Show Job Controls
Bid Cobra

TYLER FM 256 (0877-03-025)

Items: 56

County: TYLER
Length: N/A
Highway: FM 256
District: BEAUMONT
Control Number: 0877-03-025
DBE Goal: N/A
Project: BR 2018(849)
Guaranty: N/A
Time: 75 WORKING DAYS
Engineer's Estimate: $578,911.40
Date: 05/01/2018 (8 years ago)
Contract Number: N/A
Type: REPLACE BRIDGE AND APPROACHES
Mail/Deliver Bids To: N/A
SEE PLANS OR PROPOSAL BOOK
Actions:
Notice HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (4)
E
Engineer's Estimate
$578,911.40
Over/Under Est: -6.78% -$39,222.50
Over/Under Est: -2.86% -$16,542.59
Amt Left: 4.2% $22,679.91
Over/Under Est: 4.64% $26,855.80
Amt Left: 12.24% $66,078.30
Delta: -7.72% -$43,398.39
Over/Under Est: 14.31% $82,870.90
Amt Left: 22.62% $122,093.40
Delta: -9.25% -$56,015.10

Bid Items & Bid Tabulations

56 Total 0 of 56
TYLER  |  FM 256  |  BEAUMONT  |  0877-03-025  |  05/01/2018  |  $578,911.40  |  BR 2018(849)  |  REPLACE BRIDGE AND APPROACHES  |  75 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
DREWERY CONSTRUCTION COMPANY, INCORPORATED
LONGVIEW BRIDGE AND ROAD, LTD.
OLDCASTLE MATERIALS TEXAS, INC.
HODGES AND SON CONSTRUCTION COMPANY, INC.
PREP ROW (TREE)(LESS THAN 24" DIA)
EA 3.000 $500.000 $900.000 $800.000 $500.000 $2,000.000
PREP ROW (TREE)(GREATER THAN 24" DIA)
EA 1.000 $1,000.000 $1,000.000 $2,400.000 $615.000 $4,000.000
REMOVING CONCRETE(MOW STRIP)
LF 690.000 $8.000 $9.000 $7.000 $6.900 $10.000
EXCAVATION (CHANNEL)
CY 50.000 $30.000 $20.000 $60.000 $15.000 $40.000
SUBGRADE WIDENING (ORD COMP)
STA 6.000 $500.000 $440.000 $1,100.000 $850.000 $2,000.000
EMBANKMENT (FINAL)(ORD COMP)(TY C)
CY 50.000 $20.000 $30.000 $50.000 $26.000 $40.000
BACKFILL (TY A OR B)
STA 6.000 $200.000 $425.000 $400.000 $250.000 $500.000
BROADCAST SEED (TEMP) (WARM)
SY 503.000 $0.150 $1.050 $0.010 $1.000 $3.000
BROADCAST SEED (TEMP) (COOL)
SY 503.000 $0.150 $1.050 $0.010 $1.000 $3.000
CELL FBR MLCH SEED(PERM)(RURAL)(SANDY)
SY 1,106.000 $0.300 $1.050 $2.000 $1.000 $2.000
VEGETATIVE WATERING
MG 9.300 $20.000 $45.000 $15.000 $41.000 $1.000
FL BS(RDWY DEL)(TY D GR 1-2)(FNAL POS)
CY 299.000 $100.000 $67.000 $100.000 $88.700 $80.000
REWORK BS MTL (TY C) (8") (ORD COMP)
SY 1,335.000 $4.000 $5.000 $2.650 $4.000 $15.000
CEMENT
TON 30.000 $200.000 $205.000 $300.000 $161.000 $250.000
CEMENT TREAT (MX EXST MTL & NW BS)(8")
SY 1,823.000 $2.500 $4.700 $3.000 $3.150 $12.000
PRIME COAT (RC-250)
GAL 365.000 $4.000 $10.000 $10.000 $5.800 $10.000
ASPH (AC-15P)
GAL 657.000 $4.000 $6.000 $7.000 $4.300 $10.000
AGGR (TY-PD GR-4 OR TY-PL GR-4)(SAC-B)
CY 18.000 $200.000 $355.000 $350.000 $305.000 $700.000
AGGR (TY-D GR-5 OR TY-L GR-5)
CY 16.000 $200.000 $340.000 $340.000 $305.000 $700.000
CEM STABIL BKFL
CY 27.000 $100.000 $175.000 $250.000 $86.000 $250.000
PRESTR CONC PIL (20 IN SQ)
LF 735.000 $120.000 $100.000 $127.000 $85.000 $120.000
CL C CONC (ABUT)
CY 20.800 $1,000.000 $1,050.000 $1,000.000 $1,400.000 $1,000.000
CL C CONC (BENT)
CY 8.000 $1,500.000 $1,200.000 $1,250.000 $2,100.000 $1,200.000
REINF CONC SLAB (SLAB BEAM)
SF 1,928.000 $20.000 $18.000 $14.000 $23.000 $20.000
APPROACH SLAB
CY 46.000 $250.000 $500.000 $180.000 $685.000 $500.000
PRESTR CONC SLAB BEAM (4SB12)
LF 472.000 $120.000 $135.000 $150.000 $119.000 $200.000
RIPRAP (STONE PROTECTION)(18 IN)
CY 289.000 $300.000 $175.000 $150.000 $125.000 $120.000
RIPRAP (MOW STRIP)(4 IN)
CY 34.000 $500.000 $480.000 $500.000 $520.000 $500.000
RAIL (TY T223)
LF 144.000 $132.000 $127.000 $123.000 $140.000 $100.000
ARMOR JOINT (SEALED)
LF 56.000 $100.000 $107.000 $75.000 $124.000 $75.000
REMOV STR (BRIDGE 0 - 99 FT LENGTH)
EA 1.000 $30,000.000 $15,000.000 $15,000.000 $58,500.000 $15,000.000
MOBILIZATION
LS 1.000 $50,000.000 $45,000.000 $50,000.000 $60,000.000 $55,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 5.000 $2,000.000 $1,500.000 $1,700.000 $1,600.000 $2,500.000
ROCK FILTER DAMS (INSTALL) (TY 2)
LF 115.000 $40.000 $31.000 $30.000 $30.000 $10.000
ROCK FILTER DAMS (REMOVE)
LF 115.000 $10.000 $8.400 $8.000 $8.100 $10.000
BACKHOE WORK (EROSION & SEDMT CONT)
HR 20.000 $80.000 $115.000 $150.000 $166.000 $5.000
CONSTRUCTION PERIMETER FENCE
LF 1,360.000 $3.500 $3.700 $3.850 $7.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (18")
LF 260.000 $5.000 $5.800 $6.000 $5.600 $15.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 1,620.000 $1.000 $1.050 $1.100 $1.000 $2.000
BIODEG EROSN CONT LOGS (INSTL) (6")
LF 1,360.000 $3.500 $4.200 $4.400 $4.050 $8.000
MTL W-BEAM GD FEN (TIM POST)
LF 400.000 $20.000 $20.000 $21.000 $19.250 $25.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $1,500.000 $2,800.000 $1,500.000 $1,370.000 $1,200.000
REMOVE METAL BEAM GUARD FENCE
LF 350.000 $2.500 $4.740 $2.750 $2.550 $2.000
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $250.000 $180.000 $250.000 $227.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 4.000 $2,100.000 $2,200.000 $2,300.000 $2,125.000 $2,600.000
GUARDRAIL END TREATMENT (REMOVE)
EA 4.000 $300.000 $300.000 $300.000 $280.000 $200.000
RELOCATE SM RD SN SUP&AM TY 10BWG
EA 3.000 $500.000 $470.000 $415.000 $380.000 $500.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 2.000 $20.000 $16.000 $16.500 $15.100 $50.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 8.000 $20.000 $28.000 $30.000 $27.500 $50.000
PAVEMENT SEALER 4"
LF 200.000 $0.250 $1.050 $1.100 $1.000 $2.000
RE PM W/RET REQ TY I (W)4"(SLD)(100MIL)
LF 1,320.000 $0.400 $1.900 $2.000 $1.850 $4.000
RE PM W/RET REQ TY I (Y)4"(BRK)(100MIL)
LF 180.000 $0.450 $2.100 $2.200 $2.050 $10.000
RE PM W/RET REQ TY I (Y)4"(SLD)(100MIL)
LF 593.000 $0.400 $1.900 $2.000 $1.850 $4.000
REFL PAV MRKR TY II-A-A
EA 18.000 $6.000 $10.500 $11.000 $10.100 $40.000
PORTABLE CHANGEABLE MESSAGE SIGN
EA 2.000 $5,000.000 $5,000.000 $10,000.000 $11,700.000 $6,000.000
TMA (MOBILE OPERATION)
HR 8.000 $20.000 $50.000 $50.000 $46.000 $500.000
Totals: $578,911.400 $539,688.900 $562,368.810 $605,767.200 $661,782.300