Bid Cobra

UVALDE SH0055 (6411-75-001)

Items: 18

County: UVALDE
Length: N/A
Highway: SH0055
District: SAN ANTONIO
Control Number: 6411-75-001
DBE Goal: N/A
Project: BPM - 641175001
Guaranty: N/A
Time: 16 W
Engineer's Estimate: $111,697.08
Date: 12/14/2022 (3 years ago)
Contract Number: N/A
Type: EROSION REPAIR
Mail/Deliver Bids To: N/A
HENRY FOJTIK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (8)
E
Engineer's Estimate
$111,697.08
$108,840.00
Over/Under Est: -2.56% -$2,857.08
Over/Under Est: 4.93% $5,502.92
Amt Left: 7.68% $8,360.00
Over/Under Est: 12.71% $14,196.92
Amt Left: 15.67% $17,054.00
Delta: -7.42% -$8,694.00
Over/Under Est: 14.51% $16,203.92
Amt Left: 17.51% $19,061.00
Delta: -1.59% -$2,007.00
Over/Under Est: 26.37% $29,450.92
Amt Left: 29.68% $32,308.00
Delta: -10.36% -$13,247.00
Over/Under Est: 32.51% $36,312.92
Amt Left: 35.99% $39,170.00
Delta: -4.86% -$6,862.00
Over/Under Est: 34.93% $39,012.92
Amt Left: 38.47% $41,870.00
Delta: -1.82% -$2,700.00
Over/Under Est: 58.03% $64,812.92
Amt Left: 62.17% $67,670.00
Delta: -17.12% -$25,800.00

Bid Items & Bid Tabulations

18 Total 0 of 18
UVALDE  |  SH0055  |  SAN ANTONIO  |  6411-75-001  |  12/14/2022  |  $111,697.08  |  BPM - 641175001  |  EROSION REPAIR  |  16 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
GARRET SHIELDS INFRASTRUCTURE
TALBRAN ENTERPRISES LLC
AAD CONTRACTING INC.
BECK-REIT & SONS, LTD.
CROSS PLUS CONSTRUCTION, LLC
FNH CONSTRUCTION, LLC
SHALOM SERVICES CORPORATION
CRACKSEAL OF TEXAS, LLC
EXCAVATION (CHANNEL)
CY 10.000 $40.030 $100.000 $100.000 $20.000 $200.000 $550.000 $100.000 $400.000 $100.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 10.000 $100.000 $100.000 $30.000 $40.000 $200.000 $220.000 $100.000 $80.000 $70.000
COMPOST MANUF TOPSOIL (4")
SY 250.000 $5.000 $10.000 $20.000 $6.000 $15.000 $11.000 $20.000 $60.000 $10.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 250.000 $8.730 $3.000 $4.000 $1.500 $1.000 $1.000 $5.000 $1.000 $10.000
SOIL RETENTION BLANKETS (CL 1) (TY C)
SY 250.000 $6.900 $5.000 $20.000 $5.000 $10.000 $1.000 $5.000 $8.000 $10.000
FLOWABLE BACKFILL
CY 10.000 $400.000 $400.000 $300.000 $250.000 $400.000 $550.000 $350.000 $600.000 $1,300.000
RIPRAP (STONE COMMON)(DRY)(6 IN)
CY 35.000 $150.000 $130.000 $260.000 $350.000 $300.000 $220.000 $185.000 $230.000 $240.000
GABION MATTRESSES (GALV)(12 IN)
SY 343.000 $135.000 $130.000 $160.000 $80.000 $150.000 $193.000 $185.000 $140.000 $20.000
GABIONS (3' X 3')(GALV)
CY 29.000 $325.000 $300.000 $240.000 $200.000 $400.000 $292.000 $300.000 $350.000 $50.000
GABIONS (5'X 3')(GALV)
CY 38.000 $325.000 $300.000 $240.000 $200.000 $400.000 $209.000 $500.000 $290.000 $50.000
MOBILIZATION
LS 1.000 $10,000.000 $10,000.000 $10,000.000 $53,445.000 $15,555.000 $16,500.000 $15,000.000 $30,000.000 $90,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 1.000 $3,500.000 $5,000.000 $3,500.000 $7,000.000 $2,000.000 $5,500.000 $8,500.000 $2,000.000 $3,000.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 112.000 $60.000 $30.000 $20.000 $18.000 $40.000 $11.000 $40.000 $30.000 $290.000
CONSTRUCTION EXITS (REMOVE)
SY 112.000 $20.000 $20.000 $20.000 $9.000 $10.000 $11.000 $20.000 $20.000 $10.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 80.000 $13.230 $10.000 $5.000 $5.000 $5.000 $11.000 $18.000 $8.000 $10.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 80.000 $2.450 $5.000 $2.000 $2.000 $1.000 $1.000 $9.000 $6.000 $10.000
TREE AND BRUSH REMOVAL
AC 0.100 $10,000.000 $25,000.000 $1,000.000 $1,500.000 $10,000.000 $1,650.000 $10,000.000 $35,000.000 $19,000.000
TMA (STATIONARY)
DAY 16.000 $193.430 $300.000 $200.000 $150.000 $1.000 $550.000 $250.000 $200.000 $350.000
Totals: $111,697.080 $108,840.000 $117,200.000 $125,894.000 $127,901.000 $141,148.000 $148,010.000 $150,710.000 $176,510.000