PREPARING ROW
|
STA
|
718.650
|
$100.000
|
$995.000
|
|
|
|
REMOVING CONC (RIPRAP)
|
SY
|
964.000
|
$19.000
|
$20.000
|
|
|
|
SUBGRADE WIDENING (DENS CONT)
|
STA
|
718.650
|
$800.000
|
$750.000
|
|
|
|
BACKFILL (TY B)
|
STA
|
718.650
|
$322.000
|
$195.000
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
|
SY
|
49,645.000
|
$1.000
|
$0.450
|
|
|
|
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
|
SY
|
16,549.000
|
$0.540
|
$0.450
|
|
|
|
CELL FBR MLCH SEED(TEMP)(WARM)
|
SY
|
33,097.000
|
$0.500
|
$0.430
|
|
|
|
CELL FBR MLCH SEED(TEMP)(COOL)
|
SY
|
33,097.000
|
$0.440
|
$0.430
|
|
|
|
VEGETATIVE WATERING
|
MG
|
557.000
|
$14.000
|
$40.000
|
|
|
|
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
|
CY
|
31,274.000
|
$70.000
|
$191.500
|
|
|
|
REWORK BS MATL (TY C)(9")(ORD COMP)
|
SY
|
207,611.000
|
$2.500
|
$2.500
|
|
|
|
CEMENT
|
TON
|
2,927.000
|
$250.000
|
$345.000
|
|
|
|
CEMENT TREAT (MX EXST MTL & NW BS)(9")
|
SY
|
207,611.000
|
$2.000
|
$5.700
|
|
|
|
ASPH (RC-250)
|
GAL
|
74,740.000
|
$5.700
|
$5.600
|
|
|
|
AGGR(TY-L GR-5 SAC-B)
|
CY
|
1,597.000
|
$235.000
|
$235.000
|
|
|
|
CEM STABIL BKFL
|
CY
|
22.000
|
$123.000
|
$290.000
|
|
|
|
CL E CONC (SEAL SLAB)
|
CY
|
55.000
|
$500.000
|
$460.000
|
|
|
|
RIPRAP (STONE PROTECTION)(18 IN)
|
CY
|
40.000
|
$174.000
|
$400.000
|
|
|
|
CLEANING AND SEALING JOINTS (CL 7)
|
LF
|
280.000
|
$37.000
|
$72.000
|
|
|
|
CONC BOX CULV (5 FT X 3 FT)(EXTEND)
|
LF
|
12.000
|
$1,200.000
|
$1,200.000
|
|
|
|
CONC BOX CULV (5 FT X 4 FT)(EXTEND)
|
LF
|
20.000
|
$820.000
|
$1,400.000
|
|
|
|
CONC BOX CULV (9 FT X 9 FT)(EXTEND)
|
LF
|
32.000
|
$1,480.000
|
$2,900.000
|
|
|
|
WINGWALL (PW - 2) (HW=11 FT)
|
EA
|
2.000
|
$70,200.000
|
$69,000.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 4 FT)(4:1) (C)
|
EA
|
6.000
|
$7,920.000
|
$11,500.000
|
|
|
|
SET (TY I)(S= 5 FT)(HW= 5 FT)(4:1) (C)
|
EA
|
10.000
|
$13,160.000
|
$17,500.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (4: 1) (C)
|
EA
|
16.000
|
$1,860.000
|
$2,300.000
|
|
|
|
SET (TY II) (24 IN) (RCP) (6: 1) (P)
|
EA
|
16.000
|
$1,800.000
|
$3,500.000
|
|
|
|
REMOV STR (HEADWALL)
|
EA
|
6.000
|
$2,600.000
|
$2,300.000
|
|
|
|
MOBILIZATION
|
LS
|
1.000
|
$1,350,000.000
|
$1,650,000.000
|
|
|
|
BARRICADES, SIGNS AND TRAFFIC HANDLING
|
MO
|
24.000
|
$6,000.000
|
$4,300.000
|
|
|
|
ROCK FILTER DAMS (INSTALL) (TY 2)
|
LF
|
460.000
|
$57.000
|
$49.000
|
|
|
|
ROCK FILTER DAMS (REMOVE)
|
LF
|
460.000
|
$18.000
|
$9.000
|
|
|
|
BIODEG EROSN CONT LOGS (INSTL) (12")
|
LF
|
3,660.000
|
$5.800
|
$6.000
|
|
|
|
BIODEG EROSN CONT LOGS (REMOVE)
|
LF
|
3,660.000
|
$1.550
|
$1.150
|
|
|
|
DRIVEWAYS (CONC)
|
SY
|
23.000
|
$170.000
|
$290.000
|
|
|
|
DRIVEWAYS (ACP)
|
SY
|
3,771.000
|
$45.000
|
$47.000
|
|
|
|
DRIVEWAYS (SURF TREAT)
|
SY
|
1,896.000
|
$50.000
|
$78.000
|
|
|
|
TURNOUTS (ACP)
|
SY
|
2,153.000
|
$80.000
|
$90.000
|
|
|
|
RUMBLE STRIPS (SHOULDER)
|
LF
|
143,730.000
|
$0.150
|
$0.200
|
|
|
|
RUMBLE STRIPS (CENTERLINE)
|
LF
|
71,865.000
|
$0.210
|
$0.200
|
|
|
|
MTL W-BEAM GD FEN (TIM POST)
|
LF
|
900.000
|
$27.000
|
$30.000
|
|
|
|
MTL BEAM GD FEN TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$2,240.000
|
$3,400.000
|
|
|
|
REMOVE METAL BEAM GUARD FENCE
|
LF
|
2,160.000
|
$4.900
|
$10.000
|
|
|
|
REMOVE TERMINAL ANCHOR SECTION
|
EA
|
16.000
|
$268.000
|
$345.000
|
|
|
|
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
|
EA
|
8.000
|
$255.000
|
$500.000
|
|
|
|
GUARDRAIL END TREATMENT (INSTALL)
|
EA
|
8.000
|
$3,165.000
|
$3,400.000
|
|
|
|
MAILBOX INSTALL-S (TWG-POST) TY 2
|
EA
|
46.000
|
$270.000
|
$260.000
|
|
|
|
MAILBOX INSTALL-D (TWG-POST) TY 2
|
EA
|
6.000
|
$270.000
|
$290.000
|
|
|
|
MAILBOX INSTALL-M (TWG-POST) TY 2
|
EA
|
4.000
|
$520.000
|
$615.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
|
EA
|
150.000
|
$540.000
|
$500.000
|
|
|
|
IN SM RD SN SUP&AM TY10BWG(1)SA(T)
|
EA
|
4.000
|
$820.000
|
$820.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(P)
|
EA
|
10.000
|
$760.000
|
$970.000
|
|
|
|
IN SM RD SN SUP&AM TYS80(1)SA(T)
|
EA
|
2.000
|
$1,290.000
|
$1,120.000
|
|
|
|
REMOVE SM RD SN SUP&AM
|
EA
|
166.000
|
$105.000
|
$150.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
|
EA
|
12.000
|
$33.000
|
$29.000
|
|
|
|
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
|
EA
|
22.000
|
$39.000
|
$43.000
|
|
|
|
INSTL OM ASSM (OM-2Z)(WFLX)GND(BI)
|
EA
|
54.000
|
$82.500
|
$120.000
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(BRK)
|
LF
|
17,840.000
|
$0.400
|
$0.600
|
|
|
|
WK ZN PAV MRK NON-REMOV (Y)6"(SLD)
|
LF
|
206,748.000
|
$0.470
|
$0.620
|
|
|
|
WK ZN PAV MRK SHT TERM (TAB)TY Y-2
|
EA
|
8,089.000
|
$1.550
|
$1.700
|
|
|
|
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
|
LF
|
143,618.000
|
$0.570
|
$0.850
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
|
LF
|
8,920.000
|
$0.520
|
$0.900
|
|
|
|
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
|
LF
|
103,374.000
|
$0.610
|
$0.850
|
|
|
|
REFL PAV MRKR TY II-A-A
|
EA
|
1,813.000
|
$5.640
|
$6.910
|
|
|
|
RELOCATE RDSD FLASH BEACON ASSEMBLY
|
EA
|
2.000
|
$3,300.000
|
$9,200.000
|
|
|
|
SP MIXES SP-C PG70-22
|
TON
|
23,460.000
|
$170.000
|
$187.000
|
|
|
|
TACK COAT
|
GAL
|
12,457.000
|
$4.370
|
$6.000
|
|
|
|
PORTABLE CHANGEABLE MESSAGE SIGN
|
EA
|
2.000
|
$15,000.000
|
$20,000.000
|
|
|
|
TMA (STATIONARY)
|
DAY
|
313.000
|
$225.000
|
$270.000
|
|
|
|
TMA (MOBILE OPERATION)
|
DAY
|
33.000
|
$540.000
|
$55.000
|
|
1
|
|
RC PIPE (CL III)(24 IN)
|
LF
|
218.000
|
$122.000
|
$200.000
|
|
1A
|
|
THERMOPLASTIC PIPE (PP) (24")
|
LF
|
218.000
|
$122.000
|
$0.000
|
|
Totals: |
$12,918,027.310
|
$19,340,199.010
|