UPSHUR US 271 (0248-05-064)

Items: 55

County: UPSHUR
Length: N/A
Highway: US 271
District: ATLANTA
Control Number: 0248-05-064
DBE Goal: N/A
Project: C 248-5-64
Guaranty: N/A
Time: 121 WORKING DAYS
Engineer's Estimate: $5,424,193.80
Date: 05/01/2018 (8 years ago)
Contract Number: N/A
Type: PLANE ACP, ACP SURF, & PAV MARK
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$5,424,193.80
$5,046,398.12
Over/Under Est: -6.97% -$377,795.68
Over/Under Est: 2.27% $122,874.50
Amt Left: 9.92% $500,670.18
Over/Under Est: 7.3% $396,010.02
Amt Left: 15.33% $773,805.70
Delta: -4.92% -$273,135.52
Over/Under Est: 8.03% $435,645.50
Amt Left: 16.12% $813,441.18
Delta: -0.68% -$39,635.48

Bid Items & Bid Tabulations

55 Total 0 of 55
UPSHUR  |  US 271  |  ATLANTA  |  0248-05-064  |  05/01/2018  |  $5,424,193.80  |  C 248-5-64  |  PLANE ACP, ACP SURF, & PAV MARK  |  121 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MADDEN CONTRACTING COMPANY, LLC.
EAST TEXAS BRIDGE, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
REMOVING CONC (DRIVEWAYS)
SY 163.000 $25.000 $20.000 $15.000 $35.000 $30.000
REMOVING CONCRETE(MOW STRIP)
LF 802.000 $6.000 $10.000 $9.000 $14.000 $10.000
SUBGRADE WIDENING (ORD COMP)
STA 277.000 $220.000 $75.000 $350.000 $245.000 $300.000
BACKFILL (TY B)
STA 378.000 $150.000 $175.000 $300.000 $215.000 $225.000
VEGETATIVE WATERING
MG 665.000 $12.500 $10.000 $12.000 $1.000 $10.000
FL BS (CMP IN PLC)(TYA GR1-2) (6")
SY 21,348.000 $20.000 $16.500 $17.000 $19.000 $18.000
SUPERPAVE MIXTURES SP-C PG76-22
TON 5,485.000 $105.000 $101.250 $106.000 $100.000 $108.000
SUPERPAVE MIXTURES SP-D PG76-22
TON 1,722.000 $105.000 $115.000 $106.000 $100.000 $145.000
STONE-MTRX-ASPH SMA-D SAC-A PG76-22
TON 23,853.000 $115.000 $121.750 $127.000 $140.000 $135.000
PLANE ASPH CONC PAV (0" TO 3/4")
SY 65,417.000 $0.500 $0.750 $1.000 $1.600 $1.500
PLANE ASPH CONC PAV (3/4")
SY 145,662.000 $1.500 $0.750 $1.000 $1.650 $1.250
PLANE ASPH CONC PAV (3/4"-2")
SY 4,747.000 $4.000 $3.150 $2.000 $2.700 $5.000
RIPRAP (MOW STRIP)(4 IN)
CY 51.000 $500.000 $500.000 $400.000 $510.000 $500.000
MOBILIZATION
LS 1.000 $493,000.000 $212,600.000 $300,000.000 $215,000.000 $295,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 9.000 $4,000.000 $2,000.000 $6,000.000 $3,000.000 $5,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 1,040.000 $33.000 $28.190 $35.000 $31.000 $30.000
ROCK FILTER DAMS (INSTALL) (TY 3)
LF 265.000 $50.000 $52.860 $40.000 $52.000 $40.000
ROCK FILTER DAMS (REMOVE)
LF 1,305.000 $10.000 $11.370 $2.000 $11.000 $9.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 12,960.000 $3.500 $2.440 $3.000 $3.500 $2.750
TEMP SEDMT CONT FENCE (REMOVE)
LF 12,960.000 $1.250 $1.040 $1.000 $1.100 $0.750
DRIVEWAYS (CONC)
SY 130.000 $95.000 $90.000 $120.000 $95.000 $130.000
DRIVEWAYS (ACP)
SY 1,279.000 $50.000 $29.750 $40.000 $30.000 $35.000
TURNOUTS (ACP)
SY 859.000 $25.000 $59.250 $40.000 $56.000 $50.000
RUMBLE STRIPS (SHOULDER)
LF 71,800.000 $0.200 $0.140 $0.200 $0.180 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 587.500 $18.000 $20.250 $23.000 $22.250 $21.000
REMOVE METAL BEAM GUARD FENCE
LF 587.500 $3.000 $3.000 $3.000 $3.300 $2.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,375.000 $2,400.000 $2,500.000 $2,640.000 $2,400.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $275.000 $300.000 $250.000 $330.000 $600.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 21.000 $160.000 $226.000 $300.000 $250.000 $240.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 4.000 $275.000 $242.000 $300.000 $265.000 $250.000
MAILBOX INSTALL-M (TWG-POST) TY 4
EA 1.000 $500.000 $307.000 $500.000 $340.000 $325.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 33.000 $400.000 $393.000 $500.000 $430.000 $400.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 38.000 $52.500 $79.000 $120.000 $87.000 $140.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 7.000 $35.000 $24.000 $50.000 $26.000 $110.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 26,590.000 $0.130 $0.100 $0.120 $0.110 $0.110
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 105,380.000 $0.100 $0.100 $0.120 $0.110 $0.110
WK ZN PAV MRK NON-REMOV (Y)4"(SLD)
LF 112,180.000 $0.100 $0.100 $0.120 $0.110 $0.110
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 8,730.000 $1.250 $1.250 $2.000 $1.250 $1.120
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 9,740.000 $1.250 $1.250 $2.000 $1.450 $1.110
REFL PAV MRK TY I (W)8"(DOT)(100MIL)
LF 105.000 $1.100 $1.000 $1.100 $1.100 $1.050
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 40.000 $1.250 $1.000 $1.100 $1.100 $1.050
PREFAB PAV MRK TY C (W) (ARROW)
EA 3.000 $205.000 $180.000 $200.000 $200.000 $189.000
PREFAB PAV MRK TY C (W) (WORD)
EA 5.000 $345.000 $240.000 $300.000 $265.000 $252.000
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 287.000 $12.000 $15.000 $20.000 $16.500 $15.750
REFL PAV MRKR TY I-C
EA 943.000 $3.250 $3.200 $4.000 $3.500 $3.500
REFL PAV MRKR TY II-A-A
EA 1,114.000 $3.250 $3.200 $4.000 $3.500 $3.500
REFL PAV MRKR TY II-C-R
EA 5.000 $3.250 $3.200 $4.000 $3.500 $3.500
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $12,500.000 $7,500.000 $15,000.000 $18,000.000 $8,000.000
PREFORMED IN-LANE(TRANS) RUMBLE STRIP
LF 160.000 $3.000 $12.500 $15.000 $13.750 $13.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 9,420.000 $3.000 $3.750 $4.000 $4.150 $4.000
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 73,788.000 $0.450 $0.550 $0.600 $0.600 $0.600
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 18,630.000 $0.500 $0.550 $0.600 $0.600 $0.600
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 76,470.000 $0.450 $0.550 $0.600 $0.600 $0.600
TMA (STATIONARY)
DAY 173.000 $200.000 $210.000 $200.000 $130.000 $300.000
TMA (MOBILE OPERATION)
HR 340.000 $100.000 $0.100 $20.000 $35.000 $50.000
Totals: $5,424,193.800 $5,046,398.125 $5,547,068.300 $5,820,203.825 $5,859,839.300