Show Job Controls
Bid Cobra

TRAVIS IH0035 (6468-15-001) Cancelled

Items: 55

County: TRAVIS
Length: 0.0100 MILES
Highway: IH0035
District: AUSTIN
Control Number: 6468-15-001
DBE Goal: N/A
Project: RMC - A00210089
Guaranty: $74,000.00
Time: 730 CALENDAR DAYS
Engineer's Estimate: $3,745,615.00
Date: 04/03/2025 (1 year ago)
Contract Number: 3254205
Type: METAL BEAM GUARD FENCE REPAIR
Project ID: A00210089
Project Description: REPAIR, REPLACE, AND UPGRADE MBGF
Mail/Deliver Bids To:
TEXAS DEPARTMENT OF TRANSPORTATION
ATTN: CONSTRUCTION DIVISION - RM M1C3.02
6230 E STASSNEY LN, AUSTIN, TX 78744
MATTHEW KELLY
KEVIN MACKAN
Actions:
Notice Questions HCS Excel Tabs Print Print Notice
Bidders (3)
E
Engineer's Estimate
$3,745,615.00
$2,534,513.00
Over/Under Est: -32.33% -$1,211,102.00
Over/Under Est: 18.35% $687,376.00
Amt Left: 74.91% $1,898,478.00
Over/Under Est: 20.61% $772,035.00
Amt Left: 78.25% $1,983,137.00
Delta: -1.91% -$84,659.00

Bid Items & Bid Tabulations

55 Total 0 of 55
TRAVIS  |  IH0035  |  AUSTIN  |  6468-15-001  |  04/03/2025  |  $3,745,615.00  |  RMC - A00210089  |  METAL BEAM GUARD FENCE REPAIR  |  730 CALENDAR DAYS
Item Code
Description
Unit
Quantity
Engineer's Estimate
BK FIELD OPERATIONS LLC
ROY JORGENSEN ASSOCIATES, INC.
T&L CLEANING SERVICES LLC
REMOV CONC (MOWSTRIP)
LF 10.000 $67.000 $100.000 $25.000 $100.000
RIPRAP (MOW STRIP)(4 IN)
CY 40.000 $875.000 $200.000 $725.000 $500.000
RAIL (HANDRAIL)(TY B)
LF 150.000 $120.000 $80.000 $225.000 $300.000
RETROFIT RAIL (TY T221)
LF 200.000 $380.000 $1.000 $650.000 $250.000
MOBILIZATION (CALLOUT 1)
EA 2,000.000 $280.000 $1.000 $0.010 $1.000
PORTABLE CHANGEABLE MESSAGE SIGN
DAY 80.000 $100.000 $200.000 $150.000 $150.000
TMA (STATIONARY)
DAY 700.000 $200.000 $1.000 $1.000 $1.000
TEMP SEDMT CONT FENCE (INSTALL)
LF 20.000 $4.000 $2.000 $5.000 $5.000
TEMP SEDMT CONT FENCE (REMOVE)
LF 20.000 $2.000 $1.000 $3.000 $5.000
MTL W-BEAM GD FEN (TIM POST)
LF 5,000.000 $30.000 $0.100 $15.000 $30.000
MTL W-BEAM GD FEN (STEEL POST)
LF 500.000 $30.000 $1.000 $20.000 $40.000
MTL BEAM GD FEN TRANS (THRIE-BEAM)
EA 15.000 $2,000.000 $1.000 $1,300.000 $1,800.000
DRIVEWAY TERMINAL ANCHOR SECTION
EA 5.000 $1,500.000 $1.000 $1.000 $2,000.000
DOWNSTREAM ANCHOR TERMINAL SECTION
EA 60.000 $1,500.000 $1,000.000 $1,750.000 $1,800.000
MTL BM GD FEN TRANS (ANCHOR PLATE)
EA 10.000 $600.000 $1,000.000 $1,500.000 $700.000
REMOVE METAL BEAM GUARD FENCE
LF 5,000.000 $5.000 $0.100 $2.000 $1.000
REMOVE TERMINAL ANCHOR SECTION
EA 40.000 $250.000 $1,250.000 $750.000 $100.000
RM MTL BM GD FENCE TRANS (THRIE-BEAM)
EA 15.000 $250.000 $1.000 $500.000 $2,000.000
GUARDRAIL END TREATMENT (INSTALL)
EA 25.000 $3,000.000 $1.000 $3,200.000 $2,500.000
CHAIN LINK FENCE (INSTALL) (8')
LF 200.000 $60.000 $1.000 $25.000 $10.000
INSTL DEL ASSM (D-SW)SZ 1(BRF)GF2
EA 200.000 $53.000 $1,000.000 $50.000 $30.000
INSTL DEL ASSM (D-SY)SZ 1(BRF)GF2
EA 100.000 $60.000 $1,000.000 $30.000 $30.000
REPLACE RAIL ELEMENT (W-BEAM)
LF 20,000.000 $20.000 $5.000 $28.000 $28.000
REPLACE RAIL ELEMENT (THRIE-BEAM)
LF 300.000 $45.000 $120.000 $40.000 $30.000
REPL RAIL ELMNT(THRIE-BM TRANS TO W-BM)
EA 150.000 $45.000 $35.000 $450.000 $30.000
REPLACE SHORT RADIUS SYS (TL-2)
EA 3.000 $5,000.000 $1.000 $1.000 $15,000.000
REPLACE SHORT RADIUS SYS (TL-3)
EA 3.000 $5,000.000 $1.000 $1.000 $25,000.000
REPLACE TIMBER POST W/O CONC FND
EA 1,000.000 $100.000 $200.000 $225.000 $30.000
REPLACE STEEL POST W/O CONC FND
EA 1,000.000 $100.000 $1.000 $80.000 $50.000
REPLACE TIMBER POST W/ CONC FND
EA 500.000 $50.000 $300.000 $200.000 $60.000
REPLACE STEEL POST W/ CONC FND
EA 500.000 $50.000 $1.000 $90.000 $100.000
REALIGN POSTS
EA 600.000 $20.000 $1.000 $20.000 $10.000
REPAIR OF TERMINAL ANCHORS POSTS
EA 50.000 $100.000 $1.000 $100.000 $50.000
REPLACE TERMINAL ANCHOR POSTS
EA 250.000 $55.100 $1.000 $200.000 $50.000
REM OBSOLETE GET & REPL W/ SGT
EA 450.000 $2,750.000 $1,900.000 $3,200.000 $5,000.000
REPL SINGLE GDRAIL TERM IMPACT HEAD
EA 150.000 $95.000 $1,740.000 $2,000.000 $1,000.000
REPLACE SINGLE GDRAIL TERMINAL RAIL
LF 4,500.000 $25.000 $25.000 $38.000 $30.000
REPLACE SINGLE GDRAIL TERMINAL POST
EA 600.000 $25.000 $60.000 $120.000 $50.000
REPLACE BLOCKOUT
EA 2,500.000 $10.000 $6.000 $27.500 $10.000
REPAIR STEEL POST WITH BASE PLATE
EA 30.000 $325.000 $100.000 $325.000 $200.000
REPLACE SGT CABLE ANCHOR
EA 50.000 $25.000 $600.000 $80.000 $70.000
REPLACE SGT CABLE ASSEMBLY
EA 50.000 $25.000 $600.000 $80.000 $70.000
REPLACE SGT STRUT
EA 40.000 $30.000 $100.000 $80.000 $70.000
REPLACE DOWNSTREAM ANCHOR TERMINAL
EA 150.000 $50.000 $1.000 $1,150.000 $150.000
REPAIR RAIL ELEMENT (CURVED RAIL)
LF 1,500.000 $35.000 $40.000 $45.000 $30.000
REPLACE POSTS (TL-4)(GIBRALTAR)
EA 150.000 $200.000 $1.000 $180.000 $180.000
REPLACE POSTS (TL-4)(TRINITY)
EA 150.000 $200.000 $590.000 $360.000 $220.000
CABLE SPLICE / TURNBUCKLE (TL-4)
EA 1.000 $2,500.000 $2,000.000 $3,000.000 $100.000
REPR OR REPLC CABLE BARR TERM SEC(TL-4)
EA 50.000 $1,750.000 $200.000 $1,250.000 $1,500.000
REPLACE CABLE (TL-4)
LF 350.000 $8.000 $0.100 $4.000 $1.000
REPLACE (NARROW QUAD)
EA 6.000 $10,000.000 $10,000.000 $27,500.000 $25,000.000
REPAIR (NARROW QUAD)
LF 4.000 $1,000.000 $1,400.000 $5,000.000 $2,500.000
REPLACE (WIDE QUAD)
EA 2.000 $17,000.000 $1.000 $5,000.000 $40,000.000
REPAIR (WIDE QUAD)
LF 5.000 $1,050.000 $1,000.000 $5,000.000 $5,000.000
REPAIR (T101)
LF 40.000 $55.000 $30.000 $500.000 $100.000
Totals: $3,745,615.000 $2,534,513.000 $4,432,991.000 $4,517,650.000