UPSHUR US 80 (0096-03-075)

Items: 79

County: UPSHUR
Length: N/A
Highway: US 80
District: ATLANTA
Control Number: 0096-03-075
DBE Goal: N/A
Project: F 2023(088)
Guaranty: N/A
Time: 162 WORKING DAYS
Engineer's Estimate: $8,086,312.60
Date: 09/07/2022 (3 years ago)
Contract Number: N/A
Type: REHABILITATE EXISTING ROADWAY
Mail/Deliver Bids To: N/A
WENDY STARKES
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$8,086,312.60
$6,277,174.34
Over/Under Est: -22.37% -$1,809,138.26
$6,894,560.97
Over/Under Est: -14.74% -$1,191,751.63
Amt Left: 9.84% $617,386.63
Over/Under Est: -4.59% -$371,430.89
Amt Left: 22.9% $1,437,707.37
Delta: -11.90% -$820,320.74
Subcontractor Percentage Amount
R & G CONSTRUCTION, LLC 16.67% $1,113,304.04
COLD CREEK CONSTRUCTION, LTD 4.04% $269,810.94
STRIPING TECHNOLOGY, L.P. 2.44% $162,955.12
ISAACS CONSTRUCTION SERVICES LLC 1.94% $129,562.68
REYNOLDS & KAY, LTD. 1.67% $111,530.76
MORRIS COUNTY CONTRACTORS, L.L.C. 1.56% $104,184.42
PANOLA SIGN & BARRICADE, INC. 1.21% $80,809.71
SOUTHWEST ENVIRONMENT SERVICES LLC 0.84% $56,099.30
WEST TEXAS ROCK RESOURCES, LLC 0.30% $20,035.47
Total: 30.67% $2,048,292.44

Bid Items & Bid Tabulations

79 Total 0 of 79
UPSHUR  |  US 80  |  ATLANTA  |  0096-03-075  |  09/07/2022  |  $8,086,312.60  |  F 2023(088)  |  REHAB EXIST ROADWAY  |  162 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
MADDEN CONTRACTING COMPANY, LLC.
REYNOLDS & KAY, LTD.
LONGVIEW BRIDGE AND ROAD, LTD.
PREPARING ROW
STA 79.080 $2,000.000 $3,375.000 $2,000.000 $9,000.000
REMOVING CONCRETE(MOW STRIP)
LF 1,500.000 $8.000 $4.250 $5.000 $6.650
EMBANKMENT (VEHICLE)(ORD COMP)(TY C)
CY 110.000 $30.000 $45.000 $38.000 $52.000
BACKFILL (TY C)
STA 155.000 $300.000 $286.000 $300.000 $635.000
BROADCAST SEED (TEMP) (WARM)
SY 26,848.000 $0.200 $0.120 $0.150 $0.130
BROADCAST SEED (TEMP) (COOL)
SY 26,848.000 $0.200 $0.090 $0.100 $0.100
BOND FBR MTRX SEED (PERM)(RURAL)(SAND)
SY 53,697.000 $1.500 $0.550 $0.650 $0.640
VEGETATIVE WATERING
MG 859.000 $20.000 $5.000 $8.000 $15.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 833.000 $2.000 $1.740 $2.000 $2.000
FOG SEAL (CSS-1H)
GAL 2,926.000 $3.250 $5.670 $3.250 $5.800
ASPH (AC-20-5TR)
GAL 13,005.000 $5.000 $4.050 $4.500 $5.450
AGGR(TY-PB GR-4 SAC-B)
CY 226.000 $100.000 $331.500 $200.000 $192.000
FLEXIBLE PAVEMENT STRUCTURE REPAIR(6")
SY 16,177.000 $70.000 $49.750 $63.000 $56.700
PLANE ASPH CONC PAV(0" TO 2")
SY 3,467.000 $4.000 $1.150 $3.290 $2.320
PLANE ASPH CONC PAV (2")
SY 17,081.000 $3.500 $4.750 $2.940 $2.150
PLANE ASPH CONC PAV (3")
SY 32,512.000 $4.000 $4.500 $2.650 $3.450
PLANE ASPH CONC PAV (1 1/4")
SY 64,707.000 $4.000 $1.150 $1.550 $1.750
FULL - DEPTH REPAIR CPJR (8")
SY 120.000 $200.000 $149.000 $255.000 $325.000
RIPRAP (MOW STRIP)(4 IN)
CY 85.000 $575.000 $482.000 $735.000 $555.000
MOBILIZATION
LS 1.000 $730,000.000 $439,500.000 $700,000.000 $600,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 11.000 $10,000.000 $7,500.000 $2,950.000 $11,000.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 500.000 $35.000 $34.000 $39.000 $37.400
ROCK FILTER DAMS (REMOVE)
LF 500.000 $8.000 $10.000 $11.000 $11.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 1,500.000 $6.000 $3.200 $3.450 $3.520
TEMP SEDMT CONT FENCE (REMOVE)
LF 1,500.000 $1.200 $1.000 $1.000 $1.100
BIODEG EROSN CONT LOGS (INSTL) (8")
LF 100.000 $7.000 $15.000 $15.000 $16.500
BIODEG EROSN CONT LOGS (REMOVE)
LF 100.000 $1.500 $10.000 $10.000 $11.000
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 4,470.000 $0.300 $1.500 $2.000 $2.050
MTL W-BEAM GD FEN (TIM POST)
LF 1,350.000 $25.000 $22.500 $26.000 $24.750
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 2.000 $1,700.000 $1,450.000 $1,700.000 $1,595.000
REMOVE METAL BEAM GUARD FENCE
LF 1,350.000 $5.000 $2.250 $2.500 $2.500
REMOVE DOWNSTREAM ANCHOR TERMINAL
EA 2.000 $275.000 $150.000 $175.000 $165.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,500.000 $2,750.000 $3,200.000 $3,025.000
GUARDRAIL END TREATMENT (REMOVE)
EA 2.000 $275.000 $200.000 $233.000 $220.000
CRASH CUSH ATTEN (REMOVE)
EA 2.000 $1,800.000 $1,000.000 $1,200.000 $1,100.000
CRASH CUSH ATTEN (INSTL)(L)(N)(TL3)
EA 2.000 $30,000.000 $26,900.000 $32,000.000 $29,590.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 3.000 $800.000 $806.000 $940.000 $660.000
IN SM RD SN SUP&AM TYS80(1)SA(U)
EA 2.000 $1,200.000 $1,086.000 $1,250.000 $792.000
IN SM RD SN SUP&AM TYTWT(1)WS(P)
EA 22.000 $470.000 $434.000 $500.000 $792.000
IN SM RD SN SUP&AM TYTWT(1)WS(T)
EA 3.000 $850.000 $560.000 $650.000 $792.000
REMOVE SM RD SN SUP&AM
EA 42.000 $105.000 $89.000 $100.000 $132.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 16.000 $90.000 $45.000 $53.000 $50.000
WK ZN PAV MRK NON-REMOV (W)4"(BRK)
LF 9,180.000 $0.500 $1.000 $0.550 $0.550
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 100.000 $3.000 $6.000 $7.000 $6.600
WK ZN PAV MRK NON-REMOV (Y)4"(BRK)
LF 9,180.000 $0.600 $1.000 $0.550 $0.550
WK ZN PAV MRK REMOV (REFL) TY II-A-A
EA 2,550.000 $1.500 $3.500 $4.000 $3.850
WK ZN PAV MRK SHT TERM RMV (W)(4")
LF 71,280.000 $1.500 $0.010 $1.450 $2.500
WK ZN PAV MRK SHT TERM RMV (Y)(4")
LF 50,960.000 $1.500 $0.010 $1.450 $2.500
REFL PAV MRK TY I (W)8"(SLD)(100MIL)
LF 1,430.000 $2.700 $1.000 $1.150 $1.100
REFL PAV MRK TY I (W)12"(SLD)(100MIL)
LF 100.000 $2.700 $5.000 $5.850 $5.500
REFL PAV MRK TY I (W)24"(SLD)(100MIL)
LF 726.000 $7.000 $6.000 $7.000 $6.600
REFL PAV MRK TY I (Y)24"(SLD)(100MIL)
LF 325.000 $6.000 $6.000 $7.000 $6.600
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 765.000 $13.000 $13.000 $15.000 $14.300
PREFAB PAV MRK TY C (W) (ARROW)
EA 15.000 $300.000 $205.000 $240.000 $225.500
PREFAB PAV MRK TY C (W) (LNDP ARROW)
EA 4.000 $580.000 $300.000 $350.000 $330.000
PREFAB PAV MRK TY C (W) (WORD)
EA 5.000 $350.000 $255.000 $300.000 $280.500
PREFAB PAV MRK TY C (W) (36")(YLD TRI)
EA 14.000 $33.000 $65.000 $76.000 $71.500
PREFAB PAV MRK TY C (Y) (24") (SLD)
LF 264.000 $14.000 $13.000 $15.000 $14.300
REFL PAV MRKR TY I-C
EA 516.000 $4.400 $3.600 $4.000 $4.000
REFL PAV MRKR TY II-A-A
EA 1,033.000 $4.400 $3.600 $4.000 $4.000
ELIM EXT PAV MRK & MRKS (4")
LF 42,650.000 $1.500 $0.480 $0.550 $0.550
SP MIXES SP-D SAC-A PG70-22
TON 4,449.000 $175.000 $144.000 $151.000 $145.000
SP MIXES SP-D SAC-A PG76-22
TON 14,247.000 $170.000 $142.250 $150.000 $144.000
TACK COAT
GAL 45,426.000 $4.500 $0.010 $3.350 $5.400
CEMENT
TON 159.000 $300.000 $195.000 $295.000 $290.000
EMULSION
GAL 141,428.000 $4.500 $3.870 $3.750 $4.650
EMUL TRTMNT (MX EXIST MATL) 10"
SY 32,512.000 $7.000 $9.750 $7.300 $5.000
INSTALL BRIDGE IDENTIFICATION NUMBERS
EA 2.000 $500.000 $1,900.210 $550.000 $305.000
INSTALL FTB
LF 1,500.000 $75.000 $58.000 $33.000 $63.800
REMOVE FTB
LF 1,500.000 $30.000 $8.000 $6.000 $8.800
PORTABLE CHANGEABLE MESSAGE SIGN
EA 4.000 $20,000.000 $17,000.000 $8,500.000 $24,000.000
PREFORMED CENTERLINE RUMBLE STRIP
LF 4,470.000 $3.790 $4.200 $5.000 $4.650
REFL PAV MRK AWT (W) 6" (SLD) (100MIL)
LF 41,310.000 $0.600 $0.650 $0.750 $0.750
REFL PAV MRK AWT (W) 6" (BRK) (100MIL)
LF 10,340.000 $0.600 $0.650 $0.750 $0.750
REFL PAV MRK AWT (W) 6" (DOT) (100MIL)
LF 200.000 $1.100 $1.000 $1.150 $1.100
REFL PAV MRK AWT (Y) 6" (SLD) (100MIL)
LF 41,310.000 $0.500 $0.650 $0.750 $0.750
REFL PAV MRK AWT (Y) 6" (BRK) (100MIL)
LF 4,760.000 $0.600 $0.650 $0.750 $0.750
TMA (STATIONARY)
DAY 149.000 $300.000 $150.000 $90.000 $200.000
TMA (MOBILE OPERATION)
DAY 13.000 $300.000 $0.010 $90.000 $200.000
Totals: $8,086,312.600 $6,277,174.340 $6,894,560.970 $7,714,881.710