VAN ZANDT IH 20 (0495-02-064)

Items: 165

County: VAN ZANDT
Length: N/A
Highway: IH 20
District: TYLER
Control Number: 0495-02-064
DBE Goal: N/A
Project: BR 2B23(276)
Guaranty: N/A
Time: 616 WORKING DAYS
Engineer's Estimate: $31,709,756.84
Date: 08/03/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
LANCE POMYKAL
JOSH FULTON
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (2)
E
Engineer's Estimate
$31,709,756.84
$39,144,959.93
Over/Under Est: 23.45% $7,435,203.09
Over/Under Est: 29.88% $9,474,982.36
Amt Left: 5.21% $2,039,779.27
Subcontractor Percentage Amount
PEACHTREE CONSTRUCTION, LTD. 11.25% $4,701,493.24
HILBASH INVESTMENT LLC 7.85% $3,280,597.51
A R DANIEL CONSTRUCTION SERVICES, INCORPORATED 2.36% $986,268.80
WYLIE DRILLING & DRAINAGE, INC. 0.79% $330,149.30
STRIPING TECHNOLOGY, L.P. 0.67% $280,000.04
SOUTHWEST ENVIRONMENT SERVICES LLC 0.60% $250,746.31
TEXCO SERVICES, LLC 0.46% $192,238.83
KING GEORGE TRAFFIC SOLUTIONS LLC 0.42% $175,522.41
USA SWPPP INSPECTIONS, INC.DBA USA EROSION 0.39% $162,985.10
TRAFFIC HIGHWAY MAINTENANCE, LLC 0.34% $142,089.57
DUSTROL, INC. 0.33% $137,910.47
SOUTHWEST ROAD & SAFETY CONTRACTORS, LTD. 0.21% $87,761.21
HERMANOS STEEL, LLC 0.19% $79,403.00
FC TRAFFIC CONTROL, INC. 0.16% $66,865.68
SCOTT DERR PAINTING CO, LLC 0.06% $25,074.63
CARTHAGE DRILLING, LLC 0.05% $20,895.53
PENHALL COMPANY 0.04% $16,716.42
DFW REBAR, INC. 0.03% $12,537.32
ACT SAW CUTTING & REMOVAL 0.00% $0.00
Total: 26.20% $10,949,255.37

Bid Items & Bid Tabulations

165 Total 0 of 165
VAN ZANDT  |  IH 20  |  TYLER  |  0495-02-064  |  08/03/2023  |  $31,709,756.84  |  BR 2B23(276)  |  BRIDGE REPL  |  616 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
INDUS ROAD & BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
PREPARING ROW
STA 192.000 $2,500.000 $7,500.000 $17,000.000
REMOVING CONC (DRIVEWAYS)
SY 1,513.000 $20.000 $32.000 $32.000
REMOVING CONC (CTB)
LF 625.000 $12.000 $43.000 $50.000
REMOVING STAB BASE & ASPH PAV (0-6")
SY 51,299.000 $12.000 $5.000 $13.000
EXCAVATION (ROADWAY)
CY 19,804.000 $14.000 $9.000 $15.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 548,634.000 $17.000 $21.000 $14.500
BACKFILL (TY A)
STA 192.000 $261.000 $490.000 $550.000
BLADING
STA 192.000 $195.000 $286.000 $450.000
BULLDOZER WORK
HR 144.000 $200.000 $114.000 $175.000
FURNISHING AND PLACING TOPSOIL (4")
SY 261,034.000 $2.000 $1.200 $4.000
DRILL SEEDING (PERM) (RURAL) (CLAY)
SY 261,034.000 $0.200 $0.170 $0.200
DRILL SEED (TEMP)(WARM OR COOL)
SY 261,034.000 $0.200 $0.170 $0.200
VEGETATIVE WATERING
MG 5,743.000 $9.700 $39.000 $40.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 261,034.000 $1.500 $0.700 $1.500
FL BS (CMP IN PLC)(TYD GR1-2)(FNAL POS)
CY 19,957.000 $60.000 $100.000 $80.000
CEMENT
TON 1,324.000 $250.000 $360.000 $340.000
CEMENT TREAT (SUBGRADE)(10")
SY 80,300.000 $3.000 $4.500 $5.500
PRIME COAT (MC-30)
GAL 32,124.000 $6.000 $9.000 $5.500
ASPH (AC-20-5TR)
GAL 38,298.000 $5.000 $7.000 $6.000
AGGR (TY-PB GR-4)
CY 699.000 $130.000 $467.000 $250.000
PLANE ASPH CONC PAV (2")
SY 2,984.000 $4.000 $3.200 $6.000
CEM STABIL BKFL
CY 687.000 $205.000 $265.000 $300.000
CUT & RESTORING PAV
SY 10.000 $200.000 $230.000 $650.000
TRENCH EXCAVATION PROTECTION
LF 246.000 $15.000 $50.000 $25.000
TEMPORARY SPL SHORING
SF 19,969.000 $50.000 $34.000 $65.000
DRILL SHAFT (18 IN)
LF 480.000 $165.000 $146.000 $220.000
DRILL SHAFT (36 IN)
LF 1,820.000 $355.000 $300.000 $480.000
DRILL SHAFT (42 IN)
LF 31.000 $400.000 $360.000 $1,200.000
DRILL SHAFT (NON - REINFORCED) (12 IN)
LF 7.000 $155.000 $140.000 $300.000
DRILL SHAFT (RDWY ILL POLE) (30 IN)
LF 8.000 $310.000 $1,285.000 $1,200.000
CL A CONC (COLLAR)
EA 6.000 $945.000 $1,275.000 $2,000.000
CL B CONC (FLUME)
CY 84.000 $945.000 $1,018.000 $900.000
CL C CONC (ABUT)(HPC)
CY 216.000 $1,600.000 $1,071.000 $1,300.000
CL C CONC (CAP)(HPC)
CY 76.000 $2,010.000 $1,500.000 $1,500.000
CL C CONC (COLUMN)(HPC)
CY 59.000 $2,000.000 $1,400.000 $1,400.000
CL C CONC (RETAINING WALL)
CY 4.000 $1,700.000 $2,200.000 $5,000.000
CL C CONC (RAIL FOUNDATION)
CY 281.000 $800.000 $600.000 $910.000
REINF CONC SLAB
SF 17,480.000 $27.000 $20.000 $38.000
REINF CONC SLAB (HPC)
SF 11,780.000 $38.000 $25.000 $41.000
APPROACH SLAB
CY 221.000 $725.000 $900.000 $1,000.000
APPROACH SLAB (HPC)
CY 152.000 $1,150.000 $900.000 $1,000.000
RETAINING WALL (MSE)
SF 22,627.000 $70.000 $122.000 $105.000
PRESTR CONC GIRDER (TX40)
LF 3,780.000 $250.000 $200.000 $260.000
RIPRAP (CONC)(4 IN)
CY 460.000 $600.000 $500.000 $750.000
RIPRAP (CONC)(CL B)
CY 2.000 $750.000 $3,100.000 $3,000.000
RIPRAP (STONE COMMON)(DRY)(8 IN)
CY 11.000 $190.000 $600.000 $400.000
RIPRAP (MOW STRIP)(4 IN)
CY 97.000 $650.000 $920.000 $750.000
RAIL (TY T551)
LF 1,838.000 $125.000 $135.000 $150.000
RAIL (TY T80PP)
LF 625.000 $350.000 $332.000 $190.000
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 318.000 $220.000 $239.000 $240.000
RC PIPE (CL III)(18 IN)
LF 2,363.000 $115.000 $60.000 $80.000
RC PIPE (CL III)(24 IN)
LF 1,291.000 $115.000 $80.000 $100.000
RC PIPE (CL III)(36 IN)
LF 1,772.000 $225.000 $142.000 $160.000
RC PIPE (CL V)(18 IN)
LF 55.000 $185.000 $108.000 $110.000
RC PIPE (CL V)(24 IN)
LF 63.000 $215.000 $145.000 $150.000
MANH (COMPL)(PRM)(60IN)
EA 1.000 $7,000.000 $9,100.000 $13,500.000
INLET(COMPL)(PAZD)(FG)(5FTX5FT-3FTX3FT)
EA 1.000 $12,000.000 $9,800.000 $12,500.000
HEADWALL (CH - PW - S) (DIA= 24 IN)
EA 1.000 $14,000.000 $10,000.000 $10,500.000
SET (TY II) (18 IN) (RCP) (2: 1) (C)
EA 1.000 $1,500.000 $2,600.000 $3,000.000
SET (TY II) (18 IN) (RCP) (4: 1) (C)
EA 1.000 $1,115.000 $2,600.000 $1,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 8.000 $1,400.000 $2,600.000 $1,200.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 44.000 $1,550.000 $2,600.000 $1,200.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 2.000 $1,700.000 $2,700.000 $2,000.000
SET (TY II) (24 IN) (RCP) (6: 1) (C)
EA 11.000 $2,700.000 $2,900.000 $2,000.000
SET (TY II) (36 IN) (RCP) (3: 1) (C)
EA 3.000 $4,400.000 $4,400.000 $4,000.000
SET (TY II) (36 IN) (RCP) (6: 1) (C)
EA 18.000 $4,500.000 $5,803.000 $5,200.000
REMOV STR (INLET)
EA 1.000 $1,300.000 $1,000.000 $2,750.000
REMOV STR (SET)
EA 58.000 $440.000 $700.000 $700.000
REMOV STR (PIPE)
LF 1,677.000 $20.000 $24.000 $27.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 3.000 $150,000.000 $74,000.000 $250,000.000
REMOV STR (SMALL FENCE)
LF 50.000 $14.000 $20.000 $65.000
MOBILIZATION
LS 1.000 $3,112,189.640 $3,778,928.870 $4,000,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 35.000 $5,000.000 $11,500.000 $20,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 430.000 $32.000 $30.000 $55.000
ROCK FILTER DAMS (REMOVE)
LF 430.000 $8.000 $11.000 $19.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 1,332.000 $21.000 $30.000 $52.000
CONSTRUCTION EXITS (REMOVE)
SY 1,332.000 $5.700 $11.000 $15.000
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
CY 4,500.000 $30.000 $14.000 $40.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 600.000 $70.000 $270.000 $150.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 24,764.000 $2.900 $3.500 $4.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 24,764.000 $0.650 $1.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 300.000 $10.400 $4.000 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 300.000 $4.600 $1.000 $3.000
TRACKHOE WORK (EROSION & SEDMT CONT)
HR 300.000 $150.000 $300.000 $200.000
CONSTRUCTING DETOURS
SY 4,175.000 $100.000 $214.000 $195.000
ONE-WAY TRAF CONT (PORT TRAF SIG)
MO 3.000 $15,000.000 $3,700.000 $15,000.000
PORT CTB (FUR & INST)(F-SHAPE)(TY 1)
LF 6,210.000 $45.000 $66.000 $95.000
PORT CTB (FUR & INST)(LOW PROF)(TY 1)
LF 5,060.000 $40.000 $110.000 $95.000
PORT CTB (FUR & INST)(LOW PROF)(TY 2)
LF 280.000 $80.000 $105.000 $100.000
PORT CTB (MOVE)(LOW PROF)(TY 1)
LF 4,480.000 $30.000 $8.000 $9.000
PORT CTB (MOVE)(LOW PROF)(TY 2)
LF 300.000 $30.000 $9.000 $9.000
PORT CTB (STKPL)(F-SHAPE)(TY 1)
LF 6,210.000 $20.000 $20.000 $18.000
PORT CTB (STKPL)(LOW PROF)(TY 1)
LF 5,060.000 $20.000 $14.000 $16.000
PORT CTB (STKPL)(LOW PROF)(TY 2)
LF 280.000 $20.000 $14.000 $16.000
DRIVEWAYS (CONC)
SY 1,930.000 $110.000 $95.000 $135.000
DRIVEWAYS (ACP)
SY 5,240.000 $50.000 $170.000 $95.000
MTL W-BEAM GD FEN (STEEL POST)
LF 1,445.000 $35.000 $36.000 $38.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 12.000 $2,350.000 $2,800.000 $2,420.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 3.000 $1,400.000 $3,500.000 $1,650.000
REMOVE METAL BEAM GUARD FENCE
LF 1,497.000 $3.000 $3.500 $15.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $275.000 $256.000 $220.000
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $175.000 $96.000 $220.000
GUARDRAIL END TREATMENT (INSTALL)
EA 9.000 $3,250.000 $4,100.000 $3,330.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $175.000 $500.000 $220.000
CRASH CUSH ATTEN (REMOVE)
EA 6.000 $1,200.000 $2,000.000 $1,100.000
CRASH CUSH ATTEN (INSTL)(L)(N)(70)
EA 6.000 $30,000.000 $28,000.000 $29,000.000
MAILBOX INSTALL-S (TWG-POST) TY 1
EA 6.000 $350.000 $320.000 $550.000
REMOVE RD IL ASM (TRANS-BASE)
EA 4.000 $865.000 $1,400.000 $1,585.000
IN RD IL (TY SA) 40T-8 (250W EQ) LED
EA 6.000 $4,400.000 $6,500.000 $7,700.000
CONDT (PVC) (SCH 40) (2")
LF 1,815.000 $16.000 $12.000 $13.000
CONDT (PVC) (SCH 40) (2") (BORE)
LF 70.000 $31.000 $32.000 $33.000
CONDT (PVC) (SCH 80) (2")
LF 1,670.000 $20.000 $13.000 $14.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 477.000 $30.000 $34.000 $36.000
CONDT (RM) (2")
LF 60.000 $42.000 $50.000 $52.000
ELEC CONDR (NO.8) BARE
LF 4,092.000 $2.000 $3.500 $4.000
ELEC CONDR (NO.8) INSULATED
LF 7,389.000 $2.000 $3.500 $4.000
ELEC CONDR (NO.6) INSULATED
LF 768.000 $3.000 $4.000 $4.500
ELEC CONDR (NO.4) BARE
LF 40.000 $2.850 $5.000 $5.000
ELEC CONDR (NO.4) INSULATED
LF 240.000 $3.500 $5.000 $5.000
GROUND BOX TY A (122311)W/APRON
EA 12.000 $1,500.000 $1,000.000 $1,000.000
GROUND BOX TY D (162922)W/APRON
EA 8.000 $1,535.000 $1,000.000 $1,100.000
REMOVE GROUND BOX
EA 3.000 $375.000 $500.000 $500.000
ELC SRV TY T 120/240 000(NS)GS(L)SP(U)
EA 1.000 $11,000.000 $4,000.000 $4,500.000
ELC SRV TY T 120/240 000(NS)GS(L)TP(O)
EA 1.000 $3,530.000 $4,000.000 $4,500.000
ALUMINUM SIGNS (TY G)
SF 143.000 $29.000 $36.000 $50.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 59.000 $746.000 $600.000 $1,000.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 14.000 $945.000 $850.000 $1,100.000
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
EA 7.000 $1,126.000 $1,000.000 $1,000.000
IN SM RD SN SUP&AM TYS80(1)SA(U-1EXT)
EA 3.000 $1,197.000 $1,100.000 $1,300.000
IN SM RD SN SUP&AM TYS80(1)SA(U-2EXT)
EA 5.000 $1,350.000 $1,200.000 $1,400.000
IN BRIDGE MNT CLEARANCE SGN ASSM(TY N)
EA 6.000 $1,916.000 $2,500.000 $1,700.000
REMOVE SM RD SN SUP&AM
EA 90.000 $102.000 $125.000 $120.000
REMOVE BRDG MNT CLEARANCE SIGN ASSM
EA 6.000 $438.000 $1,200.000 $600.000
INSTALL LRSS (STRUCT STEEL)
LB 231.000 $9.000 $7.000 $11.000
REMOVE LRSA
EA 1.000 $1,269.000 $1,500.000 $2,000.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 13,875.000 $1.000 $0.550 $3.000
WK ZN PAV MRK NON-REMOV (W)8"(SLD)
LF 895.000 $2.000 $0.750 $6.000
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 869.000 $4.000 $4.500 $6.000
WK ZN PAV MRK NON-REMOV(W)36"(YLD TRI)
EA 33.000 $20.000 $28.000 $90.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 42,520.000 $1.000 $0.500 $3.000
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 357.000 $2.000 $1.300 $3.000
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 589.000 $7.000 $7.500 $8.000
REFL PAV MRK TY I (W)(ARROW)(100MIL)
EA 2.000 $179.000 $165.000 $180.000
REFL PAV MRK TY I (W)(WORD)(100MIL)
EA 2.000 $211.000 $185.000 $250.000
REF PAV MRK TY I(W)36"(YLD TRI)(100MIL)
EA 8.000 $54.000 $47.000 $150.000
RE PM W/RET REQ TY I (W)6"(SLD)(100MIL)
LF 36,101.000 $1.000 $1.000 $1.200
RE PM W/RET REQ TY I (Y)6"(BRK)(100MIL)
LF 30.000 $2.000 $1.000 $3.500
RE PM W/RET REQ TY I (Y)6"(SLD)(100MIL)
LF 36,382.000 $1.000 $1.000 $1.200
REFL PAV MRKR TY I-C
EA 16.000 $6.000 $7.000 $7.000
REFL PAV MRKR TY II-A-A
EA 1,685.000 $5.000 $5.000 $5.000
INSTALL RDSD FLASH BEACON ASSEMBLY
EA 4.000 $6,815.000 $7,500.000 $10,000.000
SP MIXES SP-C SAC-B PG64-22
TON 8,675.000 $105.000 $200.000 $190.000
SP MIXES SP-C SAC-B PG70-22
TON 9,003.000 $105.000 $180.000 $200.000
TACK COAT
GAL 8,739.000 $3.100 $3.500 $6.000
UNDERSEAL COURSE
GAL 597.000 $5.000 $7.000 $10.000
GATE (ADJUST)
EA 1.000 $15,000.000 $2,750.000 $3,000.000
GATE (INSTALL)
EA 1.000 $30,000.000 $5,400.000 $6,000.000
REMOVE ROADWAY ILLUM ASSEMBLY (HPS)
EA 2.000 $330.000 $1,500.000 $1,600.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 168.000 $145.000 $120.000 $200.000
RELOCATE CCTV FIELD EQUIPMENT
EA 2.000 $3,000.000 $6,000.000 $6,600.000
ITS POLE (50 FT)(90 MPH)
EA 1.000 $20,000.000 $27,000.000 $26,000.000
ITS POLE (50 FT)(REL)
EA 1.000 $19,000.000 $12,000.000 $12,000.000
ITS POLE (50 FT)(REM)
EA 1.000 $5,000.000 $6,000.000 $6,000.000
ITS POLE MNT CAB (TY 2)(CONF 2)(REL)
EA 2.000 $5,000.000 $8,800.000 $9,000.000
TMA (STATIONARY)
DAY 402.000 $510.000 $260.000 $350.000
Totals: $31,709,756.840 $39,144,959.930 $41,184,739.200