VAL VERDE US0090 (6388-94-001)

Items: 33

County: VAL VERDE
Length: N/A
Highway: US0090
District: LAREDO
Control Number: 6388-94-001
DBE Goal: N/A
Project: BPM - 638894001
Guaranty: N/A
Time: 94 W
Engineer's Estimate: $389,979.07
Date: 02/03/2022 (4 years ago)
Contract Number: N/A
Type: BRIDGE PREVENTATIVE MAINTENANCE
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Documents:
Bidders (3)
E
Engineer's Estimate
$389,979.07
Over/Under Est: 21.02% $81,971.53
Over/Under Est: 61.47% $239,735.73
Amt Left: 33.43% $157,764.20
Over/Under Est: 67.44% $262,991.93
Amt Left: 38.36% $181,020.40
Delta: -3.69% -$23,256.20

Bid Items & Bid Tabulations

33 Total 0 of 33
VAL VERDE  |  US0090  |  LAREDO  |  6388-94-001  |  02/03/2022  |  $389,979.07  |  BPM - 638894001  |  BRIDGE PREVENT MAINT  |  94 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
BOEN LANDSCAPING & IRRIGATION, LLC
SCR CIVIL CONSTRUCTION, LLC
AAD CONTRACTING INC.
PREPARING ROW
STA 5.000 $1,200.000 $1,500.000 $6,600.000 $2,500.000
PREPARING ROW(TREE)(5" TO 12" DIA)
EA 6.000 $220.000 $400.000 $500.000 $400.000
PREPARING ROW (TREE) (0" TO 6" DIA)
EA 25.000 $150.000 $150.000 $475.000 $150.000
REMOVING CONC (RIPRAP)
CY 7.000 $75.000 $350.000 $1,000.000 $200.000
SPEC EXCAV WORK (BACKHOE)
HR 16.000 $110.000 $200.000 $100.000 $100.000
FLOWABLE BACKFILL
CY 19.000 $450.000 $600.000 $800.000 $250.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 176.000 $150.000 $140.000 $245.000 $210.000
RIPRAP (CONC)(6 IN)
CY 7.000 $450.000 $1,200.000 $1,210.000 $800.000
RIPRAP (STONE COMMON)(DRY)(12 IN)
CY 8.000 $110.000 $430.000 $630.000 $250.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 19.000 $120.000 $550.000 $380.000 $250.000
CLEANING AND SEALING EXISTING JOINTS
LF 905.600 $16.000 $56.000 $33.000 $45.000
SPOT CLEAN & PAINT EXT STR(SPL PRT SYS)
LS 1.000 $55,000.000 $45,000.000 $129,000.000 $65,000.000
ANCHOR BOLTS
EA 2.000 $350.000 $6,000.000 $2,700.000 $1,500.000
GABION MATTRESSES (GALV)(12 IN)
SY 8.300 $80.000 $800.000 $500.000 $160.000
CLEAN EXIST CULVERTS
EA 2.000 $2,000.000 $8,000.000 $9,900.000 $25,000.000
RAISING EXIST STRUCT
LS 1.000 $100,000.000 $145,000.000 $91,000.000 $80,000.000
MOBILIZATION
LS 1.000 $41,783.470 $26,000.000 $62,900.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $4,000.000 $1,500.000 $10,200.000 $10,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 70.000 $62.000 $60.000 $145.000 $18.000
ROCK FILTER DAMS (REMOVE)
LF 70.000 $16.500 $60.000 $30.000 $9.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 78.000 $19.000 $50.000 $42.000 $18.000
CONSTRUCTION EXITS (REMOVE)
SY 78.000 $5.000 $50.000 $12.000 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 40.000 $2.500 $2.000 $15.000 $3.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 40.000 $2.750 $1.000 $12.000 $1.000
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 20.000 $6.000 $1.000 $15.000 $8.000
ONE-WAY TRAF CONT (FLAGGER CONT)
HR 262.000 $65.000 $1.000 $44.000 $70.000
CONCRETE POST REPAIR
EA 3.000 $450.000 $2,500.000 $1,005.000 $3,000.000
CONCRETE POST REPLACEMENT
EA 2.000 $1,700.000 $6,500.000 $1,800.000 $3,000.000
CNC CRACK REPAIR (DISCRETE)(INJECT)
LF 67.000 $100.000 $95.000 $60.000 $75.000
REP STL BRDG MEMB (ANCHOR BOLT NUT)
EA 2.000 $775.000 $4,500.000 $1,800.000 $1,000.000
REPLACE ELASTOMERIC BEARING PADS
EA 2.000 $15,000.000 $10,000.000 $8,000.000 $4,500.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $9,000.000 $4,500.000 $6,000.000 $8,000.000
TMA (STATIONARY)
DAY 50.000 $180.000 $50.000 $385.000 $150.000
Totals: $389,979.070 $471,950.600 $629,714.800 $652,971.000