Bid Cobra

UPSHUR FM 556 (2030-01-011)

Items: 72

County: UPSHUR
Length: N/A
Highway: FM 556
District: ATLANTA
Control Number: 2030-01-011
DBE Goal: 500.0%
Project: BR 2B24(032)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $4,301,743.15
Date: 05/03/2024 (2 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
WENDY STARKES
OSCAR FLORES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$4,301,743.15
$3,343,732.79
Over/Under Est: -22.27% -$958,010.36
$3,520,919.85
Over/Under Est: -18.15% -$780,823.30
Amt Left: 5.3% $177,187.06
Over/Under Est: -15.93% -$685,249.15
Amt Left: 8.16% $272,761.21
Delta: -2.71% -$95,574.15
Over/Under Est: -11.29% -$485,560.37
Amt Left: 14.13% $472,449.99
Delta: -5.52% -$199,688.78
Subcontractor Percentage Amount
MORRIS COUNTY CONTRACTORS, L.L.C. 1.93% $45,081.39
ISAACS CONSTRUCTION SERVICES LLC 1.31% $30,599.29
STRIPING TECHNOLOGY, L.P. 0.60% $14,014.94
PANOLA SIGN & BARRICADE, INC. 0.55% $12,847.03
SOUTHWEST ENVIRONMENT SERVICES LLC 0.33% $7,708.22
TORO BRAVO CONSTRUCTION, LLC 0.27% $6,306.72
SOUTHEAST GRINDING AND GROOVING LLC 0.27% $6,306.72
HODGES AND SON CONSTRUCTION COMPANY, INC. 0.00% $0.00
Total: 5.26% $122,864.31

Bid Items & Bid Tabulations

72 Total 0 of 72
UPSHUR  |  FM 556  |  ATLANTA  |  2030-01-011  |  05/03/2024  |  $4,301,743.15  |  BR 2B24(032)  |  REPLACE BRIDGE AND APPROACHES  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
EAST TEXAS BRIDGE, INC.
TRUE ROADS, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
PREP ROW (TREE)(24"-30"DIA)
EA 1.000 $1,500.000 $2,500.000 $3,000.000 $3,000.000 $15,000.000
REMOVING CONC (RIPRAP)
SY 82.000 $45.000 $20.000 $40.000 $10.000 $90.000
REMOVING CONCRETE(MOW STRIP)
LF 534.000 $16.000 $10.000 $6.000 $10.000 $10.000
REMOVING STAB BASE & ASPH PAV (7"-12")
SY 3,333.000 $25.000 $11.000 $8.000 $20.000 $13.000
EXCAVATION (ROADWAY)
CY 708.000 $30.000 $15.000 $22.000 $30.000 $28.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 2,556.000 $50.000 $20.000 $32.000 $30.000 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 5,464.000 $4.500 $3.000 $4.000 $4.000 $4.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 5,464.000 $1.250 $0.720 $0.800 $1.500 $0.710
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 2,732.000 $1.250 $0.690 $0.750 $1.000 $0.720
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 2,732.000 $1.250 $0.690 $0.750 $1.000 $0.700
VEGETATIVE WATERING
MG 175.000 $160.000 $5.000 $44.000 $1.000 $12.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 950.000 $3.000 $0.800 $1.900 $3.000 $1.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 976.000 $125.000 $135.000 $135.000 $80.000 $145.000
CEMENT
TON 127.000 $325.000 $305.000 $300.000 $320.000 $320.000
CEMENT TREAT (SUBGRADE) (8")
SY 4,391.000 $8.250 $5.000 $3.650 $12.000 $5.000
CEMENT TREAT (NEW BASE)(DC)(8")
SY 4,383.000 $8.250 $5.000 $3.650 $12.000 $5.000
PRIME COAT (MC-30)
GAL 1,097.000 $12.000 $6.500 $12.500 $8.000 $7.000
CEM STABIL BKFL
CY 141.000 $290.000 $275.000 $325.000 $250.000 $305.000
FLOWABLE BACKFILL
CY 40.000 $650.000 $300.000 $280.000 $250.000 $350.000
DRILL SHAFT (24 IN)
LF 450.000 $275.000 $175.000 $220.000 $125.000 $230.000
DRILL SHAFT (36 IN)
LF 440.000 $350.000 $250.000 $380.000 $200.000 $325.000
CL C CONC (ABUT)(HPC)
CY 29.000 $1,700.000 $1,275.000 $1,850.000 $1,800.000 $1,450.000
CL C CONC (CAP)(HPC)
CY 34.200 $1,850.000 $1,300.000 $1,925.000 $1,800.000 $1,350.000
CL C CONC (COLUMN)(HPC)
CY 12.700 $2,100.000 $1,300.000 $2,450.000 $1,800.000 $1,750.000
REINF CONC SLAB (SLAB BEAM)(HPC)
SF 7,849.000 $30.000 $30.000 $25.000 $24.000 $32.000
APPROACH SLAB (HPC)
CY 84.400 $850.000 $1,000.000 $770.000 $1,000.000 $1,100.000
PRESTR CONC SLAB BEAM (4SB15)
LF 672.010 $300.000 $235.000 $300.000 $250.000 $250.000
PRESTR CONC SLAB BEAM (5SB15)
LF 1,008.010 $310.000 $235.000 $300.000 $250.000 $250.000
RIPRAP (CONC)(CL B)
CY 2.600 $1,050.000 $1,000.000 $1,685.000 $1,000.000 $2,000.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 909.000 $225.000 $195.000 $160.000 $200.000 $210.000
BEDDING MATERIAL (6 IN)
CY 208.000 $220.000 $195.000 $185.000 $200.000 $225.000
RIPRAP (MOW STRIP)(4 IN)
CY 40.000 $750.000 $725.000 $700.000 $650.000 $740.000
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
LF 364.000 $165.000 $175.000 $135.000 $110.000 $155.000
ARMOR JOINT
LF 89.000 $175.000 $125.000 $110.000 $170.000 $130.000
ARMOR JOINT (SEALED)
LF 128.000 $160.000 $150.000 $110.000 $170.000 $140.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $100,000.000 $40,000.000 $60,000.000 $175,000.000 $50,000.000
REMOV STR (SMALL FENCE)
LF 447.000 $20.000 $4.000 $6.000 $10.000 $10.000
MOBILIZATION
LS 1.000 $281,000.000 $225,000.000 $200,000.000 $225,000.000 $260,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $10,600.000 $5,000.000 $5,500.000 $12,000.000 $6,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 60.000 $45.000 $38.000 $50.000 $1.000 $45.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 100.000 $75.000 $54.000 $88.000 $1.000 $55.000
ROCK FILTER DAMS (REMOVE)
LF 160.000 $20.000 $11.000 $18.000 $1.000 $11.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 160.000 $35.000 $32.000 $37.500 $1.000 $39.000
CONSTRUCTION EXITS (REMOVE)
SY 160.000 $12.000 $10.500 $15.000 $1.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 2,551.000 $5.000 $4.250 $5.000 $1.000 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 2,551.000 $1.750 $0.700 $0.800 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 391.000 $12.000 $8.500 $7.500 $1.000 $7.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 391.000 $3.000 $2.150 $1.250 $1.000 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 562.500 $35.000 $25.000 $29.000 $26.000 $26.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $2,000.000 $2,000.000 $1,500.000 $1,820.000
REMOVE METAL BEAM GUARD FENCE
LF 275.000 $7.000 $2.150 $2.500 $2.000 $2.200
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $275.000 $165.000 $187.500 $1,200.000 $165.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,500.000 $3,100.000 $3,600.000 $2,800.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $350.000 $215.000 $250.000 $500.000 $220.000
WIRE FENCE (TY C)
LF 448.000 $40.000 $27.000 $18.750 $20.000 $11.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 2.000 $825.000 $1,200.000 $1,250.000 $1,600.000 $1,200.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 6.000 $43.500 $50.000 $56.250 $50.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 18.000 $35.000 $30.000 $31.250 $40.000 $28.000
INSTL OM ASSM (OM-2Z)(WFLX)GND
EA 2.000 $110.000 $250.000 $125.000 $200.000 $300.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 150.000 $3.000 $2.000 $3.750 $5.000 $2.200
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 150.000 $3.000 $2.000 $3.750 $5.000 $2.200
PAVEMENT SEALER 6"
LF 868.000 $1.100 $2.150 $2.500 $1.000 $2.200
REFL PAV MRKR TY II-A-A
EA 34.000 $10.000 $21.500 $25.000 $20.000 $22.000
PAV SURF PREP FOR MRK (6")
LF 868.000 $1.250 $1.100 $1.250 $1.000 $1.100
PAV SURF PREP FOR MRK (RPM)
EA 6.000 $10.000 $11.000 $12.500 $1.000 $13.000
NO. OF WORKING DAYS
$/D 5,997.000 $204.000 $171.000 $171.000 $171.000 $204.000
SP MIXES SP-D PG70-22
TON 354.000 $380.000 $245.000 $225.000 $250.000 $200.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 3.000 $16,500.000 $18,000.000 $20,000.000 $28,000.000 $22,000.000
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 2,680.000 $3.000 $2.150 $2.500 $4.000 $2.200
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 2,680.000 $3.000 $2.150 $2.500 $4.000 $2.200
TMA (STATIONARY)
DAY 5.000 $310.000 $350.000 $180.000 $300.000 $250.000
TMA (MOBILE OPERATION)
HR 60.000 $95.000 $35.000 $20.000 $50.000 $70.000
Totals: $4,301,743.150 $3,343,732.790 $3,520,919.850 $3,616,494.000 $3,816,182.780