Show Job Controls
Bid Cobra

UVALDE US0090 (6387-39-001)

Items: 19

County: UVALDE
Length: N/A
Highway: US0090
District: SAN ANTONIO
Control Number: 6387-39-001
DBE Goal: N/A
Project: RMC - 638739001
Guaranty: N/A
Time: 24 W
Engineer's Estimate: $139,344.48
Date: 06/15/2022 (3 years ago)
Contract Number: N/A
Type: METAL BEAM GUARD FENCE REPAIR
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Documents:
Bidders (3)
E
Engineer's Estimate
$139,344.48
1
$271,991.70
Over/Under Est: 95.19% $132,647.22
Over/Under Est: 158.19% $220,434.63
Amt Left: 32.28% $87,787.41
$464,676.00
Over/Under Est: 233.47% $325,331.52
Amt Left: 70.84% $192,684.30
Delta: -29.16% -$104,896.89

Bid Items & Bid Tabulations

19 Total 0 of 19
UVALDE  |  US0090  |  SAN ANTONIO  |  6387-39-001  |  06/15/2022  |  $139,344.48  |  RMC - 638739001  |  METAL BEAM GUARD FENCE REPAIR  |  24 W
Item Code
Description
Unit
Quantity
Engineer's Estimate
RELMCO, INC.
VECTOR UTILITIES LLC
CK NEWBERRY, LLC
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 52.000 $30.240 $100.000 $186.070 $225.000
COMPOST MANUF TOPSOIL (4")
SY 864.000 $3.380 $8.000 $11.710 $25.000
BROADCAST SEED (PERM) (RURAL) (CLAY)
SY 864.000 $1.110 $4.000 $4.390 $4.000
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 864.000 $1.930 $8.000 $7.320 $5.000
CONC STR REPAIR (VERTICAL & OVERHEAD)
SF 88.000 $165.000 $300.000 $448.530 $300.000
CONC STR REPR(REMOV AND REPL WINGWALL)
CY 4.000 $1,732.050 $6,500.000 $8,842.570 $5,000.000
RIPRAP (MOW STRIP)(4 IN)
CY 36.000 $490.350 $450.000 $1,333.150 $1,250.000
SET (REPLACE PIPE RUNNER)
EA 44.000 $1,000.000 $2,200.000 $1,413.030 $1,600.000
MOBILIZATION
LS 1.000 $6,000.000 $20,000.000 $25,184.530 $125,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 2.000 $1,600.000 $6,500.000 $5,121.580 $25,000.000
MTL W-BEAM GD FEN (TIM POST)
LF 440.000 $32.030 $31.680 $62.920 $45.000
MTL W - BEAM GD FEN (LOW FILL CULVERT)
LF 110.000 $34.000 $109.500 $219.500 $150.000
REMOVE METAL BEAM GUARD FENCE
LF 500.000 $3.420 $2.200 $14.590 $15.000
REMOVE TERMINAL ANCHOR SECTION
EA 3.000 $324.420 $220.000 $614.590 $1,200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,395.000 $3,800.000 $7,316.550 $6,000.000
GUARDRAIL END TREATMENT (REMOVE)
EA 1.000 $564.420 $247.500 $673.130 $1,000.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 12.000 $47.610 $30.000 $36.580 $125.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 12.000 $31.010 $30.000 $43.900 $75.000
TMA (STATIONARY)
DAY 24.000 $180.000 $300.000 $731.650 $500.000
Totals: $139,344.480 $271,991.700 $359,779.110 $464,676.000