TYLER US 190 (0213-07-047)

Items: 91

County: TYLER
Length: N/A
Highway: US 190
District: BEAUMONT
Control Number: 0213-07-047
DBE Goal: N/A
Project: BR 2023(993)
Guaranty: N/A
Time: 370 WORKING DAYS
Engineer's Estimate: $30,504,774.46
Date: 06/28/2023 (2 years ago)
Contract Number: N/A
Type: BRIDGE REPLACEMENT
Mail/Deliver Bids To: N/A
BRYCE BROUSSARD
JIM GRISSOM
Actions:
Notice HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$30,504,774.46
$37,497,100.90
Over/Under Est: 22.92% $6,992,326.44
$58,498,801.56
Over/Under Est: 91.77% $27,994,027.10
Amt Left: 56.01% $21,001,700.66
$64,612,440.57
Over/Under Est: 111.81% $34,107,666.11
Amt Left: 72.31% $27,115,339.67
Delta: -10.45% -$6,113,639.01
Subcontractor Percentage Amount
TOM-MAC, INC. 4.32% $1,650,360.52
ROMAR UNLIMITED, INC. 4.31% $1,646,540.24
CHOICE PIPELINE SERVICES, LLC 3.09% $1,180,466.20
TORO BRAVO CONSTRUCTION, LLC 0.51% $194,834.23
TRAFFIC SIGNS & LINES, LLC 0.21% $80,225.86
EPOXY DESIGN SYSTEMS, INC. 0.04% $15,281.12
TOLUNAY-WONG ENGINEERS, INC. 0.01% $3,820.28
Total: 12.49% $4,771,528.45

Bid Items & Bid Tabulations

91 Total 0 of 91
TYLER  |  US 190  |  BEAUMONT  |  0213-07-047  |  06/28/2023  |  $30,504,774.46  |  BR 2023(993)  |  BRIDGE REPL  |  370 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
ISI CONTRACTING, INC.
A. L. HELMCAMP, INC.
WEBBER, LLC
PREPARING ROW
STA 31.000 $6,750.000 $4,700.000 $50,000.000 $144,920.110
REMOVING STAB BASE & ASPH PAV (10"-12")
SY 11,283.000 $5.000 $4.500 $25.000 $20.000
EXCAVATION (ROADWAY)
CY 53,576.000 $20.000 $23.000 $30.000 $19.050
EXCAVATION (CHANNEL)
CY 34,578.000 $24.000 $23.000 $40.000 $25.000
EMBANKMENT (FINAL)(DENS CONT)(TY C)
CY 19,513.000 $25.000 $59.000 $70.000 $38.000
EMBANKMENT (FINAL) (DENS CONT) (TY C1)
CY 1,618.000 $18.000 $147.000 $225.000 $175.210
CELL FBR MLCH SEED(PERM)(RURAL)(CLAY)
SY 7,652.000 $1.000 $1.000 $0.770 $0.700
VEGETATIVE WATERING
MG 193.200 $50.000 $48.000 $25.000 $48.660
PROOF ROLLING
HR 40.000 $130.000 $95.000 $120.000 $200.000
FL BS (RDWY DEL)(TY A GR 1-2)(FNAL POS)
CY 2,997.000 $90.000 $99.000 $225.000 $159.190
LIME (HYD, COM OR QK)(SLURRY)
TON 104.000 $486.000 $390.000 $400.000 $389.230
LIME TRT (SUBGRADE)(8")
SY 4,811.000 $5.000 $19.500 $12.000 $10.000
CEMENT
TON 227.000 $250.000 $295.000 $300.000 $238.660
CEMENT TREAT (SUBGRADE) (8")
SY 4,997.000 $8.000 $11.000 $12.000 $10.000
CEMENT TREAT (NEW BASE)(11")
SY 9,808.000 $15.000 $11.000 $12.000 $10.000
ASPH (RC-250)
GAL 1,982.000 $11.000 $16.000 $12.000 $8.720
AGGR (TY-D GR-5 OR TY-L GR-5)
CY 79.000 $125.000 $575.000 $900.000 $515.880
PLANE ASPH CONC PAV (2"-3 1/2")
SY 672.000 $7.000 $18.000 $35.000 $25.000
CEM STABIL BKFL
CY 178.000 $195.000 $100.000 $250.000 $336.000
TEMPORARY SPL SHORING
SF 30,982.000 $30.000 $49.000 $50.000 $85.000
TEMPORARY SPL SHORING (COFFERDAM)
SF 23,348.000 $25.000 $60.000 $100.000 $85.000
FOUNDATION LOAD TEST (D4945) (PILE)
EA 6.000 $12,000.000 $11,000.000 $15,000.000 $55,225.810
PRESTR CONC PIL (24 IN SQ)
LF 24,874.000 $200.000 $240.000 $400.000 $324.340
CL C CONC (ABUT)
CY 62.200 $1,415.000 $1,450.000 $2,000.000 $2,450.000
CL C CONC (CAP)
CY 828.200 $1,650.000 $1,925.000 $3,200.000 $2,875.000
CL C CONC (COLUMN)
CY 78.800 $1,800.000 $2,450.000 $3,800.000 $2,625.000
CL C CONC (FOOTING)
CY 327.600 $1,600.000 $2,400.000 $3,800.000 $2,775.000
REINF CONC SLAB
SF 164,680.000 $25.000 $26.000 $42.000 $32.500
APPROACH SLAB
CY 73.800 $750.000 $875.000 $1,500.000 $825.000
PRESTR CONC GIRDER (TX40)
LF 21,354.000 $250.000 $160.000 $200.000 $259.090
RIPRAP (STONE PROTECTION)(18 IN)
CY 11,035.000 $200.000 $270.000 $250.000 $265.000
RIPRAP (MOW STRIP)(4 IN)
CY 236.000 $590.000 $1,000.000 $900.000 $1,050.000
RAIL (TY SSTR)
LF 7,220.000 $85.000 $55.000 $80.000 $62.530
SEALED EXPANSION JOINT (4 IN) (SEJ - M)
LF 678.000 $210.000 $145.000 $200.000 $225.000
REMOV STR (BRIDGE 100 - 499 FT LENGTH)
EA 1.000 $100,000.000 $600,000.000 $600,000.000 $1,975,000.000
REMOV STR (BRIDGE 1000 FT OR GREATER)
EA 1.000 $1,000,000.000 $2,500,000.000 $2,000,000.000 $4,950,000.000
MOBILIZATION
LS 1.000 $2,012,861.000 $3,700,000.000 $5,500,000.000 $6,500,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 25.000 $8,000.000 $7,250.000 $10,000.000 $65,000.000
ROCK FILTER DAMS (INSTALL) (TY 1)
LF 108.000 $40.000 $59.000 $60.500 $55.000
ROCK FILTER DAMS (REMOVE)
LF 108.000 $22.000 $18.500 $19.800 $18.000
CONSTRUCTION EXITS (INSTALL) (TY 1)
SY 312.000 $34.000 $36.000 $38.500 $35.000
CONSTRUCTION EXITS (REMOVE)
SY 312.000 $10.000 $13.000 $13.200 $12.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 4,577.000 $6.000 $5.000 $4.950 $4.500
TEMP SEDMT CONT FENCE (REMOVE)
LF 4,577.000 $2.000 $2.000 $1.380 $1.250
CONSTRUCTING DETOURS
SY 2,140.000 $100.000 $57.000 $200.000 $230.000
PCTB FUR&INSTL(F-SHAPE OR SNGL SLP)TY1
LF 5,520.000 $36.000 $37.000 $90.000 $79.000
PCTB MOVE&RESET(F-SHAPE OR SNGL SLPTY1
LF 4,200.000 $12.000 $9.000 $25.000 $9.100
PORT CTB REMOVE(F-SHAPE OR SNGL SLP)TY1
LF 5,520.000 $16.000 $6.200 $25.000 $18.220
RUMBLE STRIPS (SHOULDER) ASPHALT
LF 5,560.000 $0.500 $1.500 $2.130 $2.000
RUMBLE STRIPS (CENTERLINE) ASPHALT
LF 2,780.000 $0.500 $1.500 $3.160 $2.000
MTL W-BEAM GD FEN (TIM POST)
LF 4,925.000 $34.000 $22.000 $26.400 $25.330
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 4.000 $2,320.000 $1,900.000 $2,145.000 $3,500.000
MTL BM GD FEN TRANS (31"-28")(25')
EA 2.000 $550.000 $850.000 $825.000 $2,000.000
REMOVE METAL BEAM GUARD FENCE
LF 7,867.500 $5.000 $2.000 $2.750 $5.000
RM MTL BM GD FEN TRANS (T101)
EA 4.000 $750.000 $210.000 $275.000 $200.000
GUARDRAIL END TREATMENT (INSTALL)
EA 2.000 $3,400.000 $3,200.000 $3,190.000 $5,500.000
GUARDRAIL END TREATMENT (REMOVE)
EA 6.000 $325.000 $275.000 $275.000 $2,500.000
CRASH CUSH ATTEN (MOVE & RESET)
EA 5.000 $2,000.000 $2,000.000 $1,227.360 $3,450.000
CRASH CUSH ATTEN (REMOVE)
EA 4.000 $1,344.440 $500.000 $2,045.600 $2,500.000
CRASH CUSH ATTEN (INSTL)(S)(N)(TL3)
EA 4.000 $10,100.000 $8,000.000 $9,546.030 $11,150.000
IN SM RD SN SUP&AM TY10BWG(1)SA(P)
EA 2.000 $800.000 $650.000 $673.750 $612.500
REMOVE SM RD SN SUP&AM
EA 7.000 $150.000 $90.000 $93.500 $85.000
IN SRSS & AM (RAIL)(90 MPH)(P MOUNT)
EA 1.000 $6,550.000 $3,650.000 $3,814.800 $3,468.000
IN SRSS & AM (RAIL)(90 MPH)(T MOUNT)
EA 2.000 $8,350.000 $4,000.000 $3,924.800 $3,568.000
INSTL DEL ASSM (D-SW)SZ (BRF)CTB (BI)
EA 72.000 $33.000 $18.000 $17.600 $16.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2(BI)
EA 46.000 $37.000 $23.000 $26.400 $21.000
WK ZN PAV MRK NON-REMOV (W)4"(SLD)
LF 6,226.000 $0.500 $1.000 $0.830 $0.750
WK ZN PAV MRK NON-REMOV (W)24"(SLD)
LF 12.000 $8.000 $9.000 $8.800 $8.000
WK ZN PAV MRK REMOV (W)4"(SLD)
LF 14,298.000 $1.000 $1.000 $0.720 $0.650
WK ZN PAV MRK REMOV (W)24"(SLD)
LF 1,140.000 $14.000 $4.000 $4.400 $4.000
WK ZN PAV MRK REMOV (Y)4"(SLD)
LF 8,951.000 $1.000 $1.000 $0.720 $0.650
PAVEMENT SEALER 6"
LF 24,952.000 $1.000 $1.000 $0.090 $0.080
RE PM W/RET REQ TY I (W)6"(SLD)(090MIL)
LF 13,000.000 $0.900 $1.000 $0.750 $0.680
RE PM W/RET REQ TY I (Y)6"(BRK)(090MIL)
LF 150.000 $0.900 $2.000 $2.200 $2.000
RE PM W/RET REQ TY I (Y)6"(SLD)(090MIL)
LF 11,802.000 $0.600 $1.000 $0.750 $0.680
REFL PAV MRKR TY II-A-A
EA 157.000 $7.500 $9.000 $8.800 $8.000
ELIM EXT PAV MRK & MRKS (4")
LF 13,687.000 $1.500 $1.000 $0.390 $0.350
PAV SURF PREP FOR MRK (6")
LF 14,480.000 $0.350 $1.000 $0.070 $0.060
TEMP TRAF SIGNALS
EA 3.000 $75,000.000 $23,000.000 $50,000.000 $65,000.000
FILTER FABRIC (TY 2)
SY 31,609.000 $4.000 $4.200 $9.000 $0.210
D-GR HMA TY-C PG70-22 (LEVEL-UP)
TON 56.000 $140.000 $117.000 $300.000 $499.000
TACK COAT
GAL 369.000 $8.000 $10.000 $7.000 $6.000
SP MIXES SP-C SAC-A PG76-22
TON 1,109.000 $140.000 $143.000 $250.000 $255.000
TACK COAT
GAL 5,885.000 $11.000 $6.000 $7.000 $6.000
TEMP CONSTRUCTION ACCESS
LS 1.000 $250,000.000 $500,000.000 $6,000,000.000 $7,500,000.000
GEOGRID REINFORCE EMBANKMENTS (TY A)
SY 179,660.000 $3.000 $4.800 $4.000 $0.220
GEOGRID REINFORCE EMBANKMENTS (TY B)
SY 24,590.000 $2.000 $14.000 $4.000 $0.450
AMPHIBIAN/REPTILE EXCLUSION FENCE INST
LF 4,817.000 $7.000 $16.000 $6.000 $5.000
AMPHIBIAN/REPTILE EXCLUSION FENCE REM
LF 4,817.000 $7.000 $8.500 $2.000 $1.250
TMA (STATIONARY)
DAY 10.000 $250.000 $500.000 $400.000 $675.000
TMA (MOBILE OPERATION)
DAY 5.000 $350.000 $760.000 $800.000 $1,000.000
Totals: $30,504,774.460 $37,497,100.900 $58,498,801.565 $64,612,440.572