Show Job Controls
Bid Cobra

VAL VERDE US0277 (6469-90-001)

Items: 63

County: VAL VERDE
Length: N/A
Highway: US0277
District: LAREDO
Control Number: 6469-90-001
DBE Goal: 0.0%
Project: RMC - 646990001
Guaranty: N/A
Time: 365 CALENDAR DAYS
Engineer's Estimate: $294,967.40
Date: 07/25/2024 (1 year ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
VANESSA ROSALES
BRANDON BAXTER
CHARLES FITE
FRANCIS A SCHELL
ARNULFO LONGORIA
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$294,967.40
$252,853.00
Over/Under Est: -14.28% -$42,114.40
Over/Under Est: -3.61% -$10,660.90
Amt Left: 12.44% $31,453.50
Over/Under Est: 3.59% $10,580.50
Amt Left: 20.84% $52,694.90
Delta: -7.47% -$21,241.40

Bid Items & Bid Tabulations

63 Total 0 of 63
VAL VERDE  |  US0277  |  LAREDO  |  6469-90-001  |  07/25/2024  |  $294,967.40  |  RMC - 646990001  |  METAL BEAM GUARD FENCE REPAIR  |  365 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ABOVE ALL CONTRACTING LLC
BK FIELD OPERATIONS LLC
ROSS SA ENTERPRISE LLC
REMOVING CONC (MISC)
SY 6.000 $50.000 $100.000 $35.000 $29.250
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 10.000 $50.000 $100.000 $75.000 $75.000
RIPRAP (MOW STRIP)(4 IN)
CY 5.000 $500.000 $600.000 $600.000 $320.000
RETROFIT RAIL (TY PR11)
LF 25.000 $200.000 $300.000 $210.000 $198.000
RETROFIT RAIL (TY PR22)
LF 10.000 $200.000 $200.000 $210.000 $150.000
MOBILIZATION (CALLOUT 1)
EA 3.000 $1.000 $1.000 $1.000 $1.000
MOBILIZATION (CALLOUT 2)
EA 5.000 $1.000 $1.000 $1.000 $3,200.000
MOBILIZATION (CALLOUT 3)
EA 5.000 $1.000 $1.000 $1.000 $1.000
MOBILIZATION (CALLOUT 4)
EA 3.000 $1.000 $1.000 $1.000 $1.000
MOBILIZATION (EMERGENCY)
EA 2.000 $500.000 $1.000 $750.000 $500.000
ONE-WAY TRAF CONT (PILOT CAR)
HR 10.000 $100.000 $100.000 $80.000 $75.000
MTL W-BEAM GD FEN (TIM POST)
LF 250.000 $30.000 $20.000 $35.000 $15.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 4.000 $2,200.000 $1,500.000 $2,000.000 $800.000
MTL BM GD FEN (LONG SPAN SYSTEM)
LF 50.000 $40.000 $30.000 $50.000 $20.000
MTL BM GD FEN TRANS (31"-28")
EA 8.000 $400.000 $500.000 $500.000 $425.000
REMOVE METAL BEAM GUARD FENCE
LF 100.000 $10.000 $5.000 $0.100 $8.000
REMOVE TERMINAL ANCHOR SECTION
EA 4.000 $300.000 $250.000 $150.000 $1.000
GDRAIL END TRT(INST)(WOOD POST)(TY III)
EA 2.000 $3,500.000 $3,000.000 $3,000.000 $3,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1
EA 15.000 $25.000 $25.000 $1.000 $1.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 30.000 $25.000 $25.000 $1.000 $1.000
INSTL DEL ASSM (D-SY)SZ (BRF)GF1
EA 15.000 $25.000 $25.000 $1.000 $1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 15.000 $25.000 $25.000 $20.000 $1.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 40.000 $25.000 $25.000 $20.000 $20.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 15.000 $25.000 $25.000 $20.000 $1.000
REPAIR RAIL ELEMENT (W - BEAM)
LF 2,100.000 $23.000 $25.000 $24.000 $1.000
REPAIR RAIL ELEMENT (THRIE - BEAM)
LF 30.000 $60.000 $50.000 $30.000 $1.000
REP RAIL ELMNT(THRIE-BM TRANS TO W -BM)
LF 6.000 $60.000 $50.000 $50.000 $46.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 100.000 $50.000 $40.000 $45.000 $2.000
RAISE RAIL ELEMENT
LF 120.000 $6.000 $5.000 $5.000 $4.870
REM / REPL TIMBER/STL POST W/O CONC FND
EA 170.000 $50.000 $25.000 $50.000 $41.000
REM / REPL TIMBER / STL POST W/CONC FND
EA 35.000 $75.000 $50.000 $50.000 $53.000
REALIGN POSTS
EA 70.000 $25.000 $20.000 $40.000 $32.000
INSTALL BLOCKOUT (TYPE SPECIFIED)
EA 25.000 $50.000 $10.000 $40.000 $20.000
REMOVE & REPLACE BLOCKOUT
EA 175.000 $30.000 $10.000 $20.000 $50.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 300.000 $30.000 $30.000 $45.000 $26.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 50.000 $100.000 $100.000 $80.000 $16.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 2.000 $100.000 $250.000 $60.000 $1.000
REMOVE GDRAIL END TRT / REPL WITH SGT
EA 23.000 $3,500.000 $3,500.000 $3,900.000 $3,100.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 12.000 $900.000 $900.000 $800.000 $950.000
REM & RESET SGT IMPACT HEAD
EA 5.000 $250.000 $200.000 $175.000 $1.000
REPLACE SGT CABLE ASSEMBLY
EA 12.000 $100.000 $100.000 $80.000 $1.000
REPLACE SGT CABLE ANCHOR
EA 12.000 $100.000 $100.000 $85.000 $1.000
REPLACE SGT STRUT
EA 12.000 $100.000 $100.000 $95.000 $1.000
REPLACE SGT OBJECT MARKER
EA 12.000 $50.000 $50.000 $55.000 $1.000
REPAIR STEEL POST WITH BASE PLATE
EA 2.000 $250.000 $300.000 $215.000 $135.000
REPAIR MTL BM GD FEN(LONG SPAN SYS)
LF 25.000 $40.000 $50.000 $38.000 $12.000
REPLACE POSTS (TL-4)
EA 35.000 $250.000 $185.000 $235.000 $5.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 2.000 $250.000 $300.000 $1,000.000 $50.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 2.000 $2,400.000 $2,000.000 $2,250.000 $525.000
REPLACE CABLE (TL-4)
LF 20.000 $10.000 $5.000 $4.000 $5.000
CHECK / RE-TENSION CABLE
EA 5.000 $350.000 $250.000 $750.000 $1.000
REPLACE POST HARDWARE (TL-3)
EA 5.000 $80.000 $100.000 $0.100 $40.000
POST AND CABLE FENCE (NEW INSTALLATION)
LF 20.000 $30.000 $30.000 $12.000 $15.000
POST AND CABLE FENCE (REPAIR)
LF 50.000 $15.000 $20.000 $10.000 $11.000
REPAIR (REACT)
EA 1.000 $4,000.000 $2,000.000 $3,200.000 $450.000
REPAIR (BEAT - SSCC)
EA 1.000 $5,000.000 $2,000.000 $4,750.000 $900.000
REPAIR (STL PIPE PEDESTRIAN RAIL - PR1)
LF 20.000 $250.000 $200.000 $210.000 $78.000
REP METAL POST W/ BASE PLATE(T101 RAIL)
EA 3.000 $250.000 $250.000 $400.000 $99.000
REPAIR (W-BEAM - T101 RAIL)
LF 50.000 $40.000 $30.000 $70.000 $16.000
REP METAL PST W/ BASE PLATE (TY T631)
EA 15.000 $200.000 $100.000 $190.000 $48.000
REP W BEAM (TY T631)
LF 50.000 $45.000 $40.000 $40.000 $22.000
CONCRETE RAIL REPAIR (IN-KIND)
LF 10.000 $100.000 $100.000 $110.000 $103.000
TMA (STATIONARY)
DAY 60.000 $332.440 $1.000 $1.000 $2,250.000
Totals: $294,967.400 $252,853.000 $284,306.500 $305,547.900