TYLER CR (0920-13-037)

Items: 35

County: TYLER
Length: N/A
Highway: CR
District: BEAUMONT
Control Number: 0920-13-037
DBE Goal: N/A
Project: BR 2022(103)
Guaranty: N/A
Time: 60 WORKING DAYS
Engineer's Estimate: $613,985.50
Date: 06/30/2022 (3 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (2)
E
Engineer's Estimate
$613,985.50
$746,699.95
Over/Under Est: 21.62% $132,714.45
Over/Under Est: 28.34% $173,990.64
Amt Left: 5.53% $41,276.19

Bid Items & Bid Tabulations

35 Total 0 of 35
TYLER  |  CR  |  BEAUMONT  |  0920-13-037  |  06/30/2022  |  $613,985.50  |  BR 2022(103)  |  BRIDGE REPL  |  60 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
TEXAS MATERIALS GROUP, INC.
CROSS PLUS CONSTRUCTION, LLC
PREPARING ROW (TREE) (6" TO 24" DIA)
EA 10.000 $2,380.000 $7,425.000 $5,500.000
OBLITERATING ABANDONED ROAD
SY 101.000 $35.000 $56.000 $110.000
EXCAVATION (ROADWAY)
CY 77.000 $23.000 $25.000 $28.000
SUBGRADE WIDENING (ORD COMP)
STA 1.000 $800.000 $1,950.000 $5,500.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 458.000 $50.000 $48.000 $110.000
EMBANKMENT (FINAL)(ORD COMP)(TY D)
CY 77.000 $50.000 $53.000 $55.000
BROADCAST SEED (PERM) (RURAL) (SANDY)
SY 410.000 $5.000 $2.600 $11.000
BROADCAST SEED (TEMP) (WARM)
SY 205.000 $2.000 $5.100 $11.000
BROADCAST SEED (TEMP) (COOL)
SY 205.000 $2.000 $5.100 $11.000
VEGETATIVE WATERING
MG 3.400 $420.000 $122.000 $1,100.000
PROOF ROLLING
HR 10.000 $100.000 $98.000 $1,100.000
FL BS (CMP IN PLC)(TYA GR1-2)(FNAL POS)
CY 133.000 $210.000 $174.000 $83.000
PRIME COAT (AE-P)
GAL 188.000 $22.000 $8.000 $11.000
CEM STABIL BKFL
CY 50.000 $230.000 $209.000 $330.000
PRESTR CONC PIL (18 IN SQ)
LF 339.000 $168.000 $205.000 $127.000
CL C CONC (ABUT)
CY 21.400 $2,000.000 $2,250.000 $2,750.000
REINF CONC SLAB (SLAB BEAM)
SF 1,300.000 $30.000 $66.000 $55.000
APPROACH SLAB
CY 52.000 $800.000 $655.000 $385.000
PRESTR CONC SLAB BEAM (5SB15)
LF 247.110 $250.000 $315.000 $374.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 189.000 $200.000 $103.000 $330.000
RAIL (TY T223)
LF 131.000 $160.000 $223.000 $275.000
ARMOR JOINT
LF 44.000 $120.000 $118.000 $248.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $35,000.000 $64,460.000 $22,000.000
MOBILIZATION
LS 1.000 $80,000.000 $73,000.000 $77,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 4.000 $3,000.000 $3,500.000 $5,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 50.000 $60.000 $56.000 $22.000
ROCK FILTER DAMS (REMOVE)
LF 50.000 $16.000 $11.250 $22.000
MTL W-BEAM GD FEN (TIM POST)
LF 75.000 $40.000 $41.000 $55.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,250.000 $2,310.000 $3,300.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $300.000 $3,210.000 $4,400.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 8.000 $21.000 $45.000 $110.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $28.000 $54.000 $110.000
TACK COAT
GAL 94.000 $16.000 $10.000 $11.000
D-GR HMA TY-D PG 64-22 (EXEMPT)
TON 104.000 $350.000 $220.000 $440.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $10,000.000 $11,700.000 $2,200.000
Totals: $613,985.500 $746,699.950 $787,976.140