UPSHUR US 259 (0392-02-096)

Items: 91

County: UPSHUR
Length: N/A
Highway: US 259
District: ATLANTA
Control Number: 0392-02-096
DBE Goal: N/A
Project: C 392-2-96
Guaranty: N/A
Time: 0 X
Engineer's Estimate: $10,943,867.00
Date: 01/08/2019 (7 years ago)
Contract Number: N/A
Type: CEMENT TREAT BASE, ACP AND PAV MRKS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$10,943,867.00
$9,676,218.80
Over/Under Est: -11.58% -$1,267,648.20
$10,688,805.98
Over/Under Est: -2.33% -$255,061.02
Amt Left: 10.46% $1,012,587.18
Over/Under Est: -1.95% -$213,478.18
Amt Left: 10.89% $1,054,170.02
Delta: -0.39% -$41,582.84
Over/Under Est: 4.41% $482,357.72
Amt Left: 18.09% $1,750,005.92
Delta: -6.48% -$695,835.90

Bid Items & Bid Tabulations

91 Total 0 of 91
UPSHUR  |  US 259  |  ATLANTA  |  0392-02-096  |  01/08/2019  |  $10,943,867.00  |  C 392-2-96  |  CEMENT TREAT BASE, ACP AND PAV MRKS  |  0 X
Item Code
Description
Unit
Quantity
Engineer's Estimate
H. H. HOWARD & SONS, INC.
EAST TEXAS BRIDGE, INC.
MADDEN CONTRACTING COMPANY, LLC.
L. S. EQUIPMENT CO., INC.
PREPARING ROW
STA 45.190 $1,000.000 $1,000.000 $1,600.000 $1,820.000 $1,000.000
REMOVING CONCRETE(MOW STRIP)
LF 2,280.000 $10.000 $5.000 $9.000 $10.000 $5.000
SUBGRADE WIDENING (ORD COMP)
STA 267.000 $200.000 $150.000 $275.000 $195.000 $300.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 54.000 $50.000 $10.000 $20.000 $95.000 $15.000
BACKFILL (TY C)
STA 309.000 $325.000 $150.000 $380.000 $210.000 $450.000
FURNISHING AND PLACING TOPSOIL (4")
SY 7,000.000 $0.750 $1.000 $1.750 $1.650 $1.000
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 68,705.000 $0.750 $0.700 $0.750 $0.720 $0.620
BONDED FBR MTRX SEED (TEMP)(WARM)
SY 32,155.000 $0.750 $0.650 $0.700 $0.680 $0.600
BONDED FBR MTRX SEED (TEMP)(COOL)
SY 32,155.000 $0.750 $0.650 $0.700 $0.660 $0.600
VEGETATIVE WATERING
MG 2,128.500 $12.000 $1.000 $4.000 $10.000 $0.010
SOIL RETENTION BLANKETS (CL 1) (TY A)
SY 4,554.000 $5.000 $1.000 $2.100 $1.890 $1.250
FL BS (CMP IN PLACE)(TY D GR 1-2)(11")
SY 7,424.000 $15.000 $24.000 $27.000 $26.000 $23.570
FL BS (CMP IN PLC)(TY D)(GR1-2)(3")
SY 131,786.000 $2.000 $6.600 $7.800 $6.800 $5.500
CEMENT
TON 2,388.000 $150.000 $160.000 $155.000 $153.500 $150.000
CEMENT TREAT (MX EXST MTL & NW BS)(11")
SY 140,533.000 $3.500 $2.500 $2.750 $1.750 $2.750
PRIME COAT (MC-30)
GAL 35,134.000 $5.000 $4.000 $4.250 $3.950 $4.000
EMULS ASPH (EROSN CONT)(SS-1)
GAL 7,482.000 $3.000 $4.000 $5.000 $0.010 $4.000
ASPH (TIER II)
GAL 49,186.000 $3.400 $3.750 $3.000 $3.750 $3.250
AGGR(TY-PB GR-3 SAC-B)
CY 1,277.000 $110.000 $120.000 $135.000 $135.000 $120.000
SUPERPAVE MIXTURES SP-C PG76-22
TON 31,984.000 $125.000 $100.000 $108.000 $110.000 $110.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 17,062.000 $125.000 $133.120 $138.000 $145.000 $150.000
PLANE ASPH CONC PAV (2")
SY 78,442.000 $2.100 $1.470 $1.450 $1.500 $1.670
PLANE ASPH CONC PAV (3")
SY 3,772.000 $2.100 $1.360 $2.000 $1.500 $1.660
PLANE ASPH CONC PAV (5")
SY 130,131.000 $3.000 $1.750 $2.850 $2.500 $2.550
CUT & RESTORE ASPH PAVING
SY 24.000 $115.000 $100.000 $60.000 $160.000 $50.000
RIPRAP (MOW STRIP)(4 IN)
CY 114.000 $450.000 $475.000 $425.000 $470.000 $400.000
RETROFIT RAIL (TY T631)
LF 168.750 $95.000 $99.000 $110.000 $99.000 $100.000
RC PIPE (CL III)(18 IN)
LF 100.000 $42.000 $30.000 $43.000 $60.000 $35.000
RC PIPE (CL III)(24 IN)
LF 8.000 $52.000 $100.000 $60.000 $90.000 $45.000
SET (TY I) (36 IN) (6: 1) (C)
EA 2.000 $3,800.000 $7,500.000 $6,800.000 $11,750.000 $3,500.000
SET (TY I)(S=3 FT)(HW=2FT)(4:1)(C)
EA 3.000 $7,000.000 $6,000.000 $3,700.000 $7,600.000 $4,500.000
SET (TY II) (18 IN) (RCP) (6: 1) (C)
EA 8.000 $850.000 $1,000.000 $600.000 $600.000 $750.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 43.000 $850.000 $700.000 $600.000 $600.000 $750.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 4.000 $1,000.000 $1,000.000 $1,000.000 $940.000 $950.000
SET (TY II) (36 IN) (RCP) (6: 1) (P)
EA 1.000 $4,500.000 $5,000.000 $4,000.000 $3,800.000 $3,500.000
MOBILIZATION
LS 1.000 $962,277.150 $270,000.000 $400,000.000 $385,000.000 $1,100,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 12.000 $3,500.000 $5,000.000 $8,000.000 $25,000.000 $4,000.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 250.000 $5.000 $38.000 $50.000 $80.000 $80.000
ROCK FILTER DAMS (REMOVE)
LF 250.000 $1.000 $10.000 $8.000 $40.000 $10.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 540.000 $1.000 $3.000 $3.000 $2.450 $2.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 540.000 $1.000 $1.000 $0.900 $0.900 $0.900
CONSTRUCTING DETOURS
SY 2,314.000 $100.000 $55.000 $65.000 $61.500 $158.000
DRIVEWAYS (ACP)
SY 1,690.000 $25.000 $51.000 $30.000 $50.000 $51.000
RUMBLE STRIPS (SHOULDER)
LF 83,976.000 $0.200 $0.200 $0.140 $0.300 $0.100
MTL W-BEAM GD FEN (TIM POST)
LF 2,250.000 $20.000 $18.000 $20.000 $18.000 $18.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $1,850.000 $1,380.000 $1,500.000 $1,380.000 $1,375.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,200.000 $995.000 $1,100.000 $995.000 $1,000.000
REMOVE METAL BEAM GUARD FENCE
LF 1,475.000 $2.500 $2.000 $2.200 $2.000 $2.000
REMOVE TERMINAL ANCHOR SECTION
EA 6.000 $300.000 $200.000 $220.000 $200.000 $125.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 4.000 $300.000 $250.000 $275.000 $250.000 $250.000
GUARDRAIL END TREATMENT (INSTALL)
EA 12.000 $2,850.000 $2,525.000 $2,775.000 $2,525.000 $2,525.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $350.000 $250.000 $275.000 $250.000 $250.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 12.000 $290.000 $300.000 $330.000 $300.000 $150.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 1.000 $315.000 $350.000 $375.000 $340.000 $250.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 89.000 $1,100.000 $620.000 $680.000 $620.000 $625.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $650.000 $1,020.000 $1,120.000 $1,020.000 $840.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 13.000 $700.000 $450.000 $480.000 $440.000 $380.000
REMOVE SM RD SN SUP&AM
EA 53.000 $120.000 $105.000 $75.000 $110.000 $50.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 4.000 $38.000 $24.000 $27.000 $24.000 $28.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 12.000 $28.000 $34.000 $38.000 $34.000 $45.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 34.000 $32.000 $35.000 $40.000 $35.000 $45.000
INSTL DEL ASSM (D-DY)SZ 1(BRF)GF2
EA 12.000 $25.000 $34.000 $38.000 $34.000 $45.000
WK ZN PAV MRK NON-REMOV (W)6"(SLD)
LF 94,196.000 $0.250 $0.150 $0.170 $0.150 $0.150
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 640.000 $2.500 $3.000 $3.300 $3.000 $3.000
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 950.000 $0.300 $0.120 $0.130 $0.120 $0.120
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 93,296.000 $0.250 $0.150 $0.170 $0.150 $0.150
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 3,583.000 $0.750 $14.000 $0.970 $0.880 $0.900
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 108.000 $15.000 $14.000 $15.500 $14.000 $14.000
PREFAB PAV MRK TY C (W) (ARROW)
EA 1.000 $250.000 $225.000 $250.000 $225.000 $225.000
PREFAB PAV MRK TY C (W) (WORD)
EA 1.000 $250.000 $325.000 $360.000 $325.000 $325.000
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 300.000 $39.000 $33.500 $37.000 $33.500 $33.500
REFL PAV MRKR TY I-C
EA 277.000 $3.500 $3.400 $3.750 $3.400 $3.400
REFL PAV MRKR TY II-A-A
EA 3,119.000 $3.500 $3.400 $3.750 $3.400 $3.400
REFL PAV MRKR TY II-C-R
EA 946.000 $3.500 $3.400 $3.750 $3.400 $3.400
TRAFFIC BUTTON TY W
EA 2,948.000 $6.000 $2.400 $2.650 $2.400 $2.400
TRAFFIC BUTTON TY Y
EA 2,948.000 $6.000 $2.400 $2.650 $2.400 $2.400
ELIM EXT PAV MRK & MRKS (4")
LF 43,270.000 $0.650 $0.450 $0.500 $0.750 $0.450
ELIM EXT PAV MRK & MRKS (6")
LF 14,640.000 $0.700 $0.550 $0.600 $0.800 $0.450
ELIM EXT PAV MRK & MRKS (8")
LF 70.000 $1.000 $1.000 $1.100 $1.000 $1.000
ELIM EXT PAV MRK & MRKS (ARROW)
EA 1.000 $140.000 $100.000 $110.000 $100.000 $100.000
ELIM EXT PAV MRK & MRKS (WORD)
EA 1.000 $225.000 $100.000 $110.000 $100.000 $100.000
ELIM EXT PV MRK & MRKS (RUMBLE STRIP)
LF 2,000.000 $0.400 $1.000 $1.100 $1.000 $1.000
NO. OF WORKING DAYS
$/D 1,000.000 $170.000 $130.000 $160.000 $170.000 $170.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,000.000 $7,500.000 $15,000.000 $15,000.000 $10,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 7,374.000 $2.800 $4.000 $4.400 $4.000 $10.000
REFL PAV MRK AWT (W) (6")(SLD)(125 MIL)
LF 46,500.000 $0.700 $0.700 $0.770 $0.700 $0.700
REFL PAV MRK AWT (W) (6")(BRK)(125 MIL)
LF 11,932.000 $0.700 $0.700 $0.770 $0.700 $0.700
REFL PAV MRK AWT (Y) (6")(SLD)(125 MIL)
LF 46,512.000 $0.700 $0.700 $0.770 $0.700 $0.700
REFL PAV MRK AWT (Y) (6")(BRK)(125 MIL)
LF 1,268.000 $0.700 $0.700 $0.770 $0.700 $0.700
TMA (STATIONARY)
EA 1.000 $30,000.000 $20,000.000 $20,000.000 $5,000.000 $12,500.000
TMA (MOBILE OPERATION)
HR 100.000 $30.000 $50.000 $30.000 $20.000 $20.000
Totals: $10,943,867.000 $9,676,218.800 $10,688,805.980 $10,730,388.820 $11,426,224.725