PREPARING ROW
|
STA
|
19.990
|
$1,500.000
|
$3,000.000
|
$7,000.000
|
$2,770.000
|
$2,500.000
|
$5,000.000
|
|
|
REMOVING CONC (DRIVEWAYS)
|
SY
|
55.000
|
$20.000
|
$75.000
|
$50.000
|
$22.000
|
$25.000
|
$35.000
|
|
|
EXCAVATION (ROADWAY)
|
CY
|
9,828.600
|
$10.000
|
$7.500
|
$11.250
|
$6.500
|
$10.000
|
$15.000
|
|
|
EMBANKMENT (FINAL)(ORD COMP)(TY C)
|
CY
|
10,065.000
|
$15.000
|
$5.500
|
$15.000
|
$13.000
|
$15.000
|
$20.000
|
|
|
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
|
CY
|
46.000
|
$20.000
|
$50.000
|
$65.000
|
$45.000
|
$30.000
|
$20.000
|
|
|
BACKFILL (TY A)
|
STA
|
131.890
|
$225.000
|
$295.000
|
$250.000
|
$273.000
|
$325.000
|
$325.000
|
|
|
BACKFILL (TY A)
|
LF
|
17,646.000
|
$2.250
|
$3.500
|
$1.500
|
$2.730
|
$2.000
|
$2.000
|
|
|
BLADING
|
STA
|
6.000
|
$200.000
|
$250.000
|
$600.000
|
$1,000.000
|
$400.000
|
$500.000
|
|
|
FURNISHING AND PLACING TOPSOIL (4")
|
SY
|
53,762.000
|
$1.500
|
$0.500
|
$1.750
|
$1.350
|
$2.500
|
$2.000
|
|
|
BROADCAST SEED (PERM) (RURAL) (SANDY)
|
SY
|
46,448.000
|
$0.150
|
$0.160
|
$0.130
|
$0.068
|
$0.100
|
$0.090
|
|
|
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
|
SY
|
92,895.000
|
$0.800
|
$0.680
|
$0.850
|
$0.633
|
$0.750
|
$0.750
|
|
|
BONDED FBR MTRX SEED (TEMP)(WARM)
|
SY
|
46,448.000
|
$0.800
|
$0.660
|
$0.850
|
$0.568
|
$0.650
|
$0.660
|
|
|
BONDED FBR MTRX SEED (TEMP)(COOL)
|
SY
|
46,448.000
|
$0.800
|
$0.660
|
$0.850
|
$0.547
|
$0.650
|
$0.640
|
|
|
VEGETATIVE WATERING
|
MG
|
2,044.000
|
$12.000
|
$5.000
|
$12.000
|
$0.010
|
$15.000
|
$5.000
|
|
|
FL BS (CMP IN PLACE)(TY A GR 1-2)(8")
|
SY
|
24,200.000
|
$18.000
|
$17.000
|
$14.750
|
$23.400
|
$20.000
|
$21.000
|
|
|
LIME (HYDRATED LIME (DRY))
|
TON
|
188.000
|
$180.000
|
$200.000
|
$270.000
|
$270.000
|
$245.000
|
$235.000
|
|
|
LIME TRT (EXST MATL)(8")
|
SY
|
12,540.000
|
$4.000
|
$4.000
|
$2.250
|
$4.000
|
$5.500
|
$5.000
|
|
|
CEMENT
|
TON
|
213.000
|
$175.000
|
$205.000
|
$245.000
|
$263.000
|
$215.000
|
$225.000
|
|
|
CEMENT TREAT(EXIST MATL)(8")
|
SY
|
12,540.000
|
$4.000
|
$6.000
|
$2.250
|
$4.000
|
$3.500
|
$3.000
|
|
|
PRIME COAT (MC-30)
|
GAL
|
6,996.000
|
$4.000
|
$6.000
|
$5.250
|
$6.350
|
$5.000
|
$6.000
|
|
|
EMULS ASPH (EROSN CONT)(CSS-1)
|
GAL
|
1,461.000
|
$4.300
|
$8.000
|
$5.000
|
$8.350
|
$4.500
|
$6.000
|
|
|
ASPH (AC-20XP, AC-10-2TR, OR AC-20-5TR)
|
GAL
|
94,600.000
|
$4.000
|
$4.500
|
$5.250
|
$7.220
|
$4.750
|
$4.500
|
|
|
AGGR (TY-PD GR-3 OR TY-PL GR-3)
|
CY
|
2,252.000
|
$125.000
|
$160.000
|
$135.000
|
$165.000
|
$145.000
|
$110.000
|
|
|
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
|
SY
|
2,000.000
|
$55.000
|
$90.000
|
$55.000
|
$117.000
|
$60.000
|
$60.000
|
|
|
PLANE ASPH CONC PAV(0" TO 2")
|
SY
|
5,868.000
|
$2.500
|
$4.000
|
$2.750
|
$3.580
|
$3.750
|
$3.750
|
|
|
PLANE ASPH CONC PAV (1.5")
|
SY
|
2,886.000
|
$2.500
|
$4.000
|
$3.000
|
$3.600
|
$4.000
|
$3.500
|
|
|
PLANE ASPH CONC PAV (2")
|
SY
|
10,242.000
|
$2.500
|
$2.650
|
$3.000
|
$3.250
|
$3.500
|
$2.900
|
|
|
PLANE ASPH CONC PAV (6")
|
SY
|
12,170.000
|
$4.500
|
$3.350
|
$4.500
|
$5.500
|
$7.000
|
$7.000
|
|
|
PLANE ASPH CONC PAV (0" TO 1 1/2")
|
SY
|
13,172.000
|
$2.500
|
$2.650
|
$3.000
|
$2.650
|
$3.000
|
$2.150
|
|
|
TEMPORARY SPL SHORING
|
SF
|
120.000
|
$25.000
|
$79.000
|
$100.000
|
$15.000
|
$60.000
|
$70.000
|
|
|
CL C CONC (COLLAR)
|
EA
|
12.000
|
$1,000.000
|
$499.000
|
$1,650.000
|
$475.000
|
$800.000
|
$2,000.000
|
|
|
CL E CONC (SEAL SLAB)(NON-REINF)
|
CY
|
5.400
|
$425.000
|
$447.000
|
$570.000
|
$425.000
|
$840.000
|
$600.000
|
|
|
RIPRAP (CONC) (CL B) (4")
|
CY
|
16.000
|
$500.000
|
$499.000
|
$585.000
|
$475.000
|
$700.000
|
$750.000
|
|
|
RIPRAP (STONE COMMON)(DRY)(18 IN)
|
CY
|
153.000
|
$160.000
|
$237.000
|
$175.000
|
$172.000
|
$200.000
|
$170.000
|
|
|
RIPRAP (MOW STRIP)(4 IN)
|
CY
|
171.000
|
$500.000
|
$525.000
|
$555.000
|
$500.000
|
$625.000
|
$550.000
|
|
|
CLEANING AND SEALING JOINTS (CL 3)
|
LF
|
572.000
|
$35.000
|
$30.000
|
$35.000
|
$36.000
|
$25.000
|
$33.000
|
|
|
CONC BOX CULV (4 FT X 3 FT)(EXTEND)
|
LF
|
18.000
|
$500.000
|
$685.000
|
$1,100.000
|
$650.000
|
$670.000
|
$1,000.000
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
8.000
|
$550.000
|
$710.000
|
$1,350.000
|
$675.000
|
$930.000
|
$1,000.000
|
|
|
CONC BOX CULV (7 FT X 5 FT)(EXTEND)
|
LF
|
11.000
|
$700.000
|
$790.000
|
$1,450.000
|
$750.000
|
$835.000
|
$1,000.000
|
|
|
RC PIPE (CL III)(18 IN)
|
LF
|
936.000
|
$50.000
|
$45.500
|
$49.000
|
$43.000
|
$50.000
|
$65.000
|
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
92.000
|
$70.000
|
$73.500
|
$68.000
|
$70.000
|
$85.000
|
$90.000
|
|
|
RC PIPE (CL III)(30 IN)
|
LF
|
36.000
|
$90.000
|
$94.500
|
$120.000
|
$90.000
|
$95.000
|
$115.000
|
|
|
RC PIPE (CL III)(36 IN)
|
LF
|
18.000
|
$110.000
|
$126.000
|
$200.000
|
$120.000
|
$130.000
|
$150.000
|
|
|
WINGWALL (PW - 1) (HW=7 FT)
|
EA
|
3.000
|
$15,000.000
|
$22,050.000
|
$15,500.000
|
$21,000.000
|
$18,000.000
|
$24,000.000
|
|
|
SET (TY I)(S= 7 FT)(HW= 6 FT)(3:1) (C)
|
EA
|
1.000
|
$10,000.000
|
$10,500.000
|
$4,000.000
|
$10,000.000
|
$15,000.000
|
$10,000.000
|
|
|
SET (TY II) (18 IN) (RCP) (6: 1) (P)
|
EA
|
50.000
|
$650.000
|
$682.500
|
$850.000
|
$650.000
|
$900.000
|
$750.000
|
|
|
SET (TY II) (24 IN) (RCP) (3: 1) (C)
|
EA
|
4.000
|
$800.000
|
$761.250
|
$1,050.000
|
$725.000
|
$900.000
|
$850.000
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$850.000
|
$840.000
|
$1,600.000
|
$800.000
|
$1,000.000
|
$950.000
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
2.000
|
$900.000
|
$1,155.000
|
$1,800.000
|
$1,100.000
|
$1,200.000
|
$1,200.000
|
|
|
SET (TY II) (30 IN) (RCP) (3: 1) (C)
|
EA
|
1.000
|
$1,400.000
|
$1,260.000
|
$2,800.000
|
$1,200.000
|
$1,250.000
|
$1,800.000
|
|
|
SET (TY II) (30 IN) (RCP) (4: 1) (C)
|
EA
|
2.000
|
$1,600.000
|
$1,470.000
|
$2,000.000
|
$1,400.000
|
$1,400.000
|
$2,000.000
|
|
|
SET (TY II) (36 IN) (RCP) (3: 1) (C)
|
EA
|
3.000
|
$2,000.000
|
$2,940.000
|
$2,500.000
|
$2,800.000
|
$2,000.000
|
$2,600.000
|
|
|
CLEAN EXIST CULVERTS
|
EA
|
6.000
|
$1,500.000
|
$1,050.000
|
$4,600.000
|
$1,000.000
|
$5,000.000
|
$3,000.000
|
|
|
REMOV STR (PIPE)
|
EA
|
26.000
|
$400.000
|
$262.500
|
$530.000
|
$250.000
|
$400.000
|
$450.000
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$826,500.000
|
$550,000.000
|
$810,000.000
|
$659,000.000
|
$820,000.000
|
$650,000.000
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
16.000
|
$5,000.000
|
$7,000.000
|
$3,500.000
|
$7,442.000
|
$2,000.000
|
$10,000.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 1)
|
LF
|
210.000
|
$25.000
|
$35.000
|
$30.000
|
$27.000
|
$30.000
|
$30.000
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
1,200.000
|
$35.000
|
$38.000
|
$35.000
|
$31.000
|
$35.000
|
$35.000
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
1,410.000
|
$10.000
|
$4.500
|
$9.000
|
$8.000
|
$9.000
|
$9.000
|
|
|
EARTHWORK (EROSN & SEDMT CONT, IN VEH)
|
CY
|
1,000.000
|
$20.000
|
$20.000
|
$18.500
|
$25.000
|
$9.000
|
$35.000
|
|
|
BACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
100.000
|
$75.000
|
$70.000
|
$185.000
|
$35.000
|
$55.000
|
$85.000
|
|
|
TEMP SEDMT CONT FENCE (INSTALL)
|
LF
|
10,000.000
|
$2.500
|
$3.300
|
$3.100
|
$2.800
|
$3.000
|
$3.150
|
|
|
TEMP SEDMT CONT FENCE (REMOVE)
|
LF
|
10,000.000
|
$0.800
|
$1.050
|
$0.700
|
$0.600
|
$0.600
|
$0.650
|
|
|
TRACKHOE WORK (EROSION & SEDMT CONT)
|
HR
|
100.000
|
$110.000
|
$100.000
|
$250.000
|
$35.000
|
$90.000
|
$100.000
|
|
|
INTERSECTIONS (ACP)
|
SY
|
300.000
|
$40.000
|
$70.000
|
$58.000
|
$80.000
|
$68.000
|
$55.000
|
|
|
DRIVEWAYS (ACP)
|
SY
|
2,074.000
|
$35.000
|
$41.000
|
$40.000
|
$55.000
|
$45.000
|
$40.000
|
|
|
DRIVEWAYS (CONC) (HES)
|
SY
|
46.000
|
$100.000
|
$105.000
|
$95.000
|
$110.000
|
$116.000
|
$135.000
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
67,474.000
|
$0.200
|
$0.150
|
$0.120
|
$0.170
|
$0.300
|
$0.200
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
33,237.000
|
$0.200
|
$0.200
|
$0.160
|
$0.170
|
$0.300
|
$0.200
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
1,388.000
|
$22.000
|
$22.750
|
$28.000
|
$21.500
|
$30.000
|
$28.000
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$1,600.000
|
$1,785.000
|
$1,925.000
|
$2,000.000
|
$2,000.000
|
$1,950.000
|
|
|
SHORT RADIUS
|
LF
|
25.000
|
$35.000
|
$26.250
|
$71.500
|
$25.000
|
$75.000
|
$75.000
|
|
|
DOWNSTREAM ANCHOR TERMINAL SECTION
|
EA
|
1.000
|
$1,200.000
|
$1,155.000
|
$1,520.000
|
$1,100.000
|
$1,600.000
|
$1,550.000
|
|
|
MTL W - BEAM GD FEN (LOW FILL CULVERT)
|
LF
|
87.500
|
$70.000
|
$73.500
|
$96.500
|
$70.000
|
$105.000
|
$100.000
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
900.000
|
$3.000
|
$2.100
|
$6.000
|
$2.000
|
$3.000
|
$3.000
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
12.000
|
$310.000
|
$236.250
|
$165.000
|
$225.000
|
$175.000
|
$170.000
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
15.000
|
$2,600.000
|
$2,887.500
|
$3,330.000
|
$2,750.000
|
$3,500.000
|
$3,350.000
|
|
|
GUARDRAIL END TREATMENT (REMOVE)
|
EA
|
12.000
|
$300.000
|
$236.250
|
$220.000
|
$225.000
|
$230.000
|
$225.000
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
13.000
|
$250.000
|
$294.000
|
$360.000
|
$225.000
|
$380.000
|
$315.000
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
3.000
|
$325.000
|
$315.000
|
$400.000
|
$270.000
|
$425.000
|
$335.000
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
2.000
|
$500.000
|
$577.500
|
$765.000
|
$775.000
|
$800.000
|
$610.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
23.000
|
$625.000
|
$686.000
|
$900.000
|
$970.000
|
$950.000
|
$725.000
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(U)
|
EA
|
2.000
|
$700.000
|
$882.000
|
$1,085.000
|
$1,240.000
|
$1,150.000
|
$925.000
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(U)
|
EA
|
3.000
|
$1,020.000
|
$1,029.000
|
$1,600.000
|
$2,000.000
|
$1,700.000
|
$1,100.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(P)
|
EA
|
42.000
|
$380.000
|
$451.500
|
$485.000
|
$385.000
|
$515.000
|
$475.000
|
|
|
IN SM RD SN SUP&AM TYTWT(1)WS(T)
|
EA
|
14.000
|
$500.000
|
$456.750
|
$630.000
|
$590.000
|
$665.000
|
$485.000
|
|
|
RELOCATE SM RD SN SUP&AM TY TWT
|
EA
|
3.000
|
$350.000
|
$409.500
|
$395.000
|
$2,000.000
|
$415.000
|
$435.000
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
79.000
|
$85.000
|
$105.000
|
$103.000
|
$115.000
|
$110.000
|
$110.000
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
24.000
|
$30.000
|
$19.000
|
$16.500
|
$18.000
|
$18.000
|
$20.000
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
54.000
|
$30.000
|
$21.000
|
$33.000
|
$20.000
|
$35.000
|
$35.000
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
58.000
|
$100.000
|
$147.000
|
$60.500
|
$34.000
|
$65.000
|
$65.000
|
|
|
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
|
LF
|
87,780.000
|
$0.200
|
$0.190
|
$0.170
|
$0.180
|
$0.200
|
$0.170
|
|
|
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
|
LF
|
40.000
|
$3.000
|
$5.250
|
$5.500
|
$5.000
|
$5.850
|
$5.500
|
|
|
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
|
LF
|
79,240.000
|
$0.200
|
$0.190
|
$0.170
|
$0.180
|
$0.200
|
$0.170
|
|
|
WK ZN PAV MRK REMOV (W)24"(SLD)
|
LF
|
40.000
|
$10.000
|
$5.250
|
$11.000
|
$5.000
|
$5.850
|
$11.000
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
3,534.000
|
$1.000
|
$1.100
|
$1.350
|
$3.000
|
$1.150
|
$2.000
|
|
|
WK ZN PAV MRK SHT TERM RMV (Y)(4")
|
LF
|
15,903.000
|
$0.400
|
$1.100
|
$1.350
|
$1.650
|
$1.450
|
$1.750
|
|
REFL PAV MRK TY I (W)4"(DOT)(100MIL)
|
LF
|
295.000
|
$1.000
|
$1.050
|
$1.100
|
$1.000
|
$1.150
|
$1.100
|
|
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
|
LF
|
888.000
|
$0.900
|
$1.000
|
$1.100
|
$0.950
|
$1.100
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(BRK)(100MIL)
|
LF
|
3,728.000
|
$0.350
|
$0.420
|
$1.320
|
$0.400
|
$0.500
|
$1.100
|
|
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
|
LF
|
68,494.000
|
$0.300
|
$0.390
|
$0.560
|
$0.370
|
$0.450
|
$0.550
|
|
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
|
LF
|
2,635.000
|
$0.350
|
$0.420
|
$1.100
|
$0.400
|
$0.450
|
$1.100
|
|
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
|
LF
|
53,824.000
|
$0.300
|
$0.390
|
$0.560
|
$0.370
|
$0.450
|
$0.550
|
|
|
REF PROF PAV MRK TY I(W)4"(SLD)(100MIL)
|
LF
|
1,900.000
|
$0.750
|
$3.150
|
$5.500
|
$3.000
|
$3.500
|
$5.500
|
|
|
REF PROF PAV MRK TY I(Y)4"(BRK)(100MIL)
|
LF
|
768.000
|
$0.750
|
$3.150
|
$5.500
|
$3.000
|
$3.500
|
$5.500
|
|
|
REF PROF PAV MRK TY I(Y)4"(SLD)(100MIL)
|
LF
|
300.000
|
$0.750
|
$3.150
|
$5.500
|
$3.000
|
$3.500
|
$5.500
|
|
PREFAB PAV MRK TY C (W) (24") (SLD)
|
LF
|
230.000
|
$12.000
|
$15.750
|
$13.550
|
$15.000
|
$18.000
|
$13.500
|
|
PREFAB PAV MRK TY C (W) (LNDP ARROW)
|
EA
|
4.000
|
$400.000
|
$472.500
|
$358.000
|
$450.000
|
$525.000
|
$360.000
|
|
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
|
EA
|
10.000
|
$35.000
|
$36.750
|
$71.500
|
$35.000
|
$41.000
|
$72.000
|
|
REFL PAV MRKR TY I-A
|
EA
|
66.000
|
$3.000
|
$4.460
|
$4.400
|
$4.250
|
$5.000
|
$4.500
|
|
REFL PAV MRKR TY I-C
|
EA
|
187.000
|
$3.000
|
$4.460
|
$4.400
|
$4.250
|
$5.000
|
$4.500
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
827.000
|
$2.800
|
$4.460
|
$3.850
|
$4.250
|
$5.000
|
$3.850
|
|
|
D-GR HMA TY-D PG64-22
|
TON
|
101.000
|
$180.000
|
$255.000
|
$135.000
|
$173.250
|
$207.000
|
$185.000
|
|
|
SP MIXES SP-B PG64-22
|
TON
|
701.000
|
$150.000
|
$145.000
|
$120.000
|
$135.500
|
$142.000
|
$136.000
|
|
|
SP MIXES SP-C PG64-22
|
TON
|
11,669.000
|
$105.000
|
$131.000
|
$122.000
|
$135.500
|
$130.000
|
$143.000
|
|
|
SP MIXES SP-D PG64-22 (LEVEL-UP)
|
TON
|
3,307.000
|
$150.000
|
$150.000
|
$140.000
|
$130.250
|
$134.000
|
$155.000
|
|
|
SP MIXES SP-D PG70-22
|
TON
|
216.000
|
$150.000
|
$181.000
|
$133.000
|
$177.500
|
$167.000
|
$175.000
|
|
|
TACK COAT
|
GAL
|
6,882.000
|
$2.500
|
$4.000
|
$4.700
|
$3.000
|
$3.500
|
$4.500
|
|
|
PFC-C (PG76 MIX) SAC-A
|
TON
|
14,231.000
|
$175.000
|
$173.000
|
$157.000
|
$156.000
|
$209.550
|
$210.000
|
|
|
TACK COAT
|
GAL
|
18,975.000
|
$2.500
|
$4.000
|
$4.500
|
$3.000
|
$3.500
|
$4.500
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
DAY
|
28.000
|
$200.000
|
$800.000
|
$100.000
|
$200.000
|
$85.000
|
$200.000
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$10,000.000
|
$20,000.000
|
$19,000.000
|
$15,000.000
|
$6,000.000
|
$20,000.000
|
|
|
PREFORMED CENTERLINE RUMBLE STRIP
|
LF
|
488.000
|
$8.000
|
$10.500
|
$13.000
|
$10.000
|
$11.500
|
$13.000
|
|
|
TMA (STATIONARY)
|
DAY
|
220.000
|
$150.000
|
$250.000
|
$150.000
|
$155.000
|
$100.000
|
$225.000
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
30.000
|
$150.000
|
$500.000
|
$200.000
|
$135.000
|
$150.000
|
$250.000
|
|
Totals: |
$8,429,563.200
|
$8,769,308.820
|
$8,793,990.130
|
$9,101,349.579
|
$9,671,130.900
|
$9,978,572.120
|