TYLER FM 3065 (3092-01-009)

Items: 42

County: TYLER
Length: N/A
Highway: FM 3065
District: BEAUMONT
Control Number: 3092-01-009
DBE Goal: N/A
Project: STP 1702(511)HES
Guaranty: N/A
Time: 118 WORKING DAYS
Engineer's Estimate: $1,167,518.17
Date: 07/12/2017 (8 years ago)
Contract Number: N/A
Type: SAFETY TREAT FIXED OBJECTS
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (5)
E
Engineer's Estimate
$1,167,518.17
$1,224,577.50
Over/Under Est: 4.89% $57,059.33
Over/Under Est: 8.4% $98,019.84
Amt Left: 3.34% $40,960.51
$1,482,351.48
Over/Under Est: 26.97% $314,833.31
Amt Left: 21.05% $257,773.98
Delta: -17.13% -$216,813.47
Over/Under Est: 43.65% $509,611.33
Amt Left: 36.96% $452,552.00
Delta: -13.14% -$194,778.02
$1,734,799.00
Over/Under Est: 48.59% $567,280.83
Amt Left: 41.67% $510,221.50
Delta: -3.44% -$57,669.50

Bid Items & Bid Tabulations

42 Total 0 of 42
TYLER  |  FM 3065  |  BEAUMONT  |  3092-01-009  |  07/12/2017  |  $1,167,518.17  |  STP 1702(511)HES  |  SAFETY TREAT FIXED OBJECTS  |  118 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
OLDCASTLE MATERIALS TEXAS, INC.
DREWERY CONSTRUCTION COMPANY, INCORPORATED
A. L. HELMCAMP, INC.
LONGVIEW BRIDGE AND ROAD, LTD.
FNH CONSTRUCTION, LLC
SUBGRADE WIDENING (ORD COMP)
STA 130.800 $494.150 $360.000 $235.000 $430.000 $420.000 $550.000
EMBANKMENT (FINAL)(ORD COMP)(TY B)
CY 49.000 $11.270 $19.000 $42.000 $38.000 $28.000 $100.000
BACKFILL (TY B)
STA 130.800 $235.420 $30.000 $245.000 $220.000 $265.000 $250.000
BROADCAST SEED (TEMP) (WARM)
AC 2.730 $1,096.580 $755.000 $785.000 $900.000 $650.000 $2,000.000
BROADCAST SEED (TEMP) (COOL)
AC 2.730 $1,096.580 $755.000 $785.000 $900.000 $650.000 $2,000.000
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
AC 5.460 $1,388.620 $1,360.000 $1,415.000 $2,000.000 $3,000.000 $2,000.000
VEGETATIVE WATERING
MG 556.000 $15.000 $17.000 $0.010 $15.000 $33.000 $45.000
FL BS(RDWY DEL)(TY D GR 1-2)(FNAL POS)
CY 4,518.000 $40.000 $70.000 $70.000 $85.000 $100.000 $72.500
CEMENT
TON 684.000 $171.400 $190.000 $189.000 $220.000 $260.000 $161.000
CEMENT TREAT (MX EXST MTL & NW BS)(8")
SY 40,694.000 $4.000 $2.950 $3.750 $4.000 $3.000 $3.500
PRIME COAT & BLOTTER (RC-250)
GAL 8,139.000 $3.500 $3.550 $3.000 $4.000 $4.500 $6.000
ASPH (AC-20XP)
GAL 29,300.000 $3.790 $2.980 $2.490 $4.000 $4.500 $5.000
AGGR(TY-L GR-5 SAC-B)
CY 326.000 $118.000 $163.000 $134.000 $170.000 $196.000 $300.000
AGGR(TY-PD GR-3 SAC-B)
CY 314.000 $175.000 $214.000 $150.000 $170.000 $236.000 $300.000
AGGR(TY-PD GR-4 SAC-B)
CY 314.000 $175.000 $189.000 $150.000 $170.000 $236.000 $300.000
CONC BOX CULV (8 FT X 4 FT)(EXTEND)
LF 16.000 $879.000 $915.000 $1,300.000 $950.000 $1,900.000 $1,000.000
WINGWALL (PW - 2) (HW=5 FT)
EA 2.000 $11,600.000 $14,050.000 $13,300.000 $15,000.000 $12,000.000 $10,000.000
SET (TY II) (18 IN) (RCP) (6: 1) (P)
EA 4.000 $760.150 $1,010.000 $760.000 $1,100.000 $1,200.000 $2,000.000
SET (TY II) (30 IN) (RCP) (3: 1) (C)
EA 2.000 $1,845.000 $2,510.000 $1,050.000 $3,000.000 $1,800.000 $4,000.000
REMOV STR (WINGWALL)
EA 3.000 $1,722.860 $2,510.000 $775.000 $3,000.000 $1,700.000 $1,500.000
REMOV STR (PIPE)
LF 8.000 $16.370 $40.500 $38.000 $50.000 $110.000 $30.000
MOBILIZATION
LS 1.000 $79,583.000 $85,300.000 $123,000.000 $128,000.000 $140,000.000 $160,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 8.000 $3,600.000 $1,000.000 $2,300.000 $6,000.000 $2,400.000 $8,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 360.000 $27.450 $29.750 $31.000 $35.000 $28.000 $30.000
ROCK FILTER DAMS (REMOVE)
LF 360.000 $9.460 $8.050 $8.400 $5.000 $12.000 $15.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 1,160.000 $5.380 $5.050 $5.250 $7.000 $5.500 $16.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,160.000 $0.950 $0.760 $0.800 $1.000 $1.250 $8.000
INTERSECTIONS (SURF TREAT)
SY 1,500.000 $17.500 $14.500 $36.000 $20.000 $36.000 $45.000
DRIVEWAYS (CONC)
SY 61.000 $101.540 $131.000 $103.000 $140.000 $207.000 $100.000
DRIVEWAYS (SURF TREAT)
SY 539.000 $40.000 $32.850 $36.000 $20.000 $43.000 $45.000
TURNOUTS (SURF TREAT)
SY 441.000 $51.000 $70.000 $28.000 $20.000 $41.000 $45.000
MAILBOX INSTALL-S (TWW-POST) TY 4
EA 8.000 $220.680 $226.000 $235.000 $240.000 $450.000 $650.000
MAILBOX INSTALL-D (TWW-POST) TY 4
EA 7.000 $225.000 $236.000 $245.000 $250.000 $500.000 $650.000
MAILBOX INSTALL-M (TWW-POST) TY 4
EA 3.000 $531.000 $496.000 $520.000 $530.000 $550.000 $650.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 39.000 $444.660 $316.000 $445.000 $350.000 $400.000 $550.000
INSTL OM ASSM (OM-2Z)(FLX)GND
EA 6.000 $58.000 $40.500 $50.000 $50.000 $62.000 $100.000
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 1,293.000 $1.090 $1.380 $1.350 $0.700 $3.000 $5.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 25,342.000 $0.390 $0.320 $0.350 $0.320 $0.500 $0.500
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 570.000 $0.440 $0.360 $0.700 $0.360 $1.000 $2.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 22,432.000 $0.410 $0.320 $0.350 $0.320 $0.500 $0.500
PREFAB PAV MRK TY C (W) (24") (SLD)
LF 170.000 $11.090 $12.050 $13.150 $15.000 $15.000 $2.000
REFL PAV MRKR TY II-A-A
EA 313.000 $3.010 $3.260 $5.000 $3.500 $6.000 $15.000
Totals: $1,167,518.038 $1,224,577.500 $1,265,538.010 $1,482,351.480 $1,677,129.500 $1,734,799.000