UPSHUR FM 993 (1511-01-013)

Items: 76

County: UPSHUR
Length: N/A
Highway: FM 993
District: ATLANTA
Control Number: 1511-01-013
DBE Goal: 400.0%
Project: BR 2024(791)
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $2,229,422.25
Date: 03/06/2024 (2 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
WENDY STARKES
OSCAR FLORES
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (4)
E
Engineer's Estimate
$2,229,422.25
$1,790,148.09
Over/Under Est: -19.7% -$439,274.16
Over/Under Est: -12.99% -$289,610.65
Amt Left: 8.36% $149,663.51
Over/Under Est: -10.54% -$234,962.25
Amt Left: 11.41% $204,311.91
Delta: -2.82% -$54,648.40
Over/Under Est: -8.52% -$189,930.05
Amt Left: 13.93% $249,344.11
Delta: -2.26% -$45,032.20
Subcontractor Percentage Amount
HODGES AND SON CONSTRUCTION COMPANY, INC. 7.02% $106,965.01
R & G CONSTRUCTION, LLC 5.44% $82,890.26
A K CONTRACTING, LLC 4.87% $74,205.07
MORRIS COUNTY CONTRACTORS, L.L.C. 1.84% $28,036.41
STRIPING TECHNOLOGY, L.P. 0.85% $12,951.60
FLEX SUPPLY, LLC 0.68% $10,361.28
TEXOP CONSTRUCTION 0.60% $9,142.31
CAP RIVER LLC 0.32% $4,875.90
PENHALL COMPANY 0.27% $4,114.04
TORO BRAVO CONSTRUCTION, LLC 0.26% $3,961.67
Total: 22.15% $337,503.55

Bid Items & Bid Tabulations

76 Total 0 of 76
UPSHUR  |  FM 993  |  ATLANTA  |  1511-01-013  |  03/06/2024  |  $2,229,422.25  |  BR 2024(791)  |  REPLACE BRIDGE AND APPROACHES  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
THK CONSTRUCTION LLC
TRUE ROADS CONSTRUCTION, LLC
HODGES AND SON CONSTRUCTION COMPANY, INC.
EAST TEXAS BRIDGE, INC.
REMOVING CONC (RIPRAP)
SY 122.000 $45.000 $7.000 $10.000 $18.000 $30.000
REMOVING CONCRETE(MOW STRIP)
LF 650.000 $15.000 $5.000 $4.000 $6.000 $15.000
REMOV STAB BASE AND ASPH PAV (2"-15")
SY 2,184.000 $15.000 $12.000 $7.000 $15.000 $13.500
EXCAVATION (ROADWAY)
CY 508.000 $30.000 $20.000 $24.000 $15.000 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 1,953.000 $50.000 $20.000 $24.000 $30.000 $30.000
FURNISHING AND PLACING TOPSOIL (4")
SY 2,832.000 $5.500 $4.500 $4.500 $3.000 $4.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 2,832.000 $1.500 $2.680 $0.700 $2.000 $1.100
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 1,416.000 $1.250 $0.010 $0.700 $1.000 $0.900
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 1,416.000 $1.250 $0.010 $0.700 $1.000 $0.900
VEGETATIVE WATERING
MG 91.000 $160.000 $10.000 $30.000 $1.000 $10.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 160.000 $4.500 $2.000 $2.400 $4.000 $2.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 727.000 $110.000 $175.000 $140.000 $100.000 $85.000
CEMENT
TON 95.000 $325.000 $250.000 $350.000 $300.000 $375.000
CEMENT TREAT (SUBGRADE) (8")
SY 3,319.000 $6.750 $5.750 $6.000 $7.000 $5.000
CEMENT TREAT (NEW BASE)(DC)(8")
SY 3,267.000 $5.250 $5.750 $6.000 $7.000 $5.000
PRIME COAT (MC-30)
GAL 818.000 $12.000 $8.360 $10.000 $15.000 $10.000
CEM STABIL BKFL
CY 137.000 $300.000 $300.000 $310.000 $300.000 $300.000
DRILL SHAFT (24 IN)
LF 275.000 $275.000 $206.220 $275.000 $195.000 $230.000
DRILL SHAFT (36 IN)
LF 240.000 $375.000 $272.070 $425.000 $275.000 $315.000
CL C CONC (ABUT)(HPC)
CY 27.800 $1,700.000 $1,100.000 $1,385.000 $1,600.000 $1,400.000
CL C CONC (CAP)(HPC)
CY 22.800 $1,700.000 $1,100.000 $1,320.000 $1,600.000 $1,500.000
CL C CONC (COLUMN)(HPC)
CY 8.500 $2,000.000 $1,500.000 $1,575.000 $1,800.000 $1,500.000
REINF CONC SLAB (SLAB BEAM)(HPC)
SF 4,848.000 $25.000 $19.500 $31.000 $22.000 $25.000
APPROACH SLAB (HPC)
CY 84.400 $895.000 $630.000 $700.000 $1,000.000 $1,000.000
PRESTR CONC SLAB BEAM (4SB12)
LF 414.000 $250.000 $235.000 $280.000 $250.000 $230.000
PRESTR CONC SLAB BEAM (5SB12)
LF 621.000 $260.000 $235.000 $280.000 $250.000 $230.000
RIPRAP (CONC)(CL B)
CY 2.400 $875.000 $950.000 $1,000.000 $950.000 $2,000.000
RIPRAP (STONE PROTECTION)(12 IN)
CY 566.000 $225.000 $160.000 $175.000 $200.000 $200.000
BEDDING MATERIAL (6 IN)
CY 108.000 $215.000 $140.000 $180.000 $180.000 $200.000
RIPRAP (MOW STRIP)(4 IN)
CY 30.000 $740.000 $750.000 $600.000 $600.000 $800.000
RAIL (TY SSTR) (W/DRAIN SLOT) (HPC)
LF 234.000 $165.000 $160.000 $135.000 $150.000 $150.000
ARMOR JOINT
LF 88.000 $195.000 $150.000 $90.000 $200.000 $100.000
ARMOR JOINT (SEALED)
LF 85.000 $200.000 $150.000 $110.000 $220.000 $150.000
RC PIPE (CL III)(18 IN)
LF 28.000 $105.000 $100.000 $90.000 $120.000 $80.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 2.000 $1,700.000 $1,000.000 $1,500.000 $2,500.000 $1,200.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $40,000.000 $25,000.000 $31,000.000 $50,000.000 $25,000.000
REMOV STR (PIPE)
EA 1.000 $2,000.000 $500.000 $525.000 $1,000.000 $500.000
REMOV STR (SMALL FENCE)
LF 858.000 $15.000 $5.000 $4.500 $5.000 $8.000
MOBILIZATION
LS 1.000 $175,000.000 $175,000.000 $60,000.000 $150,000.000 $200,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $10,000.000 $1,500.000 $1,600.000 $4,500.000 $6,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 100.000 $50.000 $47.700 $54.000 $1.000 $42.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 15.000 $75.000 $53.000 $96.000 $1.000 $55.000
ROCK FILTER DAMS (REMOVE)
LF 115.000 $18.000 $10.600 $18.000 $1.000 $16.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 160.000 $37.500 $37.100 $42.000 $1.000 $40.000
CONSTRUCTION EXITS (REMOVE)
SY 160.000 $13.000 $7.420 $12.000 $1.000 $16.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,608.000 $5.000 $4.770 $4.500 $1.000 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,608.000 $1.750 $1.060 $0.300 $1.000 $1.500
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 355.000 $12.000 $12.460 $6.000 $5.000 $11.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 355.000 $2.750 $1.590 $1.200 $1.000 $5.500
DRIVEWAYS (ACP)
SY 119.000 $115.000 $25.160 $100.000 $120.000 $75.000
MTL W-BEAM GD FEN (TIM POST)
LF 287.500 $30.000 $25.000 $27.000 $24.000 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,500.000 $1,749.000 $2,000.000 $1,700.000 $1,850.000
REMOVE METAL BEAM GUARD FENCE
LF 400.000 $6.750 $2.120 $2.400 $2.000 $2.500
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $300.000 $159.000 $180.000 $150.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $3,450.000 $3,047.500 $3,450.000 $2,900.000 $3,200.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $410.000 $212.000 $240.000 $500.000 $250.000
WIRE FENCE (TY C)
LF 760.000 $35.000 $20.000 $21.000 $20.000 $32.000
GATE (TY 1)
EA 1.000 $3,450.000 $500.000 $900.000 $2,000.000 $1,200.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 1.000 $950.000 $1,500.000 $1,200.000 $1,500.000 $1,700.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 2.000 $900.000 $1,500.000 $1,200.000 $1,500.000 $1,400.000
REMOVE SM RD SN SUP&AM
EA 1.000 $155.000 $500.000 $180.000 $500.000 $100.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $45.000 $21.200 $24.000 $20.000 $30.000
INSTL DEL ASSM (D-SW)SZ (BRF)GF1 (BI)
EA 7.000 $35.000 $21.200 $24.000 $20.000 $30.000
WK ZN PAV MRK SHT TERM (TAB)TY W
EA 100.000 $2.500 $0.100 $2.400 $5.000 $3.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 100.000 $3.000 $0.100 $2.400 $5.000 $3.000
PAVEMENT SEALER 6"
LF 608.000 $1.000 $2.120 $2.400 $2.000 $2.200
REFL PAV MRKR TY II-A-A
EA 22.000 $8.000 $10.600 $12.000 $10.000 $11.000
PAV SURF PREP FOR MRK (6")
LF 608.000 $0.750 $2.120 $2.400 $2.000 $2.200
PAV SURF PREP FOR MRK (RPM)
EA 4.000 $1.500 $26.500 $30.000 $25.000 $27.500
NO. OF WORKING DAYS
$/D 3,210.000 $102.000 $83.000 $102.000 $102.000 $102.000
SP MIXES SP-C PG76-22
TON 352.000 $180.000 $207.790 $234.000 $300.000 $245.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,950.000 $10,000.000 $18,000.000 $10,000.000 $15,000.000
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 1,720.000 $1.400 $3.180 $3.600 $3.000 $3.300
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 1,720.000 $1.500 $3.180 $3.600 $3.000 $3.300
TMA (STATIONARY)
DAY 5.000 $400.000 $400.000 $240.000 $150.000 $300.000
TMA (MOBILE OPERATION)
HR 60.000 $92.000 $35.000 $60.000 $20.000 $30.000
Totals: $2,229,422.250 $1,790,148.090 $1,939,811.600 $1,994,460.000 $2,039,492.200