Show Job Controls
Bid Cobra

TRAVIS IH0035 (6468-22-001)

Items: 31

County: TRAVIS
Length: 0.0100 MILES
Highway: IH0035
District: AUSTIN
Control Number: 6468-22-001
DBE Goal: N/A
Project: RMC - A00210097
Guaranty: $18,000.00
Time: 102 WORKING DAYS
Engineer's Estimate: $889,217.05
Date: 08/13/2025 (10 months ago) Changed
Contract Number: 8251401
Type: TRAFFIC SIGNAL MAINTENANCE
Project ID: A00210097
Project Description: HUB BUILDING REPLACEMENT
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: MAINTENANCE CONTRACT OFFICE
7901 N IH 35, AUSTIN, TX 78753
MAHENDRAN THIVAKARAN
YETNAYET BOGALE
CORY JUCIUS
DAVID GOLDSTEIN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Pay Estimates:
Bidders (1)
E
Engineer's Estimate
$889,217.05
Over/Under Est: -7.54% -$67,068.73

Bid Items & Bid Tabulations

31 Total 0 of 31
TRAVIS  |  IH0035  |  AUSTIN  |  6468-22-001  |  08/13/2025  |  $889,217.05  |  RMC - A00210097  |  TRAF SIGNAL MAINT  |  102 WORKING DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
LUMIN8 TRANSPORTATION TECHNOLOGIES, LLC
SPOT SODDING
SY 8.000 $11.000 $104.000
VEGETATIVE WATERING
TGL 0.300 $75.000 $2,312.000
SOIL RETENTION BLANKETS (CL 1) (TY B)
SY 12.000 $2.300 $24.000
FLOWABLE BACKFILL
CY 12.000 $145.000 $786.000
MOBILIZATION
LS 1.000 $80,750.000 $40,000.000
BARRICADES, SIGNS AND TRAFFIC HANDLING
MO 6.000 $4,500.000 $9,046.000
TMA (STATIONARY)
DAY 25.000 $300.000 $530.000
TMA (MOBILE OPERATION)
DAY 5.000 $360.000 $530.000
BIODEG EROSN CONT LOGS (INSTL) (12")
LF 600.000 $4.600 $47.000
BIODEG EROSN CONT LOGS (REMOVE)
LF 600.000 $2.110 $12.000
MTL W-BEAM GD FEN (TIM POST)
LF 30.000 $19.270 $231.170
REMOVE METAL BEAM GUARD FENCE
LF 30.000 $1.870 $77.000
CONDT (PVC) (SCH 40) (2")
LF 60.000 $22.000 $56.000
CONDT (PVC) (SCH 40) (3")
LF 240.000 $26.000 $150.000
CONDT (PVC) (SCH 80) (2") (BORE)
LF 60.000 $34.000 $82.000
CONDUIT (PREPARE)
LF 770.000 $4.000 $54.030
ELEC CONDR (NO.14) INSULATED
LF 85.000 $1.650 $2.750
ELEC CONDR (NO.6) BARE
LF 150.000 $2.190 $4.300
ELEC CONDR (NO.6) INSULATED
LF 300.000 $3.230 $4.800
ITS GND BOX(PCAST) TY 2 (366036)W/APRN
EA 4.000 $9,300.000 $10,300.000
GROUND BOX TY A (122311)W/APRON
EA 4.000 $2,000.000 $1,872.000
REMOVE GROUND BOX
EA 1.000 $541.000 $2,945.000
SYSTEM INTEGRATION
LS 6.000 $42,000.000 $6,332.000
GROUND BOX (PREPARE)
EA 11.000 $200.000 $2,714.830
FIBER OPTIC FUSION SPLICE
EA 3,012.000 $40.000 $37.270
FIBER OPTIC PATCH PANEL (144 POSITIONS)
EA 20.000 $8,000.000 $1,592.470
RELOCATE FIBER OPTIC CABLE
LF 595.000 $6.000 $9.400
REMOVE HUB BUILDING
EA 6.000 $8,000.000 $8,500.000
ITS GRND MNT CAB (TY 6)(CONF 2)
EA 6.000 $16,600.000 $31,050.000
RELOCATE EXISTING ITS HUB EQUIPMENT
EA 6.000 $1,800.000 $6,332.000
SUBSURFACE UTIL LOCATE (OUTSIDE RDBED)
EA 12.000 $760.000 $1,950.000
Totals: $889,217.050 $822,148.320