PREPARING ROW
|
STA
|
192.000
|
$2,500.000
|
$7,500.000
|
$17,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
1,513.000
|
$20.000
|
$32.000
|
$32.000
|
|
|
REMOVING CONC (CTB)
|
LF
|
625.000
|
$12.000
|
$43.000
|
$50.000
|
|
|
REMOVING STAB BASE & ASPH PAV (0-6")
|
SY
|
51,299.000
|
$12.000
|
$5.000
|
$13.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
19,804.000
|
$14.000
|
$9.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY B)
|
CY
|
548,634.000
|
$17.000
|
$21.000
|
$14.500
|
|
|
BACKFILL (TY A)
|
STA
|
192.000
|
$261.000
|
$490.000
|
$550.000
|
|
|
BLADING
|
STA
|
192.000
|
$195.000
|
$286.000
|
$450.000
|
|
|
BULLDOZER WORK
|
HR
|
144.000
|
$200.000
|
$114.000
|
$175.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
261,034.000
|
$2.000
|
$1.200
|
$4.000
|
|
|
DRILL SEEDING (PERM) (RURAL) (CLAY)
|
SY
|
261,034.000
|
$0.200
|
$0.170
|
$0.200
|
|
|
DRILL SEED (TEMP)(WARM OR COOL)
|
SY
|
261,034.000
|
$0.200
|
$0.170
|
$0.200
|
|
|
VEGETATIVE WATERING
|
MG
|
5,743.000
|
$9.700
|
$39.000
|
$40.000
|
|
|
SOIL RETENTION BLANKETS (CL 1) (TY A)
|
SY
|
261,034.000
|
$1.500
|
$0.700
|
$1.500
|
|
|
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
|
CY
|
19,957.000
|
$60.000
|
$100.000
|
$80.000
|
|
|
CEMENT
|
TON
|
1,324.000
|
$250.000
|
$360.000
|
$340.000
|
|
|
CEMENT TREAT (SUBGRADE)(10")
|
SY
|
80,300.000
|
$3.000
|
$4.500
|
$5.500
|
|
|
PRIME COAT (MC-30)
|
GAL
|
32,124.000
|
$6.000
|
$9.000
|
$5.500
|
|
|
ASPH (AC-20-5TR)
|
GAL
|
38,298.000
|
$5.000
|
$7.000
|
$6.000
|
|
|
AGGR (TY-PB GR-4)
|
CY
|
699.000
|
$130.000
|
$467.000
|
$250.000
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
2,984.000
|
$4.000
|
$3.200
|
$6.000
|
|
|
CEM STABIL BKFL
|
CY
|
687.000
|
$205.000
|
$265.000
|
$300.000
|
|
|
CUT & RESTORING PAV
|
SY
|
10.000
|
$200.000
|
$230.000
|
$650.000
|
|
|
TRENCH EXCAVATION PROTECTION
|
LF
|
246.000
|
$15.000
|
$50.000
|
$25.000
|
|
|
TEMPORARY SPL SHORING
|
SF
|
19,969.000
|
$50.000
|
$34.000
|
$65.000
|
|
|
DRILL SHAFT (18 IN)
|
LF
|
480.000
|
$165.000
|
$146.000
|
$220.000
|
|
|
DRILL SHAFT (36 IN)
|
LF
|
1,820.000
|
$355.000
|
$300.000
|
$480.000
|
|
|
DRILL SHAFT (42 IN)
|
LF
|
31.000
|
$400.000
|
$360.000
|
$1,200.000
|
|
|
DRILL SHAFT (NON - REINFORCED) (12 IN)
|
LF
|
7.000
|
$155.000
|
$140.000
|
$300.000
|
|
|
DRILL SHAFT (RDWY ILL POLE) (30 IN)
|
LF
|
8.000
|
$310.000
|
$1,285.000
|
$1,200.000
|
|
|
CL A CONC (COLLAR)
|
EA
|
6.000
|
$945.000
|
$1,275.000
|
$2,000.000
|
|
|
CL B CONC (FLUME)
|
CY
|
84.000
|
$945.000
|
$1,018.000
|
$900.000
|
|
|
CL C CONC (ABUT)(HPC)
|
CY
|
216.000
|
$1,600.000
|
$1,071.000
|
$1,300.000
|
|
|
CL C CONC (CAP)(HPC)
|
CY
|
76.000
|
$2,010.000
|
$1,500.000
|
$1,500.000
|
|
|
CL C CONC (COLUMN)(HPC)
|
CY
|
59.000
|
$2,000.000
|
$1,400.000
|
$1,400.000
|
|
|
CL C CONC (RETAINING WALL)
|
CY
|
4.000
|
$1,700.000
|
$2,200.000
|
$5,000.000
|
|
|
CL C CONC (RAIL FOUNDATION)
|
CY
|
281.000
|
$800.000
|
$600.000
|
$910.000
|
|
|
REINF CONC SLAB
|
SF
|
17,480.000
|
$27.000
|
$20.000
|
$38.000
|
|
|
REINF CONC SLAB (HPC)
|
SF
|
11,780.000
|
$38.000
|
$25.000
|
$41.000
|
|
|
APPROACH SLAB
|
CY
|
221.000
|
$725.000
|
$900.000
|
$1,000.000
|
|
|
APPROACH SLAB (HPC)
|
CY
|
152.000
|
$1,150.000
|
$900.000
|
$1,000.000
|
|
|
RETAINING WALL (MSE)
|
SF
|
22,627.000
|
$70.000
|
$122.000
|
$105.000
|
|
|
PRESTR CONC GIRDER (TX40)
|
LF
|
3,780.000
|
$250.000
|
$200.000
|
$260.000
|
|
|
RIPRAP (CONC)(4 IN)
|
CY
|
460.000
|
$600.000
|
$500.000
|
$750.000
|
|
|
RIPRAP (CONC)(CL B)
|
CY
|
2.000
|
$750.000
|
$3,100.000
|
$3,000.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(8 IN)
|
CY
|
11.000
|
$190.000
|
$600.000
|
$400.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
97.000
|
$650.000
|
$920.000
|
$750.000
|
|
|
RAIL (TY T551)
|
LF
|
1,838.000
|
$125.000
|
$135.000
|
$150.000
|
|
|
RAIL (TY T80PP)
|
LF
|
625.000
|
$350.000
|
$332.000
|
$190.000
|
|
|
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
|
LF
|
318.000
|
$220.000
|
$239.000
|
$240.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
2,363.000
|
$115.000
|
$60.000
|
$80.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
1,291.000
|
$115.000
|
$80.000
|
$100.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
1,772.000
|
$225.000
|
$142.000
|
$160.000
|
|
|
RC PIPE (CL V)(18 IN)
|
LF
|
55.000
|
$185.000
|
$108.000
|
$110.000
|
|
|
RC PIPE (CL V)(24 IN)
|
LF
|
63.000
|
$215.000
|
$145.000
|
$150.000
|
|
|
MANH (COMPL)(PRM)(60IN)
|
EA
|
1.000
|
$7,000.000
|
$9,100.000
|
$13,500.000
|
|
|
INLET(COMPL)(PAZD)(FG)(5FTX5FT-3FTX3FT)
|
EA
|
1.000
|
$12,000.000
|
$9,800.000
|
$12,500.000
|
|
|
HEADWALL (CH - PW - S) (DIA= 24 IN)
|
EA
|
1.000
|
$14,000.000
|
$10,000.000
|
$10,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (2: 1) (C)
|
EA
|
1.000
|
$1,500.000
|
$2,600.000
|
$3,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (4: 1) (C)
|
EA
|
1.000
|
$1,115.000
|
$2,600.000
|
$1,500.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (C)
|
EA
|
8.000
|
$1,400.000
|
$2,600.000
|
$1,200.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
44.000
|
$1,550.000
|
$2,600.000
|
$1,200.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,700.000
|
$2,700.000
|
$2,000.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (C)
|
EA
|
11.000
|
$2,700.000
|
$2,900.000
|
$2,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$4,400.000
|
$4,400.000
|
$4,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (6: 1) (C)
|
EA
|
18.000
|
$4,500.000
|
$5,803.000
|
$5,200.000
|
|
|
REMOV STR (INLET)
|
EA
|
1.000
|
$1,300.000
|
$1,000.000
|
$2,750.000
|
|
|
REMOV STR (SET)
|
EA
|
58.000
|
$440.000
|
$700.000
|
$700.000
|
|
|
REMOV STR (PIPE)
|
LF
|
1,677.000
|
$20.000
|
$24.000
|
$27.000
|
|
|
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
|
EA
|
3.000
|
$150,000.000
|
$74,000.000
|
$250,000.000
|
|
|
REMOV STR (SMALL FENCE)
|
LF
|
50.000
|
$14.000
|
$20.000
|
$65.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$3,112,189.640
|
$3,778,928.870
|
$4,000,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
35.000
|
$5,000.000
|
$11,500.000
|
$20,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
430.000
|
$32.000
|
$30.000
|
$55.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
430.000
|
$8.000
|
$11.000
|
$19.000
|
|
|
CONSTRUCTION EXITS (INSTALL) (TY 1)
|
SY
|
1,332.000
|
$21.000
|
$30.000
|
$52.000
|
|
|
CONSTRUCTION EXITS (REMOVE)
|
SY
|
1,332.000
|
$5.700
|
$11.000
|
$15.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
4,500.000
|
$30.000
|
$14.000
|
$40.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
600.000
|
$70.000
|
$270.000
|
$150.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
24,764.000
|
$2.900
|
$3.500
|
$4.000
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
24,764.000
|
$0.650
|
$1.000
|
$1.000
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (8")
|
LF
|
300.000
|
$10.400
|
$4.000
|
$7.000
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
300.000
|
$4.600
|
$1.000
|
$3.000
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
300.000
|
$150.000
|
$300.000
|
$200.000
|
|
|
CONSTRUCTING DETOURS
|
SY
|
4,175.000
|
$100.000
|
$214.000
|
$195.000
|
|
|
ONE-WAY TRAF CONT (PORT TRAF SIG)
|
MO
|
3.000
|
$15,000.000
|
$3,700.000
|
$15,000.000
|
|
|
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
|
LF
|
6,210.000
|
$45.000
|
$66.000
|
$95.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
|
LF
|
5,060.000
|
$40.000
|
$110.000
|
$95.000
|
|
|
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
|
LF
|
280.000
|
$80.000
|
$105.000
|
$100.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 1)
|
LF
|
4,480.000
|
$30.000
|
$8.000
|
$9.000
|
|
|
PORT CTB (MOVE)(LOW PROF)(TY 2)
|
LF
|
300.000
|
$30.000
|
$9.000
|
$9.000
|
|
|
PORT CTB (STKPL)(F-SHAPE)(TY 1)
|
LF
|
6,210.000
|
$20.000
|
$20.000
|
$18.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 1)
|
LF
|
5,060.000
|
$20.000
|
$14.000
|
$16.000
|
|
|
PORT CTB (STKPL)(LOW PROF)(TY 2)
|
LF
|
280.000
|
$20.000
|
$14.000
|
$16.000
|
|
|
DRIVEWAYS (CONC)
|
SY
|
1,930.000
|
$110.000
|
$95.000
|
$135.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
5,240.000
|
$50.000
|
$170.000
|
$95.000
|
|
|
MTL W-BEAM GD FEN (STEEL POST)
|
LF
|
1,445.000
|
$35.000
|
$36.000
|
$38.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$2,350.000
|
$2,800.000
|
$2,420.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
3.000
|
$1,400.000
|
$3,500.000
|
$1,650.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
1,497.000
|
$3.000
|
$3.500
|
$15.000
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
4.000
|
$275.000
|
$256.000
|
$220.000
|
|
|
REMOVE DOWNSTREAM ANCHOR TERMINAL
|
EA
|
2.000
|
$175.000
|
$96.000
|
$220.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
9.000
|
$3,250.000
|
$4,100.000
|
$3,330.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
6.000
|
$175.000
|
$500.000
|
$220.000
|
|
|
CRASH CUSH ATTEN (REMOVE)
|
EA
|
6.000
|
$1,200.000
|
$2,000.000
|
$1,100.000
|
|
|
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
|
EA
|
6.000
|
$30,000.000
|
$28,000.000
|
$29,000.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 1
|
EA
|
6.000
|
$350.000
|
$320.000
|
$550.000
|
|
|
REMOVE RD IL ASM (TRANS-BASE)
|
EA
|
4.000
|
$865.000
|
$1,400.000
|
$1,585.000
|
|
|
IN RD IL (TY SA) 40T-8 (250W EQ) LED
|
EA
|
6.000
|
$4,400.000
|
$6,500.000
|
$7,700.000
|
|
|
CONDT (PVC) (SCH 40) (2")
|
LF
|
1,815.000
|
$16.000
|
$12.000
|
$13.000
|
|
|
CONDT (PVC) (SCH 40) (2") (BORE)
|
LF
|
70.000
|
$31.000
|
$32.000
|
$33.000
|
|
|
CONDT (PVC) (SCH 80) (2")
|
LF
|
1,670.000
|
$20.000
|
$13.000
|
$14.000
|
|
|
CONDT (PVC) (SCH 80) (2") (BORE)
|
LF
|
477.000
|
$30.000
|
$34.000
|
$36.000
|
|
|
CONDT (RM) (2")
|
LF
|
60.000
|
$42.000
|
$50.000
|
$52.000
|
|
|
ELEC CONDR (NO.8) BARE
|
LF
|
4,092.000
|
$2.000
|
$3.500
|
$4.000
|
|
|
ELEC CONDR (NO.8) INSULATED
|
LF
|
7,389.000
|
$2.000
|
$3.500
|
$4.000
|
|
|
ELEC CONDR (NO.6) INSULATED
|
LF
|
768.000
|
$3.000
|
$4.000
|
$4.500
|
|
|
ELEC CONDR (NO.4) BARE
|
LF
|
40.000
|
$2.850
|
$5.000
|
$5.000
|
|
|
ELEC CONDR (NO.4) INSULATED
|
LF
|
240.000
|
$3.500
|
$5.000
|
$5.000
|
|
|
GROUND BOX TY A (122311)W/APRON
|
EA
|
12.000
|
$1,500.000
|
$1,000.000
|
$1,000.000
|
|
|
GROUND BOX TY D (162922)W/APRON
|
EA
|
8.000
|
$1,535.000
|
$1,000.000
|
$1,100.000
|
|
|
REMOVE GROUND BOX
|
EA
|
3.000
|
$375.000
|
$500.000
|
$500.000
|
|
|
ELC SRV TY T 120/240 000(NS)GS(L)SP(U)
|
EA
|
1.000
|
$11,000.000
|
$4,000.000
|
$4,500.000
|
|
|
ELC SRV TY T 120/240 000(NS)GS(L)TP(O)
|
EA
|
1.000
|
$3,530.000
|
$4,000.000
|
$4,500.000
|
|
|
ALUMINUM SIGNS (TY G)
|
SF
|
143.000
|
$29.000
|
$36.000
|
$50.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
59.000
|
$746.000
|
$600.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
14.000
|
$945.000
|
$850.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
7.000
|
$1,126.000
|
$1,000.000
|
$1,000.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
|
EA
|
3.000
|
$1,197.000
|
$1,100.000
|
$1,300.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
|
EA
|
5.000
|
$1,350.000
|
$1,200.000
|
$1,400.000
|
|
|
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
|
EA
|
6.000
|
$1,916.000
|
$2,500.000
|
$1,700.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
90.000
|
$102.000
|
$125.000
|
$120.000
|
|
|
REMOVE BRDG MNT CLEARANCE SIGN ASSM
|
EA
|
6.000
|
$438.000
|
$1,200.000
|
$600.000
|
|
|
INSTALL LRSS (STRUCT STEEL)
|
LB
|
231.000
|
$9.000
|
$7.000
|
$11.000
|
|
|
REMOVE LRSA
|
EA
|
1.000
|
$1,269.000
|
$1,500.000
|
$2,000.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
13,875.000
|
$1.000
|
$0.550
|
$3.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
|
LF
|
895.000
|
$2.000
|
$0.750
|
$6.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
869.000
|
$4.000
|
$4.500
|
$6.000
|
|
|
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
|
EA
|
33.000
|
$20.000
|
$28.000
|
$90.000
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
42,520.000
|
$1.000
|
$0.500
|
$3.000
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
357.000
|
$2.000
|
$1.300
|
$3.000
|
|
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
|
LF
|
589.000
|
$7.000
|
$7.500
|
$8.000
|
|
REFL PAV MRK TY I (W)(ARROW)(100MIL)
|
EA
|
2.000
|
$179.000
|
$165.000
|
$180.000
|
|
REFL PAV MRK TY I (W)(WORD)(100MIL)
|
EA
|
2.000
|
$211.000
|
$185.000
|
$250.000
|
|
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
|
EA
|
8.000
|
$54.000
|
$47.000
|
$150.000
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
|
LF
|
36,101.000
|
$1.000
|
$1.000
|
$1.200
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
|
LF
|
30.000
|
$2.000
|
$1.000
|
$3.500
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
|
LF
|
36,382.000
|
$1.000
|
$1.000
|
$1.200
|
|
REFL PAV MRKR TY I-C
|
EA
|
16.000
|
$6.000
|
$7.000
|
$7.000
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,685.000
|
$5.000
|
$5.000
|
$5.000
|
|
|
INSTALL RDSD FLASH BEACON ASSEMBLY
|
EA
|
4.000
|
$6,815.000
|
$7,500.000
|
$10,000.000
|
|
|
SP MIXES SP-C SAC-B PG64-22
|
TON
|
8,675.000
|
$105.000
|
$200.000
|
$190.000
|
|
|
SP MIXES SP-C SAC-B PG70-22
|
TON
|
9,003.000
|
$105.000
|
$180.000
|
$200.000
|
|
|
TACK COAT
|
GAL
|
8,739.000
|
$3.100
|
$3.500
|
$6.000
|
|
|
UNDERSEAL COURSE
|
GAL
|
597.000
|
$5.000
|
$7.000
|
$10.000
|
|
|
GATE (ADJUST)
|
EA
|
1.000
|
$15,000.000
|
$2,750.000
|
$3,000.000
|
|
|
GATE (INSTALL)
|
EA
|
1.000
|
$30,000.000
|
$5,400.000
|
$6,000.000
|
|
|
REMOVE ROADWAY ILLUM ASSEMBLY (HPS)
|
EA
|
2.000
|
$330.000
|
$1,500.000
|
$1,600.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
168.000
|
$145.000
|
$120.000
|
$200.000
|
|
|
RELOCATE CCTV FIELD EQUIPMENT
|
EA
|
2.000
|
$3,000.000
|
$6,000.000
|
$6,600.000
|
|
|
ITS POLE (50 FT)(90 MPH)
|
EA
|
1.000
|
$20,000.000
|
$27,000.000
|
$26,000.000
|
|
|
ITS POLE (50 FT)(REL)
|
EA
|
1.000
|
$19,000.000
|
$12,000.000
|
$12,000.000
|
|
|
ITS POLE (50 FT)(REM)
|
EA
|
1.000
|
$5,000.000
|
$6,000.000
|
$6,000.000
|
|
|
ITS POLE MNT CAB (TY 2)(CONF 2)(REL)
|
EA
|
2.000
|
$5,000.000
|
$8,800.000
|
$9,000.000
|
|
|
TMA (STATIONARY)
|
DAY
|
402.000
|
$510.000
|
$260.000
|
$350.000
|
|
Totals: |
$31,709,756.840
|
$39,144,959.930
|
$41,184,739.200
|