TYLER FM 1745 (1584-01-031)

Items: 72

County: TYLER
Length: N/A
Highway: FM 1745
District: BEAUMONT
Control Number: 1584-01-031
DBE Goal: N/A
Project: F 2B23(155)
Guaranty: N/A
Time: 346 WORKING DAYS
Engineer's Estimate: $12,891,431.31
Date: 08/02/2023 (2 years ago)
Contract Number: N/A
Type: SURFACING/ROADWAY RESTORATION
Mail/Deliver Bids To: N/A
DAVE COLLINS
TAYLOR KANE
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (1)
E
Engineer's Estimate
$12,891,431.31
Over/Under Est: 50.02% $6,448,767.70
Subcontractor Percentage Amount
TEXAS MATERIALS GROUP, INC. 20.81% $4,060,132.63
J & M CONTRACTING, COMPANY 3.53% $688,720.24
DREWERY BROS. TREE SERVICE, INC. 2.71% $528,734.23
TRP CONSTRUCTION GROUP, LLC 1.67% $325,825.16
ROWC ENERGY SERVICES, LLC 1.54% $300,461.52
AMERICAN REMEDIATION OPTIONS, INC. 1.45% $282,902.08
PANOLA SIGN & BARRICADE, INC. 0.30% $58,531.47
FREDONIA SERVICES LLC 0.23% $44,874.12
WEST TEXAS ROCK RESOURCES, LLC 0.13% $25,363.63
FREDONIA SERVICES LLC 0.10% $19,510.49
CHEROKEE SERVICES 0.09% $17,559.44
NEXT CONSTRUCTION SOLUTIONS LLC 0.08% $15,608.39
Total: 32.64% $6,368,223.40

Bid Items & Bid Tabulations

72 Total 0 of 72
TYLER  |  FM 1745  |  BEAUMONT  |  1584-01-031  |  08/02/2023  |  $12,891,431.31  |  F 2B23(155)  |  SURF/ROADWAY RESTOR  |  346 WORKING DAYS
Alt
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
PREPARING ROW
STA 718.650 $100.000 $995.000
REMOVING CONC (RIPRAP)
SY 964.000 $19.000 $20.000
SUBGRADE WIDENING (DENS CONT)
STA 718.650 $800.000 $750.000
BACKFILL (TY B)
STA 718.650 $322.000 $195.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 49,645.000 $1.000 $0.450
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 16,549.000 $0.540 $0.450
CELL FBR MLCH SEED(TEMP)(WARM)
SY 33,097.000 $0.500 $0.430
CELL FBR MLCH SEED(TEMP)(COOL)
SY 33,097.000 $0.440 $0.430
VEGETATIVE WATERING
MG 557.000 $14.000 $40.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 31,274.000 $70.000 $191.500
REWORK BS MATL (TY C)(9")(ORD COMP)
SY 207,611.000 $2.500 $2.500
CEMENT
TON 2,927.000 $250.000 $345.000
CEMENT TREAT (MX EXST MTL & NW BS)(9")
SY 207,611.000 $2.000 $5.700
ASPH (RC-250)
GAL 74,740.000 $5.700 $5.600
AGGR(TY-L GR-5 SAC-B)
CY 1,597.000 $235.000 $235.000
CEM STABIL BKFL
CY 22.000 $123.000 $290.000
CL E CONC (SEAL SLAB)
CY 55.000 $500.000 $460.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 40.000 $174.000 $400.000
CLEANING AND SEALING JOINTS (CL 7)
LF 280.000 $37.000 $72.000
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
LF 12.000 $1,200.000 $1,200.000
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
LF 20.000 $820.000 $1,400.000
CONC BOX CULV (9 FT X 9 FT)(EXTEND)
LF 32.000 $1,480.000 $2,900.000
WINGWALL (PW - 2) (HW=11 FT)
EA 2.000 $70,200.000 $69,000.000
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
EA 6.000 $7,920.000 $11,500.000
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
EA 10.000 $13,160.000 $17,500.000
SET (TY II) (24 IN) (RCP) (4: 1) (C)
EA 16.000 $1,860.000 $2,300.000
SET (TY II) (24 IN) (RCP) (6: 1) (P)
EA 16.000 $1,800.000 $3,500.000
REMOV STR (HEADWALL)
EA 6.000 $2,600.000 $2,300.000
MOBILIZATION
LS 1.000 $1,350,000.000 $1,650,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 24.000 $6,000.000 $4,300.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 460.000 $57.000 $49.000
ROCK FILTER DAMS (REMOVE)
LF 460.000 $18.000 $9.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 3,660.000 $5.800 $6.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 3,660.000 $1.550 $1.150
DRIVEWAYS (CONC)
SY 23.000 $170.000 $290.000
DRIVEWAYS (ACP)
SY 3,771.000 $45.000 $47.000
DRIVEWAYS (SURF TREAT)
SY 1,896.000 $50.000 $78.000
TURNOUTS (ACP)
SY 2,153.000 $80.000 $90.000
RUMBLE STRIPS (SHOULDER)
LF 143,730.000 $0.150 $0.200
RUMBLE STRIPS (CENTERLINE)
LF 71,865.000 $0.210 $0.200
MTL W-BEAM GD FEN (TIM POST)
LF 900.000 $27.000 $30.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 8.000 $2,240.000 $3,400.000
REMOVE METAL BEAM GUARD FENCE
LF 2,160.000 $4.900 $10.000
REMOVE TERMINAL ANCHOR SECTION
EA 16.000 $268.000 $345.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 8.000 $255.000 $500.000
GUARDRAIL END TREATMENT (INSTALL)
EA 8.000 $3,165.000 $3,400.000
MAILBOX INSTALL-S (TWG-POST) TY 2
EA 46.000 $270.000 $260.000
MAILBOX INSTALL-D (TWG-POST) TY 2
EA 6.000 $270.000 $290.000
MAILBOX INSTALL-M (TWG-POST) TY 2
EA 4.000 $520.000 $615.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 150.000 $540.000 $500.000
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
EA 4.000 $820.000 $820.000
IN SM RD SN SUP&AM TYS80(1)SA(P)
EA 10.000 $760.000 $970.000
IN SM RD SN SUP&AM TYS80(1)SA(T)
EA 2.000 $1,290.000 $1,120.000
REMOVE SM RD SN SUP&AM
EA 166.000 $105.000 $150.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 12.000 $33.000 $29.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 22.000 $39.000 $43.000
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
EA 54.000 $82.500 $120.000
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
LF 17,840.000 $0.400 $0.600
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
LF 206,748.000 $0.470 $0.620
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
EA 8,089.000 $1.550 $1.700
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 143,618.000 $0.570 $0.850
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 8,920.000 $0.520 $0.900
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 103,374.000 $0.610 $0.850
REFL PAV MRKR TY II-A-A
EA 1,813.000 $5.640 $6.910
RELOCATE RDSD FLASH BEACON ASSEMBLY
EA 2.000 $3,300.000 $9,200.000
SP MIXES SP-C PG70-22
TON 23,460.000 $170.000 $187.000
TACK COAT
GAL 12,457.000 $4.370 $6.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $15,000.000 $20,000.000
TMA (STATIONARY)
DAY 313.000 $225.000 $270.000
TMA (MOBILE OPERATION)
DAY 33.000 $540.000 $55.000
1
RC PIPE (CL III)(24 IN)
LF 218.000 $122.000 $200.000
1A
THERMOPLASTIC PIPE (PP) (24")
LF 218.000 $122.000 $0.000
Totals: $12,918,027.310 $19,340,199.010