500 $2.000 $3.000
REMOVE TERMINAL ANCHOR SECTION
EA 11.000 $250.000 $100.000 $120.000
GUARDRAIL END TREATMENT (INSTALL)
EA 18.000 $2,750.000 $2,575.000 $2,700.000
GUARDRAIL END TREATMENT (REMOVE)
EA 11.000 $275.000 $225.000 $300.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 1.000 $290.000 $500.000 $500.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 78.000 $32.000 $28.500 $40.000
WK ZN PAV MRK REMOV (W)6"(BRK)
LF 29,750.000 $2.000 $1.850 $1.500
WK ZN PAV MRK REMOV (W)6"(SLD)
LF 1,261.000 $1.500 $5.150 $1.500
WK ZN PAV MRK REMOV (Y)6"(SLD)
LF 1,261.000 $1.500 $5.150 $1.500
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 590.000 $1.250 $1.000 $2.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 7,681.000 $1.000 $0.840 $1.000
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 300.000 $4.000 $3.500 $4.000
REFL PAV MRK TY I (W)(NUMBER)(100MIL)
EA 6.000 $260.000 $250.000 $300.000
RE PM W/RET REQ TY I (W)6"(BRK)(100MIL)
LF 14,890.000 $0.750 $0.600 $0.660
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 58,811.000 $0.700 $0.550 $0.600
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 58,811.000 $0.700 $0.550 $0.600
REFL PAV MRK TY I (W)12"(DOT)(100MIL)
LF 72.000 $3.000 $5.000 $5.500
REFL PAV MRKR TY II-C-R
EA 1,155.000 $4.000 $3.600 $4.000
NO. OF WORKING DAYS
$/D 15,000.000 $98.000 $98.000 $78.000
MEMBRANE UNDERSEAL
GAL 967.000 $5.000 $2.800 $10.000
SP MIXES SP-C SAC-A PG70-22
TON 532.000 $115.000 $181.000 $165.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 325.000 $150.000 $85.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $12,000.000 $11,000.000 $20,000.000
TMA (STATIONARY)
DAY 92.000 $175.000 $260.000 $300.000
TMA (MOBILE OPERATION)
DAY 141.000 $150.000 $310.000 $300.000
Totals: $6,817,961.900 $6,622,008.830 $7,313,219.350